Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 CrAccepted-AOC | ₹1.6 Cr Quoted ₹1.63 | L1 | Accepted-AOC FIRST LOWEST ACCEPTED |
| 2 | L2₹3.73+₹2.10 (128.8%)Rejected-AOC 403 4TH FLOOR PARK CENTRA NH 8 SECTOR 30 GURGAON HARYANA 122001 | GURUGRAM | HARYANA | 122001 | ₹3.73+₹2.10 (128.8%) | L2 | Rejected-AOC SECOND LOWEST |
Tender Value
Refer Docs
EMD Value
₹1 L
Closing Date
27 Nov 2020, 2:00 pmClosed
Superintending Engineer
O/o Superintending Engineer, Sewerage Circle, Jalabhavan, KWA, TVM
Preparation of DER/DPR for Rehabilitation of the Existing Sewerage system and Providing Sewerage/Septage Management system for uncovered areas of Thiruvananathapuram Corporation
2020_KWA_397781_1
1/KWA/SE/SEW/TVM/EOI/2020-2021
Open Tender
Consultancy
EOI
240 days
Thiruvananthapuram Corporation
As per Notice Inviting Expression Of Interest
8 documents required · 8 mandatory
₹7,500
Yes
₹1 L
Yes
Sewerage Circle, KWA, TVM
4 Feb 2021
6 Nov 2020
30 Nov 2020
6 Nov 2020
27 Nov 2020
6 Nov 2020
6 Nov 2020 - 12 Nov 2020
12 Nov 2020
Amount
Preparation of DER/DPR after surveying, investigating, analyzing, planning, designing including preparing Environmental Impact Assessment including Social Impact Assessment comprising of detailed drawings and estimates for the most feasible solutions for Sewerage and Septage management in Thiruvananthapuram Corporation area including all men, material, equipments and expertise, engaging necessary staff reqired for the satisfactory completion of the DER (Work includes submission of inception report at the end of first month, survey report with preliminary hydraulic model by the 3rd month, submission of comprehensive master plan by the 4th month, submission of detailed project report with EIA and social impact assesment at the end of 6th month, submission of detailed project report with cost estimates, financial and economic analysis, drawings and bid documents for first priority projects by the 7th month,submission of detailed project report with cost estimates, financial and economic analysis, drawings, bid documents for remaining projects by the 8th month as detailed in the scope of assignment (General and Annexure I) and as directed by the departmental officers. Power point presentation also to be made after submission of each report.)
Voyants Solutions Private Limited
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .