Loading…
Loading…
Tender Value
₹30.8 L
EMD Value
₹61,600
Closing Date
30 Jul 2026, 4:00 pm4d left
EEMGCCD4 AMROHA
EEMGCCD4 AMROHA
Construction Of Fall At Km. 4.100 Of Kundarki Dy. under Project M.G.C. Stage-II
2026_UPIDC_1169316_10
04/EE/2026-27
Open Tender
Civil Works - Canal
Item Rate
AMROHA
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹61,600
24 Jul 2026
24 Jul 2026
30 Jul 2026
24 Jul 2026
30 Jul 2026
24 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work of foundation in all type of soil with all lead & lift, compaction dressing including all cost of labour, material and T&P etc. requried for proper completion of the work as directed by Engineer-in-charge. | 120.66 | Cum | - | - |
| 2 | Providing & Laying of C.C M-10 (1:3:6) with A-40 Nominal Mix including all cost of material, labour and T&P etc. required for proper complition of work.as directed by Engineer-in-charge. | 38.86 | Cum | - | - |
| 3 | Providing & Laying of C.C M-15 (1:2:4) with A-20 including all cost of material, labour and T&P etc. required for proper complition of work.as directed by Engineer-in-charge. | 273.52 | Cum | - | - |
| 4 | Providing & Laying of C.C M-25 Design mix or (1:1:2) with A-20 and coarse sand including all cost of labour, material, and T&P etc. required for proper complition of work.as directed by Engineer-in-charge. | 0.83 | Cum | - | - |
| 5 | Steel reinforcement work in RCC including cutting Bending binding & placing in position as required including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge. | 12.26 | MT | - | - |
| 6 | Centering & Shuttering for ordinary C.C work as required including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge. | 208.97 | SQM | - | - |
| 7 | P / laying of coarse sand in graded filter including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge. | 12.2 | Cum | - | - |
| 8 | P / laying of Boulder 20 to 40 kg in bed, launching appran including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge. | 35.7 | Cum | - | - |
| 9 | Painting and finishing with water proof approved paint on all exposed surface including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge. | 50.7 | SQM | - | - |
| 10 | P / Fixing 75mm dia PVC drain pipe including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge. | 5 | Rm | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 9.65 MB
td.pdf
Tender Documents • 2.70 MB
BOQ_2200887.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].