Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance SECTOR 40 10TH FLOOR L T SEAWOODS TOWER 1 B WING 46 KONKAN RAIL VIHAR ROAD SEAWOODS THANE MAHARASHTRA 400706 | THANE | MAHARASHTRA | 400706 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
Closing Date
23 Sept 2021, 10:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
ASD
NAVAL DOCKYARD VISAKHAPATNAM
RETRO FITMENT OF EXISTING STERN GLAND WITH DEEP SEA SEAL ONBOARD IN SHIP
2021_NAVY_475151_1
COM/OFF/MGS/21-22/120
Single
Marine Services
Turn-key
600 days
NAVAL DOCKYARD VISAKHAPATNAM
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
Exempted
24 Sept 2021
14 Sept 2021
24 Sept 2021
14 Sept 2021
23 Sept 2021
14 Sept 2021
14 Sept 2021 - 23 Sept 2021
180 days
Material.Supply of Adapter Plate, Flow Meter & Globe Valves.As per OEM/ Ship builder technical manual/ drawing
Services for (a) Retrofit Proposal Designing (b) Degutting of old seal Preparation of Seal Mounting surface..Complete dismantling and Removal of gland packing Removal of glands and system pipe lines Removal of gland unit Removal of old studs and Fwd. stern tube bearings Shifting of all above parts out of vessel.As per OEM/ Ship builder technical manual/ drawing
Services for preparation and Machining of Shaft Liner and Preparation for fitment of New Face Seal..(a) Surface check and primary inspection in present condition, like shaft line, initial gauging of liner OD, shaft OD, depth of grooves on the liner, shaft angle etc by engineers from Wartsila UK (b) Inspection of shaft line & gauging of sleeve and stern tube face has to carried out for mounting of seal and DCR (c) Working on the Designing of the insitu machine at Wartsila Denmark, importing of insitu machine to Visakhapatnam, Dismantling and shifting of insitu machining tool inside the Ship compartment (d) Preparation & fabrication of (safety aspects as per Wartsila General T&C guidelines) standing platform underneath of shaft area. Preparation arranging ventilation, Light and fan (e) Preparation and installation of the insitu- machining tool in compartment by M/s wartsila Denmark specialists. (f) Precession Machining of liner surface in-situ, till removal of all groves in surface by M/s wartsila Denmark specialists.in coordination with wartsila UK experts (g) Insitu- machining of stern tube flanges surface for fitment of Seal mounting ring by M/s wartsila Denmark specialists.in coordination with wartsila UK experts (h) Checking/Inspection of Surface and angle for Installation of the Mounting ring.As per OEM/ Ship builder technical manual/ drawing
Services Transport Seal Installation, Fitment, final Inspection.Dismantling of New Deep Sea Seal assembly and shifting inside the compartment. Adaptor plate reaming/machining of new PCD based on the Stern-tube flange surface and requirements Mounting / assembly of Adopter plate on stern tube flange and inspection Hot Bonding of Inflatable seal and mounting in mounting plate assembly, fitting of mounting plate in stern tube Testing of inflatable seal in position Assembly of bellow assembly in position Fitment of seat assembly, compression of bellow assembly and pre alignment of seal assembly in place. Compression of seat assembly and alignment of seat. Connecting of new pipe lines with accessories for Seal assembly flushing and inflatable seal system Static and hydro test of the seal.As per OEM/ Ship builder technical manual/ drawing
Services Testing of Deep Sea Seals Final/Sea Trial.Setting to work and Sea Trials to prove the systems Testing of inflatable seal in position Assembly of bellow assembly in position Fitment of seat assembly, compression of bellow assembly and pre alignment of seal assembly in place. compression of seat assembly and alignment of seat. connecting of new pipe lines with accessories for Seal assembly flushing and inflatable seal system. Static and hydro test of the seal.As per OEM/ Ship builder technical manual/ drawing
Material Supply (Anticipatory Material Supply).Split Liner (This is Anticipatory in Case shaft is not withdrawn.As per OEM/ Ship builder technical manual/ drawing
stage.html
html • 0.01 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .