Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹23.2 LAdmitted-Finance | -22.65% | ₹23.2 L | L1 | Admitted-Finance |
| 2 | L2₹26.1 L+₹2.9 L (12.4%)Admitted-Finance | -13.02% | ₹26.1 L+₹2.9 L (12.4%) | L2 | Admitted-Finance |
| 3 | L3₹27.0 L+₹3.8 L (16.2%)Admitted-Finance | -10.09% | ₹27.0 L+₹3.8 L (16.2%) | L3 | Admitted-Finance |
Tender Value
₹30 L
EMD Value
₹60,000
Closing Date
25 Aug 2026, 12:00 pmClosed
XEN CMD SVP
Kangan
Repair/Reconstruction of damaged RCC panels at various spots of USHP-I Sumbal
2026_SPDC_318176_1
CMD SVP K 08 of 2026 27
Open Tender
Civil Works
Percentage
40 days
Sumbal
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,200
CPAO USHP
₹60,000
Divisional Office
31 Aug 2026
28 Jul 2026
27 Aug 2026
28 Jul 2026
25 Aug 2026
28 Jul 2026
4 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Demolishing R.C.C. work manually/by mechanical means including
stacking of steel bars and disposal of unserviceable material within 50
meters lead as per direction of Engineer-in-charge. | - | Cum | 1 | - |
| 2.01 | Provision for providing of labourers for removal of silt,debris,rocks etc from the bottom of the canal (to be paid as per actual) | - | No | - | - |
| 3.01 | Provision for dimantiling and reinstalling of Chain link fencing at spots for restoration of damaged RCC lining. | - | Job | - | - |
| 4.01 | Preparing and dressing side slopes of canals for lining.In soils admixed with upto 40% shingle / kankar / boulder | - | Sqm | - | - |
| 5.01 | Silt clearance from canals. Inclusive of initial lead and lift ( 50m & 1.5m
respectively ) | 1 | Cum | 1 | ₹1 |
| 6.01 | Extra for every additional lift of 1.5 m or part thereof in excavation/banking excavated or stacked material : (2 lifts)All kinds of soil: | 1 | Cum | - | - |
| 7.01 | Providing and laying stone boulder of size 50mm to 200mm incl all carraige and lift as per direction of Engineer In charge all complete | - | Cum | - | - |
| 8.01 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | - | Sqm | - | - |
| 9.01 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | - | Cum | 1 | - |
| 10.01 | CEMENT PLASTER (IN FINE SAND)
12mm Cement plaster of mix:1 : 4 ( 1 cement : 4 fine sand) | 1 | Sqm | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 7.04 MB
BOQ_1046719.xls
BOQ • 0.27 MB
cornit8.pdf
PDF • 0.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .