Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹17.0 L
EMD Value
₹17,000
Closing Date
27 Oct 2026, 6:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
district development officer naliya
CONSTRUCTION OF DIFF WORKS (WATERTANK, PIPELINE AND AVADO) AT DIFF VILLAGES OF ABDASA (PKG/02)
354778
01-2026/2027
Open
Civil - All
Works
Kutch
7 documents required · 7 mandatory
₹900
Taluka Devlopement Officer, Naliya-Kachchh
₹17,000
13 Oct 2026
13 Oct 2026
13 Oct 2026
27 Oct 2026
13 Oct 2026
NAME OF WORK: CONSTRUCTION OF DIFF WORKS (WATERTANK, PIPELINE AND AVADO) AT DIFF VILLAGES OF ABDASA (PKG/02)
It.No. Estimated Item Rate In Unit Amount
Quantity Figure Words
1 1143.93 Excavation for foundation upto 1.5 m depth including 157.33 Rupees One Hundred Fifty cmt.
sorting out and stacking of useful materials and disposing off the excavated stuff upto Seven and Thirty Two Paise
50 Meter lead.(B) Dense or Hard soil (S.O.R. P.No-67,Item Code-04001B , ) Only
2 28.17 Providing and laying cement concrete 1:4:8 (1- Cement : 2769.69 Rupees Two Thousand cmt.
4- coarse sand : 8- hand broken stone aggregates 40 mm Seven Hundred Sixty Nine
nominal size) and curing complete excluding cost of and Sixty Nine Paise Only
formwork in Foundation and Plinth (S.O.R. P.No-73,Item Code-05004A , I. No.5.3.3)
3 12.50 Providing & laying C.C. 1:1.5:3& finishing smooth with curing etc. complete including 6632.87 Rupees Six Thousand Six cmt.
the cost of form work but excluding the cost of reinforcement for R.C.C work Hundred Thirty Two and
in.Foundation (As per R A) Eighty Six Paise Only
4 34.25 Providing & laying C.C. 1:1.5:3& finishing smooth with curing etc. complete 8125.50 Rupees Eight Thousand One cmt.
including the cost of form work but excluding the cost of reinforcement for R.C.C Hundred Twenty Five and
work in.wall (As per R A) Fifty Paise Only
5 18.11 Providing and Laying ordinary cement concrete 1:2:4 (1- 7475.61 Rupees Seven Thousand cmt.
Cement 2- coarse sand : 4- graded stone aggregates 20 mm nominal size) and Four Hundred Seventy Five
finishing smooth with curing etc. complete including the cost of formwork but and Sixty Paise Only
excluding the cost of reinforsement for R.C.C work in (ii) Slabs having more than 8 cm
and upto 10 cm.thickness ( S.O.R. P - 78, I Code 05026B,It No.0.0)
6 4344.40 Providing TMT Bar FE 415 reinforcement for R.C.C. workincluding bending, binding 68.33 Rupees Sixty Eight and kg.
and placing in position completeupto floor two level ( S.O.R. Thirty Two Paise Only
P.No-74,Item Code-05014BA, I. No.5.4.11 )
7 488.53 Providing 15mm thick cement plaster in single coat on Rough (Similar)side of single or 180.40 Rupees One Hundred Eighty smt.
half brick walls for interior plastering upto floor two level and finished even and and Thirty Nine Paise Only
smooth in (i) Cement mortar 1:3 (1-cement:3-sand) (
S.O.R. P.No-136,Item Code-17002A, I. No.17.6 )
8 2357.00 Providing and fixing to wall, ceilling and floor 6.kg f/cm2 working pressure 96.96 Rupees Ninety Six and Rmt.
polyethylene pipe of the following outside dia. Low density, complete with special Ninety Six Paise Only
flange compression type fittings wall clamps etc. including mking goof the wall
ceilling and floor (i) 75mm { GWSSB Revised S.O.R.P. no.7
It.No. Estimated Item Rate In Unit Amount
Quantity Figure Words
9 2357.00 Lowering, laying and jointing PVC pipes and specials of following class and diametgr 15.15 Rupees Fifteen and Fifteen Rmt.
including cost of conveyance from stores to site of works including coat of labour, Paise Only
material, except cement solvent, giving satisfactory hydraulic testing as per lSl code
(GWSSB S.O.R. no. 37 Item.no 8.3 }
10 1123.00 Filling avaible excavated with (excluding rock) in trenches, plinth,sides of foundation 136.92 Rupees One Hundred Thirty Cmt.
etc. in layers not exceeding 20 cm in depth consolidating each deposited layer by Six and Ninety One Paise
ramming and watering (S.O.R. page no. 69, Item no. 04006-4.12) Only
11 10.00 Providng & fixing number plate of marble stone of required size set in C.M. 1:4 306.14 Rupees Three Hundred Six Nos.
including finishing engraving lettering etc comp. ( and Fourteen Paise Only
S.O.R. P.No-186,Item Code-26087)
12 5.66 Providing and laying cement concrete work 1:2:4 (1- Cement : 2- Coarse sand : 4- 4374.77 Rupees Four Thousand cmt.
graded stone aggregates 20 mm nominal size) and curing complete excluding cost Three Hundred Seventy
offormwork and reinforcement for reinforced concrete work in (K)Vertical and Four and Seventy Seven
Horizontial its upto floor two level. Paise Only
13 75.06 Providing formwork of ordinary timber planking so as to give a rough finish including 243.86 Rupees Two Hundred Forty cmt.
centering shuttering strutting and propping etc. height of propping and centering Three and Eighty Six Paise
below supporting floor to ceiling not exceeding 4 M. and removal of the same for in Only
situ reinforced concrete and plain concrete work in. (C) Vertical surface such as walls
(any thickness) partitions and the like including attached buttresses & string course &
14 145.20 Providing 20mm. thick cement plaster in single coat on fair side Brick/concrete walls 235.51 Rupees Two Hundred Thirty cmt.
for interior plastering upto floor two level and finished even and smooth in :C.M.1:3 Five and Fifty One Paise
(1cement:3sand) Only
15 16.08 Providing and laying cement concrete 1:2:4 (1- Cement : 2- Coarse sand : 4- graded 3638.79 Rupees Three Thousand Six cmt.
stone aggregates 20 mm nominal size) and curing complete excluding cost of Hundred Thirty Eight and
formwork in (A) Foundation and Plinth Seventy Nine Paise Only
16 1.00 Providing & Fixing Stop Valve 100mm 1308.96 Rupees One Thousand Three Nos.
Hundred Eight and Ninety
Rupees Sixteen Lakh Ninety Seven Thousand Six Hundred Seventy Seven and Twenty eight Paise Only
I/We am/are willing to carry out the work @............... % above/below ( Percent should be written in figures and
words ) The tendered amount mentioned above amount of my /our tender works out as under
Estimated amount put to tender Rs. 1697677.28 Estimated amount put to tender Rs.
Add ……...% above Rs…………………. Deduct ……...% Below Rs………………….
It.No. Estimated Item Rate In Unit Amount
Quantity Figure Words
(Please strike out which ever is not applicable )
1 All work shall be carried out as per public works department handbook and other specifications of division or as directed.
2 Rates quoted inclusive of clearance of sight (prior to commencement of work and at its close) in all respect
and hold good for work under all conditions , sight, moisture, weather etc
3 one percent labor cess will be deducted from the valued work done as per ' Bulding and other construction
work welfare cess act' G.R. No. GHR - 2005/04/CWA/2004/841/M-3 Dt. 31/01/2005
TALUKA DEVELOPMENT OFFICER
Signature of the Contractor. TALUKA PANCHAYAT OFFICE
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
GRs - 1.pdf
GRs - 2.pdf
Perforamance Security Price variation modificatin.pdf
Electric specification 11.pdf
A - GENERAL TECHNICAL SPECIFICATIONS FOR BUILDING WORKS.pdf
SBD PKG -2.pdf
SCH-B.pdf
Speci Index.pdf
Testing.pdf
Work List.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .