| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹71.5 LAccepted-AOC | L1 | Accepted-AOC Qualified | |
| 2 | L2₹73.0 L+₹1.5 L (2.10%)Rejected-Finance 916 9 AWAS VIKAS COLONY RISHIKESH | DEHRADUN | UTTARAKHAND | 248001 | L2 | Rejected-Finance Not Qualified | |
| 3 | L3₹73.6 L+₹2.1 L (2.88%)Rejected-Finance | L3 | Rejected-Finance Not Qualified |
Tender Value
Refer Docs
EMD Value
₹1.4 L
Closing Date
22 May 2023, 2:00 pmClosed
SE
EDC Tehri
Increasing capacity of 16 KVA to 25 KVA T/fs at different vill of 11 KV Ghuttu Feeder and construction of 11 KV line at Bhilangana Block under EDSD Ghansali
2023_UPCL4_58418_2
70/EDCT/2022-23
Open Tender
Miscellaneous Services
Item Wise
90 days
Ghansali
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,900
Yes
EE ETD
₹1.4 L
Yes
25 Sept 2023
15 May 2023
23 May 2023
15 May 2023
22 May 2023
15 May 2023
De-centralized Material
PP Clamp, SP-23 with N&B
F Clamp, SP-23 with N&B
Stay Clamp, SP-23 with N&B
Stay Insulator
Earth Wire Clamp, SP-23 with N&B
Labour Charges
Safe cartage of following material from ESSC, New Tehri to roadside of work with loading & unloading at both ends dest. 174 Km.
(i) ST Pole, SP -23
(ii) 25 KVA T/F
(iii) Small line material (Per Qtl. per km. @ 05.00)
Head Load Cartage of following material from roadside to different worksites distance up to 0 to 01Km
(i) ST Pole, SP -23
(ii) 25 KVA T/F
(iii) Small line material (Per Qtl. per km. @ 05.00)
Head Load Cartage of following material from roadside to different worksites distance up to 1 to 03 Km
(i) ST Pole, SP -23
(ii) 25 KVA T/F
(iii) Small line material (Per Qtl. per km. @ 05.00)
Dismantling of Existed Channel from existed D/P for required fabrication
Febrication of MS Channal/Angle after cutting in required sige with drealing of holles.
Dismantling of existed single phase 11KV line with ACSR weasel Conductor without Earth Wire.
Dismantling of tilted ST Pole SP-23 with all accessories complete.
ST S/P, SP- 23
ST D/P, SP-23
Excavation, Digging & Errection of pit for size 0.9*0.9*1/6 Mtr. following Pole in boulder mixed soil, grouting in 1:4:8 cc in size 0.45*0.45*1/9 Mtr. Including fitting and Errection of all accosseries on pole.
(i) ST S/P, SP- 23
(ii) ST D/P, SP-23
Fixing of Channel after fabrication on existed D/P
Muffing of Poles with cc 1:3:6 block & 45cm hight from groung level including cost of ballast cement and sands etc.
Digging of pit for New& pulled out stay & erection with grouting 1:4:8 cement & concrete inculiding nozzling and binding complete.
Route clearance by cutting of tree/branches coming in the way of line complete. (Per Tree (LS)).
Errection and digging of Earth Rod 20x2500 mm & GI Wire 5 mm 6SWG of pole & substation body
Laying, stringing & resagging of 3P4W, 11KV line ACSR Rabbit Conductor inculiding Rejumpring and rebinding complete.
Providing Delta Earthing of T/f Neutral Point, Body & L.A. with 5 Nos. Earth Electrods 20x2500 mm & G.I. Strips of 25x3 Sq.mm Complete.
Dismantling of 16 KVA old & used T/F from Double Pole including opening in all connection
Mounting of 25 KVA T/f on D/P Structure with making HT/LT Connection complete.
Mounting & fixing of 11 KV Fuse set & 11 KV G/O switch complete.
Mounting & fixing of L.A. on Double Pole structure including making all conection by G.I. strip size 35x6 mm to eatrh point Complete work(Incuding cost of G.I.Strip)
Back Head Load cartage of old & used 16 KVA T/F from Sub-station site to road side
Safe back cartage of old & used 16 KVA T/F from nearest road side to storeRishikesh by pvt truck with loading & unloading both ends. Avg. dist. 150 km.
De-centralized Material
LT XLPE Cable 3C*35+25Sqmm
Connecting Cable AB 1*25 Sqmm
Suspension Clamp with I Hook (insulated) with nut bolt
Dead Clamp with I Hook (insulated) with nut bolt
LT inslation Piercing Connector for LT Section Pole
Connector AB Cable 35Sqmm to 35Sqmm
Line to line jumpring connector for mid span
Alu to Alu. Connector AB Cable 35 Sqmm to 35Sqmm
Alu to Alu. Connector AB Cable to LT Service Cable
Mid Span cable jointing sleve
Supply of heat sink end cap
Stay clamp, SP-10 with N&B
Stay clamp, SP-21 with N&B
Holding clamp for suspension and dead end clamp
Stay insulator
Distribution Box LT 3Ph with clamp
Distribution Box LT 1Ph with clamp
Al crimping lug 25sqmm
Labour Charges
Safe Cartage of following material from ESSC, New Tehri to roadside of different sites with loading, unloading & stacking at both ends distance upto 160 Km.
ST Pole SP-21
ST Pole SP-10
Small Line Material
Head Load Cartage of following material from roadside to different worksites distance up to 0 to 1.0 Km
ST Pole SP-21
ST Pole SP-10
Small Line Material
Head Load Cartage of following material from roadside to different worksites distance up to 0 to 3.0 Km
ST Pole SP-21
ST Pole SP-10
Small Line Material
Opening (Disconnection) & Reconnection of existing S/C by loop jumpring of main distribution line.
Dismantling of LT Line Span. for AB Cable
LT XLPE Cable 1Cx16+25 mm2
Dismantling of LT Rusted / Tillted Pole SP-10
Excavation, Digging of pit for size 0.9x0.9x1.5 Mtr. Following Poles in boulder mixed soil, grouting in 1:4:8 cc in size 0.45x0.45x1.5 Mtr. Including fitting and Errection of all accosseries on pole.
ST Pole, SP-10
ST Pole, SP-21
Excavation, Digging of pit for New stay 0.6*0.6*1.5 mtr. with grouting of all work Cement concreet in sige 0.6*0.6*0.3 mtr. Ratio 1:4:8 block with fixing, nozzling & binding complete.
Excavation, Digging of pit for Pulled out stay 0.6*0.6*1.5 mtr. with grouting of all work Cement concreet in sige 0.6*0.6*0.3 mtr. Ratio 1:4:8 block with fixing, nozzling & binding complete.
Errection, Resagging & commissioning of following size of insulated Arial Bunched Cable. --
LT XLPE Cable 3Cx35+25 mm2
Fixing of distribution box including making of all connection complete work
Erection of Mid Span cable Jointing sleve
Erection of Heat Sink End Cap
Back head load cartaze of received materil against following detail.
AB Cable Scrap, work side to Road Side (up to 01 Km.)
Back head load cartaze of received materil against following detail.
AB Cable Scrap, work side to Road Side (01 to 03 Km.)
Back cartage to store
AB Cable Scrap, work side to Road Side (up to 220 Km.)
M/S R. B. ELECTRICALS
Semwal Electrical Engineering Company
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .