Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹1.1 L+₹1,345 (1.24%)Rejected-Finance | L2 | Rejected-Finance Not L1 | |
| 3 | L3₹1.1 L+₹3,845 (3.54%)Rejected-Finance | L3 | Rejected-Finance Not L1 |
Tender Value
₹1.1 L
Closing Date
27 Nov 2019, 3:00 pmClosed
Maj GS Pandey, GE (AF) Bhuj
GE (AF) Bhuj Bhuj-Kutch PIN - 370001
Maintenance and repair works are required to be carried out to EOT Crane 2.0 Ton capacity SM No 341/7003-CN/10 installed at PMS-I at AF Stn Bhuj
2019_MES_298623_1
3020/eQ/47/19-20/E3
Limited
Job Works
Item Rate
30 days
GE (AF) Bhuj
The firm must be registered with HQ CWE (AF) Bhuj as approved supplier to carry out general order supply and job work
1 document required · 1 mandatory
₹0
Exempted
25 Feb 2021
18 Nov 2019
28 Nov 2019
18 Nov 2019
27 Nov 2019
18 Nov 2019
Amount
M & L for carrying out the following scheduled preventive maintenance for EOT crane SM No 341/7003-CN/10:- (a) Inspect for wear of bridge and trolley wheel, flat sports and check in flange. Ensure drive wheels are of the same diameter. (b) Check for worm collector shoes, sag in main runway wiring, ensuring contact to be kept through the entire length runway. Check alignment and relocation. (c) Servicing, cleaning and maintenance of gear box assy and repair of main gear box with spares such as seal for gear box & replacement of fresh gear oil (24 ltrs). (d) Checking, cleaning the contacts of the contractors incl replacement of contactors (Each – 04). (e) Checking the pin and bushes for wear of flexible coupling and proper adjusting. (f) Lubrication of all moving parts and applies fresh grease. (g) Cleaning the plumber blocks and applying fresh grease for lubrication. (h) Cleaning and greasing the winch assy including maintenance of rope wire complete. (j) Servicing, aligning,adjusting and replacement of the limit switches (Each set 06). (k) Replacement fo cable guide with rollers. (30 Each). (l) Servicing, cleaning and replacement fo speed control unit with minor components.
(m) Checking the brake system and repair of break liner uulley & replacement of the wear out break liners and aligning complete (03 Sets). (n) Painting of complete EOT crane with synthetic enamel paint by spray gun including scrapping of old paint & rust with wire brush and applying redoxide. (o) Checking for proper functioning of the crane and carrying out alignment, if required. (p) Load testing of crane after completion of complete maint work.. Note:- (a) All material, labor and T & P required for complete the job is responsibility of the firm. (b) Old retrieved materials shall be the property of firm.
Hi-Tech Systems
M/s Samarpan Enterprise
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_335027.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .