Loading…
New: tenders and results on WhatsApp
New: Find tenders, results and companies on WhatsApp, by text or voice note
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance NEAR GURU NANAK I C RAJGARH PUNJABY COLONY GATE KHERI UTTAR PRADESH 262701 | KHERI | UTTAR PRADESH | 262701 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹17.1 L
EMD Value
₹17,060
Closing Date
8 Nov 2024, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE EDC GOLA
EDC GOLA
98/EDCG/2024-25
2024_MVVNL_970517_1
98/EDCG/2024-25
Open Tender
Miscellaneous Works
Item Rate
90 days
EDC GOLA
Please refer Tender documents.
2 documents required · 2 mandatory
₹17,060
SE EDC GOLA KHERI
₹17,060
8 Nov 2024
2 Nov 2024
8 Nov 2024
2 Nov 2024
8 Nov 2024
2 Nov 2024
Amount
10 KVA TO 25 KVA TF CAPACITY INCREASING AT VILL- NIPANIYA1, FEEDER- BALARPUR S/S BANKEYGANJ
SAFE CARRIGE OF PCC POLE 8.5 MTR LONG FORM STORE CENTER TO WORK SITE INCLUDING LOADING AND UNLOADING BOTH SIDE.
SAFE CARRIGE OF 25 KVA TF FORM STORE CENTER TO WORK SITE INCLUDING LOADING AND UNLOADING BOTH SIDE.
SAFE CARRIGE OF OTHER LINE MATTRIAL FORM STORE CENTER TO WORK SITE INCLUDING LOADING AND UNLOADING BOTH SIDE.
ERECTION OF DOUBLE POLE 8.5 MTR LONG BY DIGGING OF PITS AND FIXING OF ALL REQUIRED ACCECCORIES.
JUMFERING AND NOZLING OF DOUBLE POLE HT SIDE.
GROUTING OF PCC POLE 8.5 MTR LONG INCLUDING PROVIDING ALL GROUTING MATERIAL CEMENT,BRICK,BALLAST AND RIVER SAND IN RATIO OF 1:4:8 COMPLETE IN ALL RESPECT AS PER RESSPO NORMS DECENTRALISED MATERIAL WILL BE PROVIDED BY CONTRACTOR.
GROUTING OF STAYS INCLUDING PROVIDING ALL GROUTING MATERIAL CEMENT,BRICK,BALLAST AND RIVER SAND IN RATIO OF 1:4:8 COMPLETE IN ALL RESPECT AS PER RESSPO NORMS DECENTRALISED MATERIAL WILL BE PROVIDED BY CONTRACTOR.
UNSTALATION OF OLD 10 KVA TF.
REMOVING OLD CONNECTION CABLE FORM OVER LOADED TF AND MAKING CONNECTIONS.
ERECTION AND MOUNTING OF NEW 25 KVA T/F (COMPLETED)
RECIVED BACK OF 16 KVA T/F TO STORE.
HOLDING CLAMP FOR PCC POLE PROVIDING AND FIXING BY THA CONTRACTOR..
STAY CLAMP PROVIDING AND FIX BY CONTRACTOR.
FABRICATION WORK
10 KVA TO 25 KVA TF CAPACITY INCREASING AT VILL- NIPANIYA-2, FEEDER- BALARPUR S/S BANKEYGANJ
SAFE CARRIGE OF PCC POLE 8.5 MTR LONG FORM STORE CENTER TO WORK SITE INCLUDING LOADING AND UNLOADING BOTH SIDE.
SAFE CARRIGE OF 25 KVA TF FORM STORE CENTER TO WORK SITE INCLUDING LOADING AND UNLOADING BOTH SIDE.
SAFE CARRIGE OF OTHER LINE MATTRIAL FORM STORE CENTER TO WORK SITE INCLUDING LOADING AND UNLOADING BOTH SIDE.
ERECTION OF DOUBLE POLE 8.5 MTR LONG BY DIGGING OF PITS AND FIXING OF ALL REQUIRED ACCECCORIES.
JUMFERING AND NOZLING OF DOUBLE POLE HT SIDE.
GROUTING OF PCC POLE 8.5 MTR LONG INCLUDING PROVIDING ALL GROUTING MATERIAL CEMENT,BRICK,BALLAST AND RIVER SAND IN RATIO OF 1:4:8 COMPLETE IN ALL RESPECT AS PER RESSPO NORMS DECENTRALISED MATERIAL WILL BE PROVIDED BY CONTRACTOR.
GROUTING OF STAYS INCLUDING PROVIDING ALL GROUTING MATERIAL CEMENT,BRICK,BALLAST AND RIVER SAND IN RATIO OF 1:4:8 COMPLETE IN ALL RESPECT AS PER RESSPO NORMS DECENTRALISED MATERIAL WILL BE PROVIDED BY CONTRACTOR.
UNSTALATION OF OLD 10 KVA TF.
REMOVING OLD CONNECTION CABLE FORM OVER LOADED TF AND MAKING CONNECTIONS.
ERECTION AND MOUNTING OF NEW 25 KVA T/F (COMPLETED)
RECIVED BACK OF 16 KVA T/F TO STORE.
HOLDING CLAMP FOR PCC POLE PROVIDING AND FIXING BY THA CONTRACTOR..
STAY CLAMP PROVIDING AND FIX BY CONTRACTOR.
FABRICATION WORK
10 KVA TO 25 KVA TF CAPACITY INCREASING AT VILL- RAMTAIYA, FEEDER- BALARPUR S/S BANKEYGANJ
SAFE CARRIGE OF PCC POLE 8.5 MTR LONG FORM STORE CENTER TO WORK SITE INCLUDING LOADING AND UNLOADING BOTH SIDE.
SAFE CARRIGE OF 25 KVA TF FORM STORE CENTER TO WORK SITE INCLUDING LOADING AND UNLOADING BOTH SIDE.
SAFE CARRIGE OF OTHER LINE MATTRIAL FORM STORE CENTER TO WORK SITE INCLUDING LOADING AND UNLOADING BOTH SIDE.
ERECTION OF DOUBLE POLE 8.5 MTR LONG BY DIGGING OF PITS AND FIXING OF ALL REQUIRED ACCECCORIES.
JUMFERING AND NOZLING OF DOUBLE POLE HT SIDE.
GROUTING OF PCC POLE 8.5 MTR LONG INCLUDING PROVIDING ALL GROUTING MATERIAL CEMENT,BRICK,BALLAST AND RIVER SAND IN RATIO OF 1:4:8 COMPLETE IN ALL RESPECT AS PER RESSPO NORMS DECENTRALISED MATERIAL WILL BE PROVIDED BY CONTRACTOR.
GROUTING OF STAYS INCLUDING PROVIDING ALL GROUTING MATERIAL CEMENT,BRICK,BALLAST AND RIVER SAND IN RATIO OF 1:4:8 COMPLETE IN ALL RESPECT AS PER RESSPO NORMS DECENTRALISED MATERIAL WILL BE PROVIDED BY CONTRACTOR.
UNSTALATION OF OLD 10 KVA TF.
REMOVING OLD CONNECTION CABLE FORM OVER LOADED TF AND MAKING CONNECTIONS.
ERECTION AND MOUNTING OF NEW 25 KVA T/F (COMPLETED)
RECIVED BACK OF 16 KVA T/F TO STORE.
HOLDING CLAMP FOR PCC POLE PROVIDING AND FIXING BY THA CONTRACTOR..
STAY CLAMP PROVIDING AND FIX BY CONTRACTOR.
FABRICATION WORK
GAURDING OF 11 KV FEEDER KHANJANPUR WITH EARTHING 1 KM
GAURDING OF 11 KV FEEDER KHANJANPUR WITH EARTHING 1 KM
REPLACEMENT OF 1 I/C AND 3 O/G VCB PANEL IN JB GANJ
SAFE CARRIGE OF 11 KV VCB INCOMING FROM STORE CENTER TO WORK SITE (0 TO 80 KM )
SAFE CARRIGE OF 11 KV VCB OUTGOING FROM STORE CENTER TO WORK SITE (0 TO 80 KM )
INSTALATION OF NEW VCB WITH ALL THA CONNECTION AND ACCESSORIES WORK.
DISMENTLING OF OLD VCB WITH OPENING ALL CONNECTIONS.
RECIVED BACK AND CARRIGING OF OLD VCB FROM WORK SITE TO ESC LAKHIMPUR.
ERATHING OF VCB PANELS
AKBARABAD ABC CABLE FULL VILLAGE 800 M
SAFE CARRIGE OF A.B.CABLE FROM STORE CENTER TO WORK SITE INCLUDING LOADING AND UNLOADING BOTH SIDE.
STRINGING AND SAGGING OF A.B CABLE INCLUDING WINDING JUMPRING AND NOZLING ETC.(COMPELTE AS PER RESSPO NORMS.(ALL DECENTRLIZED MATERRIAL PROVIDED BY CONTRACTOR.
REPLACEMENT OF 01 I/C AND 03 O/G VCB PANEL IN J.B. GANJ MOHAMMDI
SAFE CARRIGE OF 11 KV VCB INCOMING FROM STORE CENTER TO WORK SITE (0 TO 80 KM )
SAFE CARRIGE OF 11 KV VCB OUTGOING FROM STORE CENTER TO WORK SITE (0 TO 80 KM )
INSTALATION OF NEW VCB WITH ALL THA CONNECTION AND ACCESSORIES WORK.
DISMENTLING OF OLD VCB WITH OPENING ALL CONNECTIONS.
RECIVED BACK AND CARRIGING OF OLD VCB FROM WORK SITE TO ESC LAKHIMPUR.
ERATHING OF VCB PANELS
63 KVA TO 100 KVA INCREASING CAPACITY MAHMADPUR KALA
SAFE CARRIGE OF PCC POLE 8.5 MTR LONG FORM STORE CENTER TO WORK SITE INCLUDING LOADING AND UNLOADING BOTH SIDE.
SAFE CARRIGE OF 100 KVA TF FORM STORE CENTER TO WORK SITE INCLUDING LOADING AND UNLOADING BOTH SIDE.
SAFE CARRIGE OF OTHER LINE MATTRIAL FORM STORE CENTER TO WORK SITE INCLUDING LOADING AND UNLOADING BOTH SIDE.
ERECTION OF DOUBLE POLE 8.5 MTR LONG BY DIGGING OF PITS AND FIXING OF ALL REQUIRED ACCECCORIES.
JUMFERING AND NOZLING OF DOUBLE POLE HT SIDE.
GROUTING OF PCC POLE 8.5 MTR LONG INCLUDING PROVIDING ALL GROUTING MATERIAL CEMENT,BRICK,BALLAST AND RIVER SAND IN RATIO OF 1:4:8 COMPLETE IN ALL RESPECT AS PER RESSPO NORMS DECENTRALISED MATERIAL WILL BE PROVIDED BY CONTRACTOR.
GROUTING OF STAYS INCLUDING PROVIDING ALL GROUTING MATERIAL CEMENT,BRICK,BALLAST AND RIVER SAND IN RATIO OF 1:4:8 COMPLETE IN ALL RESPECT AS PER RESSPO NORMS DECENTRALISED MATERIAL WILL BE PROVIDED BY CONTRACTOR.
UNSTALATION OF OLD 63 KVA TF.
REMOVING OLD CONNECTION CABLE FORM OVER LOADED TF AND MAKING CONNECTIONS.
ERECTION AND MOUNTING OF NEW 25 KVA T/F (COMPLETED)
RECIVED BACK OF 63 KVA T/F TO STORE.
HOLDING CLAMP FOR PCC POLE PROVIDING AND FIXING BY THA CONTRACTOR..
STAY CLAMP PROVIDING AND FIX BY CONTRACTOR.
FABRICATION WORK
REPLACEMENT OF BURNT AND DAMAGE 11 KV VCB AT 33/11 KV S/S MAMARKHAPUR UNDER JURIDITION OF EDSD MAIGALGANJ
SAFE CARRIGE OF 11 KV VCB INCOMING FROM STORE CENTER TO WORK SITE (0 TO 80 KM )
SAFE CARRIGE OF 11 KV VCB OUTGOING FROM STORE CENTER TO WORK SITE (0 TO 80 KM )
INSTALATION OF NEW VCB WITH ALL THA CONNECTION AND ACCESSORIES WORK.
DISMENTLING OF OLD VCB WITH OPENING ALL CONNECTIONS.
RECIVED BACK AND CARRIGING OF OLD VCB FROM WORK SITE TO ESC LAKHIMPUR.
ERATHING OF VCB PANELS
FEEDER BIFURCATION KAIMAHARA 8 KM
SAFE CARRIGE OF PCC 8.5 MTR LONG POLE FROM STORE CENTER TO WORK SITE INCLUDING LOADING AND UNLOADING BOTH SIDE. (APPROX 0 TO 80 KM)
CARRIGE OF OTHER LINE MATERAIL (HOLDING CALMP,V-CROSS ARMS PIN INSULATER, DISK INSULATOR, STAY SET, TOP CHANNEL, GI WIRE 8 SWG, ERATHING ROD, STAY CLAMP, DROPER CHANNEL,)
CARRIGE OF ACSER WESEL CONDUCTOR .
ERACTION OF PCC POLE 8.5 MTR LONG BY DIGGING PITS, FIXING ALL REQUIRED SINGLE POLE ACCESSORIES ,
GROUTING OF POLE
STRINGING AND SAING OF ACSR WESEL CONDUCTOR ON POLE INCLUDING WINDING JUMPRING AND NOZZLING COMPLETE AS PER RESSPO NORMS.
FIXING AND PROVIDING OF 11 KV F CLAMP
GROUTING OF STAY
REPLACEMENT OF 36 NO RUSTED POLES IN BARBAR TOWN
SAFE CARRIGE OF STP 11 MTR LONG POLE FROM STORE CENTER TO WORK SITE INCLUDING LOADING AND UNLOADING BOTH SIDE. (APPROX 0 TO 80 KM)
CARRIGE OF OTHER LINE MATERAIL (HOLDING CALMP,V-CROSS ARMS PIN INSULATER, DISK INSULATOR, LT DISTRIBUTION BOX,STAY SET)
ERACTION OF HTP POLE 11 MTR LONG WITH STONE PAD.
GROUTING OF POLE
PROVIDING AND PAINTING OF POLE WITH RED OXIDE PAINT.
DESMENTLING AND CARRIAGE BACK TO STORE OF RUSTED POLE.
GROUTING OF STAY
PASGAWAN FEEDER PER BARKHERIYA JAAT KE PASS 3X50 XLPE CABLE KHARAB HAI 260 MTR
SAFE CARRIGE OF 11 KV XLPE CABLE (3X185) FROM STORE CENTER TO WORK SITE (0 TO 80 KM )
SAFE CARRIGE OF OTHER LINE MATERIAL(CABLE BOX O/D)(3X185) FROM STORE CENTER TO WORK SITE (0 TO 80 KM )
LAYING OF CABLE BY DRIL SYSTEM WITH ALL ACCOCIATED WORK(MACHIN WILL BE PROVIDED BY CONTRACTOR)
JOINTING OF CABLE BOX O/D
GUARDING VILL AJBAPUR
SAFE CARRIGE OF LINE MATERIAL (MS ANGLE 65X65X6, GI WIRE,HOLDING CLAMP LOADING AND UNLOADING BOTH SIDE. (APPROX 0 TO 80 KM)
HOLDING CLAMP PROVIDED BY THE CONTRACTOR
GARDING OF LINE
PROVIDING AND FIXING NUT AND BOULT OF SIZE
FEBRICATION WORK ETC.
NEW 11 KV LINE CONSTRUCTION FOR LOAD BIFERCATION OF 11 KV LINK LINE FEEDER EMNATION FORM 33/11 KV S/S AUGRANGABAD
SAFE CARRIGE OF PCC 8.5 MTR LONG POLE FROM STORE CENTER TO WORK SITE INCLUDING LOADING AND UNLOADING BOTH SIDE. (APPROX 0 TO 80 KM)
CARRIGE OF OTHER LINE MATERAIL (HOLDING CALMP,V-CROSS ARMS PIN INSULATER, DISK INSULATOR, STAY SET, TOP CHANNEL, GI WIRE 8 SWG, ERATHING ROD, STAY CLAMP, DROPER CHANNEL,)
CARRIGE OF ACSER WESEL CONDUCTOR .
ERACTION OF PCC POLE 8.5 MTR LONG BY DIGGING PITS, FIXING ALL REQUIRED SINGLE POLE ACCESSORIES ,
GROUTING OF POLE
STRINGING AND SAING OF ACSR WESEL CONDUCTOR ON POLE INCLUDING WINDING JUMPRING AND NOZZLING COMPLETE AS PER RESSPO NORMS.
FIXING AND PROVIDING OF 11 KV F CLAMP
GROUTING OF STAY
REPLACEMENT OF LA IN VARIOUS SUBSTATIONS(AS PER LIST PROVIDED BY THE DIVISION)
KUTUBPUR NAHAR GAURDING AND STP REPLACEMENT
SAFE CARRIGE OF STP POLE 11 MTR LONG POLE FROM STORE CENTER TO WORK SITE INCLUDING LOADING AND UNLOADING BOTH SIDE. (APPROX 0 TO 80 KM)
CARRIGE OF OTHER LINE MATERAIL (HOLDING CALMP,V-CROSS ARMS PIN INSULATER, DISK INSULATOR, STAY SET, TOP CHANNEL, GI WIRE 8 SWG, ERATHING ROD, STAY CLAMP, DROPER CHANNEL,STAY INSULATER )
CARRIGE OF ACSR DOG CONDUCTOR .
DISMENTLING OF OLD SHABY AND RUSTED LINE FORM THA POLE
ERACTION OF STP POLE 11 MTR LONG BY DIGGING PITS, FIXING ALL REQUIRED SINGLE POLE ACCESSORIES ,
ERACTION OF DOUBLE POLE STRUCTURE ON STP POLE 11 MTR LONG BY DIGGING PITS, FIXING ALL REQUIRED SINGLE POLE ACCESSORIES ,
ERACTION OF TRIPLE POLE STRUCTURE ON STP POLE 11 MTR LONG BY DIGGING PITS, FIXING ALL REQUIRED SINGLE POLE ACCESSORIES ,
GROUTING OF POLE
STRINGING AND SAING OF ACSR DOG CONDUCTOR ON POLE INCLUDING WINDING JUMPRING AND NOZZLING COMPLETE AS PER RESSPO NORMS.
FIXING AND PROVIDING OF 11 KV F CLAMP
GROUTING OF STAY
GST EXTRA
M/s Kakul Traders
M/S JAISWAL INTERPRISES
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .