| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.9 CrAccepted-AOC 5TH FLOOR KAILASH BUILDING 26 K G MARG CANAUGHT PLACE CENTRAL DELHI DELHI 110001 | NEW DELHI | DELHI | 110001 | ₹8.9 Cr Quoted ₹8.90 | L1 | Accepted-AOC RANKED FIRST AND SELECTED AS THE SUCCESSFUL BIDDER AS PER THE SELECTION METHODOLOGY PRESCRIBED IN THE RFP DOCUMENT |
| 2 | L2₹9.44+₹0.54 (6.07%)Rejected-AOC PLOT NO 143 144 UDYOG VIHAR PHASE IV GURGAON HARYANA 122015 | GURUGRAM | HARYANA | 122015 | ₹9.44+₹0.54 (6.07%) | L2 | Rejected-AOC RANKED SECOND AS PER THE SELECTION METHODOLOGY PRESCRIBED IN THE RFP DOCUMENT |
| 3 | L3₹11.34+₹2.44 (27.4%)Rejected-AOC A 39 SECTOR 64 GAUTAM BUDH NAGAR DISTRICT NOIDA GAUTAM BUDDHA NAGAR UTTAR PRADESH 201301 | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201301 | ₹11.34+₹2.44 (27.4%) | L3 | Rejected-AOC RANKED THIRD AS PER THE SELECTION METHODOLOGY PRESCRIBED IN THE RFP DOCUMENT |
| 4 | L4₹16.90+₹8 (89.9%)Rejected-AOC | ₹16.90+₹8 (89.9%) | L4 | Rejected-AOC RANKED FOURTH AS PER THE SELECTION METHODOLOGY PRESCRIBED IN THE RFP DOCUMENT |
Tender Value
₹15 Cr
EMD Value
₹5 L
Closing Date
7 Feb 2020, 3:00 pmClosed
CHIEF ENGINEER CIVIL INVESTIGATION AND CON CENTRAL
CHIEF ENGINEER CIVIL INVESTIGATION AND CONSTRUCTION CENTRAL CABIN NO 241 2ND FLOOR KSEBL VYDHUTHI BHAVANAM PATTOM P O THIRUVANANTHAPURAM 695 004
RFP FOR THE SELECTION OF SUITABLE CONSULTANT THROUGH E- PROCUREMENT INTERNATIONAL COMPETITIVE BIDDING FOR THE PREPARATION OF FEASIBILITY STUDY REPORT AND DETAILED PROJECT REPORT FOR THE PROPOSED IDUKKI EXTENSION SCHEME IN IDUKKI DISTRICT OF KERALA
2019_KSEB_331993_2
CE(C I CC)/IDUKKI EXT/RFP/2019
Global Tenders
Consultancy
Lump-sum
660 days
IDUKKI KERALA
QUALITY COST BASED SYSTEM FOR PQ TECHNICAL SCORE ABOVE 70 WILL BE QUALIFIED FOR FINANCIAL EVALUATION QCBS SCORE RATIO 70 FOR TECH AND 30 FOR FIN
2 documents required · 2 mandatory
₹20,000
Yes
online
₹5 L
Yes
9TH FLOOR CONFERENCE HALL VYDHUTHI BHAVANAM PATTOM
25 Jul 2020
24 Dec 2019
12 Feb 2020
24 Dec 2019
7 Feb 2020
24 Dec 2019
24 Dec 2019 - 16 Jan 2020
18 Jan 2020
LUMP SUM COST FOR THE PROPOSED WORK IN INR INCLUDING ALL TAXES & DUTIES EXCEPT GST
LUMP SUM COST FOR THE PROPOSED WORK /PORTION OF TOTAL LUMP COST IN FOREIGN CURRENCY
LUMP SUM COST FOR THE PROPOSED WORK /PORTION OF TOTAL LUMP COST IN FOREIGN CURRENCY
LUMP SUM COST FOR THE PROPOSED WORK /PORTION OF TOTAL LUMP COST IN FOREIGN CURRENCY
Aquagreen Engineering Management Private Limited
Energy Infratech Private Limited
AF Consult
US Dollar
European Euro
Japanese Yen
Portion of Quoted Rate in Currency
European Euro
US Dollar
European Euro
Japanese Yen
Portion of Quoted Rate in Currency
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .