Loading…
Loading…
Tender Value
₹263.1 Cr
EMD Value
₹5.3 L
Closing Date
20 Feb 2024, 4:00 pmClosed
SUPERINTENDING ENGINEER PR CIRCLE VISAKHAPATNAM
Office of the SE PR Circle ZPCompound Visakhapatnam
Package No.AP19P111 17 Road from T03 ZP Road 14 by 2 Baski via Pakanaguda in Araku valley (M) of Viskhapatnam Dt.
2024_ENCPR_132037_1
NIT. No. 63/ PMGSY III 2023-24 Batch I /SEPRVSP/2023-24, Dt.06.02.2024, SE, PR, Visakhapatnam
Open Tender
Civil - Roads and Bridges
Tender cum Auction
365 days
Arakuvally Mandal, Alluri Seetharamaraju District.
As per SBD Document
3 documents required · 3 mandatory
₹0
₹5.3 L
Office of the SE PR Circle ZPCompound Visakhapatna
4 Mar 2024
13 Feb 2024
23 Feb 2024
13 Feb 2024
20 Feb 2024
13 Feb 2024
13 Feb 2024 - 20 Feb 2024
16 Feb 2024
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Package No.AP19PIII-17-T03 Road from ZP Road (@ 14/2 km) to Baski via Pakanaguda of Arakuvalley (M) Visakhapatnam Dist | - | - | - | - |
| - | Road Part | - | - | - | - |
| - | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201 MORD . including contractors profit & Over head charges, but excluding GST and Seigniorage charges etc., complete. | 23,520 | Sqm | 2.4 | ₹56,448 |
| - | Scarifying existing granular surface to a depth of 50 mm and spreading scarified material in uniform layers with Tractor grader and compacting with Vibratory Roller to achieve the desired density as per Technical Specification Clause 301.4. MORD ,including contractors profit & Over head charges, but excluding GST etc., complete. | 21,187.5 | Sqm | 30.2 | ₹6,39,862.5 |
| - | Construction of granular sub-base by providing well graded material(Table 400.1) with Grading III Material(HBG M/C +Stone dust) CBR Value not less than 20 and PI Value less than 6 spreading in uniform layers with Tractor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with Vibratory Roller to achieve the desired density, complete as per Technical Specification Clause 401 MORD including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete. | 149.09 | Cum | 2,499.3 | ₹3,72,620.64 |
| - | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain (not exceeding 0.6 m depth) and foundation of other structures including breaking clods, ramming, spreading, sectioning, grading compacting with vibratory roller 80-100KN to OMC compaction including to a top width of 7.5m and raising to required height complete etc.as per requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 MORD including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete. | 20,000 | Cum | 95 | ₹19,00,000 |
| - | Construction of Shoulders by providing selected earth having minimum CBR of 10%, MDD not less than 1.85 g/cc with LL & PI not more than 40% and 20 respectively and spreading in uniform layers with tractor grader on prepared surface, and compacted at OMC with vibratory roller 80-100 kN to meet requirement of Table 300.2 with as per Technical Specification Clause 303 & 407 MORD, by using machinery including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete. | 3,360 | Cum | 443.2 | ₹14,89,152 |
| - | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete | 2,338.07 | Cum | 3,537.6 | ₹82,71,156.43 |
| - | Providing and applying primer coat with bitumen emulsion (CSS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 MORD (for use on Wet mix macadam & WBM) ,including contractors profit & Over head charges, but excluding GST etc., complete for Prime Coat | 41,756.6 | Sqm | 45.4 | ₹18,95,749.64 |
| - | Providing and laying surface dressing , for 1st coat using 13.2 mm nominal size IRC HBG machine crushed stone aggregates @ 0.010 cum / sqm on a layer of bitumen binder of 60/70 grade @ 1.00 kg / sqm laid on prepared surface and rolling with 8-10 T Power Road Roller etc., complete for finished item of work as per MoRDSpecification 5.6/507 and as directed by the Engineer-in-charge. including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete | 41,756.6 | Sqm | 96 | ₹40,08,633.6 |
stage.html
html • 0.02 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_207539.xls
BOQ • 0.32 MB
139422201.pdf
Tender Documents • 1.30 MB
139422203.html
Tender Documents • 0.03 MB
SBD.pdf
Tender Documents • 1.68 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .