Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹119.3 CrAccepted-Finance | ₹119.3 Cr | 1 | Accepted-Finance Financial proposal found in order |
| 2 | 2₹120.7 CrAccepted-Finance | ₹120.7 Cr | 2 | Accepted-Finance Financial proposal found in order |
| 3 | 3₹127.2 CrAccepted-Finance C 21 SUSHANT LOK III SECTOR 57 GURUGRAM | GURUGRAM | HARYANA | 122001 | ₹127.2 Cr | 3 | Accepted-Finance Financial proposal found in order |
| 4 | 4₹136.7 CrAccepted-Finance DOOR NO 2 9 AN TOWERS DR SATHYAMOORTHY HOSPITAL OPP ROAD 2 5 PERUNDURAI ROAD ERODE TAMILNADU 638011 | ERODE | ERODE | TAMILNADU | 638011 | ₹136.7 Cr | 4 | Accepted-Finance Financial proposal found in order |
| 5 | 5₹139.7 CrAccepted-Finance | ₹139.7 Cr | 5 | Accepted-Finance Financial proposal found in order |
| Sl No | Description | Qty | Unit | R K JAIN INFRA PROJECTS PVT. LTD. L3 | ANNAI INFRA DEVELOPERS LIMITED L4 | BROADWAY LINKS PRIVATE LIMITED L2 | VISHWA SAMUDRA ENGINEERING PRIVATE LIMITED L5 | SHIVALAYA CONSTRUCTION LIMITED L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Preparation of seat of embankment or canals by 150mm ploughing and removing the grass roots etc. and as per specifications and directions of Engineer-In-Charge. | 3,40,006.7 | M2 | 15 ₹51.0 L | 15 ₹51.0 L | 4.77 ₹16.2 L | 16 ₹54.4 L | 32 ₹1.1 Cr |
| 2.00 | Earthwork by tractor with bucket with spreader (Tractor leveler or Tractor Dozer) in canal all types of work like filling and making of canal banks or embankment of earth free from logs, roots or any other gradients, desilting of canal bed in proper profile with dressing and finishing including new construction, repair or restoration in ordinary soil, marshy soil including cutting, loading, carriage from pit to banks or embankments, unloading, spreading, clod-breaking and laying in layers and construction & removal of dhalas properly with all leads and lifts or as direction given at site in order to disposal of earth at specified place and with all leads and lifts, all complete as per specifications and directions of Engineer-In-Charge. | 1,89,790.79 | M3 | 220 ₹4.2 Cr | 210 ₹4.0 Cr | 265.55 ₹5.0 Cr | 400 ₹7.6 Cr | 155 ₹2.9 Cr |
| 3.00 | Earthwork in lip cutting in side slopes and bed of canal in ordinary soil, marshy soil with all leads and lifts including the cost of formation of sub-grade of canal lining profiling, leveling, controlling of slopes and fine dressing, disposal of excavated earth and nominal dewatering; if any, all complete and as per approved design, IS 3873 : 1993 specification and directions of Engineer -In-Charge | 1,07,877.22 | M3 | 320 ₹3.5 Cr | 250 ₹2.7 Cr | 207.75 ₹2.2 Cr | 428 ₹4.6 Cr | 95 ₹1.0 Cr |
| 4.00 | Earthwork by Mechanical means with help of Excavator, Tipper and Spreader in canal all types of work like filling and making of canal banks or embankment of earth, free from logs, roots or any other gradients, desilting of canal bed and dhar in proper profile with dressing and finishing including new construction, repair or restoration in ordinary soil, marshy soil including cutting, loading, carriage from pit to banks or embankments, unloading, spreading, clod-breaking and laying in layers properly within all leads and lifts, all complete job as per specifications and directions of Engineer-In-Charge | 2,73,368.6 | M3 | 490 ₹13.4 Cr | 510 ₹13.9 Cr | 289.56 ₹7.9 Cr | 543 ₹14.8 Cr | 155 ₹4.2 Cr |
| 5.00 | Labour for Rolling and compacting the earth in layers of 225mm thick at O.M.C. by sheep-foot roller driven by tractor, vibratory roller to achieve minimum 95% of dry density, including sprinkling the required quantity of water making arrangement for supply and carriage of water with all leads and lifts, finishing the surfaces as per plan and drawing including hire charge of compaction, machine and other tools and plants etc. for lined canal all complete as per technical specifications as laid down in IRC 36-2010 & IRC 97-2013 and directions of Engineer-In-Charge. | 4,09,995.22 | M3 | 155 ₹6.4 Cr | 90 ₹3.7 Cr | 33.37 ₹1.4 Cr | 79 ₹3.2 Cr | 73 ₹3.0 Cr |
| 6.00 | Labour for initial rolling and compacting the ground before forming the embankment with vibratory roller at O.M.C. to achieve minimum 95% of dry density including sprinkling the required quantity of water, making arrangement for supply and carriage of water with all leads and lifts, finishing the surface with proper grade, camber or superelevation including hire charges of compaction machine and other tools and plants etc. all complete as per specifications and directions of Engineer-In-Charge. | 3,40,006.7 | M2 | 95 ₹3.2 Cr | 20 ₹68.0 L | 4.72 ₹16.0 L | 122 ₹4.1 Cr | 16 ₹54.4 L |
| 7.00 | Providing and laying P.C.C. M-15 with well-graded stone chips (20mm and down) and coarse sand of approved quality as per IS 383:1970 and requisite F.M 2.9 to 3.2 as per IS 383:1970 in lug slab, cross and longitudinal sleeper for lining canal including cost of materials, carriage at site, formwork and its removal after work, curing, royalty, bailing out of water by pumps or manual means, where necessary and applicable taxes etc,, all complete job as per IS 456:2000 (Reaffirmed 2021) specifications and directions of Engineer-In-Charge. | 7,919.06 | M3 | 14,000 ₹11.1 Cr | 13,250 ₹10.5 Cr | 13,210.13 ₹10.5 Cr | 10,721 ₹8.5 Cr | 12,296 ₹9.7 Cr |
| 8.00 | Providing 100/75mm thick P.C.C. lining in M-15 with well-graded stone chips (20mm & down) and coarse sand of approved quality and requirement 5m. in side and bottom common portion of the canal in panels with construction joints including cost of formwork, centering & shuttering and its removal after work, cost of material, carriage to site, curing, bailing out of water by pumps or manual means, where necessary and applicable taxes, all complete job as per IS 456:2000 & IS 3873 : 1993 specifications & directions of Engineer-In-Charge. | 35,469.17 | M3 | 14,000 ₹49.7 Cr | 13,725 ₹48.7 Cr | 13,088.85 ₹46.4 Cr | 12,162 ₹43.1 Cr | 12,296 ₹43.6 Cr |
| 9.00 | Dismantling of Pucca Brick or lime work including stacking serviceable materials in stacks within all leads and lifts and disposal of unserviceable materials with all leads and lifts. as per building specifications and directions of Engineer -In-Charge | 44,200.87 | M3 | 1,045 ₹4.6 Cr | 772 ₹3.4 Cr | 714.3 ₹3.2 Cr | 722 ₹3.2 Cr | 396 ₹1.8 Cr |
| 10.00 | Providing compacted 75 mm/150 mm thick sand filter of required F.M. 2.9 to 3.2 (Grading Zone-II as per IS 383:1970) as per design on slopes and in bed of canal with local sand including cost of materials, carriage to site, saturating with water, ramming, leveling and dressing etc. all complete as per IS 3873:1993 specification and directions of Engineer-In-Charge. | 2,53,360.66 | M2 | 280 ₹7.1 Cr | 882 ₹22.3 Cr | 547.29 ₹13.9 Cr | 693 ₹17.6 Cr | 818 ₹20.7 Cr |
Tender Value
Refer Docs
EMD Value
₹1.6 Cr
Closing Date
4 Sept 2025, 3:00 pmClosed
CE Irrigation Creation WRD Darbhanga
Office of Chief Engineer Irrigation Creation WRD Darbhanga Bihar
Rehabilitation and Modernization of Western Kosi Main Canal from KM 26.21 to KM 36.18 India Portion of Western Kosi Irrigation Scheme under Bihar Water Security and Irrigation Modernization Project BWSIMP
2025_WRD_868734_1
BWSIMP/WORKS/25-26/WKMC-1896
Open Tender
Civil Works
Rajnagar Madhubani
as per bid document
7 documents required · 7 mandatory
₹10,000
EE Western Kosi Canal Division Rajnagar
₹1.6 Cr
Office of CE Irrigation Creation WRD Darbhanga
16 Apr 2026
14 Jul 2025
4 Sept 2025
14 Jul 2025
4 Sept 2025
14 Jul 2025
14 Jul 2025 - 21 Jul 2025
21 Jul 2025
stage.html
html • 0.06 MB
technical_913223.pdf
techsummary_913223.pdf
finance_913223.pdf
BOQ Comparative Chart
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.98 MB
BOQ_913223.xls
BOQ • 0.30 MB
FRFBR.pdf
Tender Documents • 5.62 MB
Tenderdocument.pdf
Tender Documents • 5.62 MB
BOQ.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid