Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.2 LAdmitted-Finance | ₹18.2 L | L1 | Admitted-Finance |
| 2 | L2₹18.3 L+₹3,274 (0.18%)Admitted-Finance | ₹18.3 L+₹3,274 (0.18%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical Technically Not Suitable |
| 4 | Rejected-Technical | - | - | Rejected-Technical Technically Not Suitable |
| Sl No | Description | Qty | Unit | Fricons L2 | MAYURI ENGINEERING WORKS L1 |
|---|---|---|---|---|---|
| 1.00OVERHAULING OF AC PLANT , REF PLANT AND EVAPORATOR COILS ON TURNKEYBASIS. PROVISION REFRIGERATION PLANT; COMPANY: HiAIR KOREA CO LTDMODEL NO:REF A01 CONTROLLER.MOTOR :12.7KW,A=21.4,RPM=1745 NOTE: 1.VENDOR HAS TO MAKE OWN ARRANGEMENTS FOR CHEMICAL CLEANING.CHEMICAL CLEANING TUBS,WATER JET MACHINES.ARRANGEMENTS FOR AGITATION ETC ARE TO BE ARRANGED BY VENDOR. 2.ATMOST CARE TO BE TAKEN TO PREVENT WATER/ CHEMICAL SPILLAGE IN SHIP AND WORKSHOP VICINITY. 3.VENDORS WITH SIMILAR EXPERIENCE IN EXECUTION OF WORKS ON MARINE VESSELS AND EXPERIENCE TO BE SUBMITTED.THE WORKS MUST HAVE BEEN CARRIED OUT WITH IN THE LAST 7 YEARS ON SIMILAR MAKE OF COMPRESSORS ,FAILING TO PROVIDE THE BIDS WILL BE REJECTED SUMMARILY 4.TESTING ,COMMISSIONING TO BE PROVED BY VENDOR 5.VENDOR SHOULD STANDBY WITH THE TEAM DURING THE TRIALS OF AC SYSTEM. 6.TOOLS ,TACKLES,ETC TO BE ARRANGED BY VENDOR.WELDING/BRAZING WHEREVER REQUIRED TO BE ARRANGED BY VENDOR. 7.REMOVAL AND REFITMENT OF COIL UNITS FROM SHIP TO JETTY/VENDOR WORKSHOP IS UNDER VENDOR SCOPE. 8.FOR RENEWAL OF BLOWER FOUNDATION REQUIRED GI CHANNELS AND GI BOLTS ETC TO BE ARRANGED BY VENDOR. | |||||
| 1.10 | 2 NO. COMPRESSORS TO BE OVERHAULED .SATISFACTORY TRIALS TO BE SHOWN TO SHIP STAFF. SPARES SHIP SUPPLY. | 2 | NOS | 68,150 ₹1,36,300 Lowest | 2,79,459 ₹5,58,918 |
| 1.20 | PACKAGE AC AND AIR COIL UNIT SHOULD BE CHECKED AND SERVICED. MAKER :HI AIR KOREA MODEL-HIP-08WGE/HIP-20WG/HIP-20WME POWER SUPPLY 440V AC 60HZ CONTROL VOLTAGE-230V AC 60HZ. 7 NO`S PACKAGE AC & 9 NO`S FAN COIL UNIT | 16 | NOS | 63,656 ₹10,18,496 | 36,126 ₹5,78,016 Lowest |
| 1.30 | AIR HANDLING UNIT FOR BRIDGE & SCIENTIFIC LAB 11KW 22.2A 1775 RPM
TO BE SERVICED.TYPE-180L-4/6 440V 11KW
AIR HANDLING UNIT SCIENTIFIC LAB AND WHEEL HOUSE
HI AIR KOREA,TYPE : HKA - 06SN
I) EVAPORATOR COIL CHEMICAL CLEANING AND PRESSURE TESTING.
II) BLOWER TO OVERHAUL AND POLISHING OF BLADES.SPARES FOR
OVERHAULING TO BE ARRANGED BY VENDOR
III) DYNAMIC BALANCING OF BLOWER TO BE CARRIED OUT.REPORT TO BE SUBMITTED
IV) BEARING:1309EKTN9 - 04 NOS To supply as onboard spares. | 1 | LS | 2,99,040 ₹2,99,040 Lowest | 3,69,729 ₹3,69,729 |
| 1.40 | AIR HANDLING UNIT FOR ACCOMODATION MOTOR NEED SERVICING TYPE :- 37K 440V 225S-4/6
AIR HANDLING UNIT ACCOMODATION,HI AIR KOREA,TYPE : HKA - 08SC
I) EVAPORATOR COIL CHEMICAL CLEANING AND PRESSURE TESTING.
EVAPORATOR AND HEATER COILS TO BE TAKEN OUT AND CHEMICALLY
CLEANED. COILS TO BE FITTED BACK IN PLACE
II) PEDASTAL BEARING TO RENEW (BEARING - SHIP SUPPLY).
III) DAMAGED FOUNDATION PLATE TO FABRICATE AND RENEW.MAT : SS
IV) BLOWER TO OVERHAUL AND POLISHING OF BLADES.
V) DYNAMIC BALANCING OF BLOWER TO BE CARRIED OUT.REPORT TO BE SUBMITTED
VI) AIR QUANTITY TO BE CHECKED AND ADJUSTED IN ALL CABINS.
VII) BEARING: 1311EKTN9 - 02 NO. To supply as onboard spares. | 1 | LS | 3,71,740 ₹3,71,740 | 3,15,639 ₹3,15,639 Lowest |
Tender Value
Refer Docs
EMD Value
₹25,000
Closing Date
7 Sept 2026, 2:30 pmClosed
M (SRC-OS)
Ph.No. 9493792254
OVERHAULING OF AC PLANT, REF PLANT AND EVAPORATOR COILS ON TURNKEYBASIS ON ORV SAMUDRA RATNAKAR
2026_HSL_100053_1
SR COMPLEX/PRODUCTION/OUT SOURCE REQUISITION/2026/345
Open Tender
Miscellaneous Services
Service
30 days
HSL, VISAKHAPATNAM
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹25,000
Yes
19 Sept 2026
2 Sept 2026
7 Sept 2026
2 Sept 2026
7 Sept 2026
2 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1OVERHAULING OF AC PLANT , REF PLANT AND EVAPORATOR COILS ON TURNKEYBASIS. PROVISION REFRIGERATION PLANT; COMPANY: HiAIR KOREA CO LTDMODEL NO:REF A01 CONTROLLER.MOTOR :12.7KW,A=21.4,RPM=1745 NOTE: 1.VENDOR HAS TO MAKE OWN ARRANGEMENTS FOR CHEMICAL CLEANING.CHEMICAL CLEANING TUBS,WATER JET MACHINES.ARRANGEMENTS FOR AGITATION ETC ARE TO BE ARRANGED BY VENDOR. 2.ATMOST CARE TO BE TAKEN TO PREVENT WATER/ CHEMICAL SPILLAGE IN SHIP AND WORKSHOP VICINITY. 3.VENDORS WITH SIMILAR EXPERIENCE IN EXECUTION OF WORKS ON MARINE VESSELS AND EXPERIENCE TO BE SUBMITTED.THE WORKS MUST HAVE BEEN CARRIED OUT WITH IN THE LAST 7 YEARS ON SIMILAR MAKE OF COMPRESSORS ,FAILING TO PROVIDE THE BIDS WILL BE REJECTED SUMMARILY 4.TESTING ,COMMISSIONING TO BE PROVED BY VENDOR 5.VENDOR SHOULD STANDBY WITH THE TEAM DURING THE TRIALS OF AC SYSTEM. 6.TOOLS ,TACKLES,ETC TO BE ARRANGED BY VENDOR.WELDING/BRAZING WHEREVER REQUIRED TO BE ARRANGED BY VENDOR. 7.REMOVAL AND REFITMENT OF COIL UNITS FROM SHIP TO JETTY/VENDOR WORKSHOP IS UNDER VENDOR SCOPE. 8.FOR RENEWAL OF BLOWER FOUNDATION REQUIRED GI CHANNELS AND GI BOLTS ETC TO BE ARRANGED BY VENDOR. | |||||
| 0.0 | 2 NO. COMPRESSORS TO BE OVERHAULED .SATISFACTORY TRIALS TO BE SHOWN TO SHIP STAFF. SPARES SHIP SUPPLY. | 2 | NOS | - | - |
| 0.9 | PACKAGE AC AND AIR COIL UNIT SHOULD BE CHECKED AND SERVICED. MAKER :HI AIR KOREA MODEL-HIP-08WGE/HIP-20WG/HIP-20WME POWER SUPPLY 440V AC 60HZ CONTROL VOLTAGE-230V AC 60HZ. 7 NO`S PACKAGE AC & 9 NO`S FAN COIL UNIT | 16 | NOS | - | - |
| 0.0 | AIR HANDLING UNIT FOR BRIDGE & SCIENTIFIC LAB 11KW 22.2A 1775 RPM
TO BE SERVICED.TYPE-180L-4/6 440V 11KW
AIR HANDLING UNIT SCIENTIFIC LAB AND WHEEL HOUSE
HI AIR KOREA,TYPE : HKA - 06SN
I) EVAPORATOR COIL CHEMICAL CLEANING AND PRESSURE TESTING.
II) BLOWER TO OVERHAUL AND POLISHING OF BLADES.SPARES FOR
OVERHAULING TO BE ARRANGED BY VENDOR
III) DYNAMIC BALANCING OF BLOWER TO BE CARRIED OUT.REPORT TO BE SUBMITTED
IV) BEARING:1309EKTN9 - 04 NOS To supply as onboard spares. | 1 | LS | - | - |
| 0.9 | AIR HANDLING UNIT FOR ACCOMODATION MOTOR NEED SERVICING TYPE :- 37K 440V 225S-4/6
AIR HANDLING UNIT ACCOMODATION,HI AIR KOREA,TYPE : HKA - 08SC
I) EVAPORATOR COIL CHEMICAL CLEANING AND PRESSURE TESTING.
EVAPORATOR AND HEATER COILS TO BE TAKEN OUT AND CHEMICALLY
CLEANED. COILS TO BE FITTED BACK IN PLACE
II) PEDASTAL BEARING TO RENEW (BEARING - SHIP SUPPLY).
III) DAMAGED FOUNDATION PLATE TO FABRICATE AND RENEW.MAT : SS
IV) BLOWER TO OVERHAUL AND POLISHING OF BLADES.
V) DYNAMIC BALANCING OF BLOWER TO BE CARRIED OUT.REPORT TO BE SUBMITTED
VI) AIR QUANTITY TO BE CHECKED AND ADJUSTED IN ALL CABINS.
VII) BEARING: 1311EKTN9 - 02 NO. To supply as onboard spares. | 1 | LS | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.85 MB
TBID345.pdf
Tender Documents • 0.36 MB
CQ345.pdf
Tender Documents • 0.83 MB
BOQ_109618.xls
BOQ • 0.28 MB
DUE_DATE_EXTENSION.pdf
PDF • 0.17 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .