Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.8 LAccepted-Finance | L1 | Accepted-Finance OK | |
| 2 | L2₹22.8 L+₹1.1 L (4.83%)Accepted-Finance | L2 | Accepted-Finance OK | |
| 3 | Rejected-Technical 4264 GALI SHAHTARA AJMERI GATE DELHI DELHI 110006 | NORTH DELHI | DELHI | 110006 | - | Rejected-Technical not fullfil for technical criteria | |
| 4 | Rejected-Technical | - | Rejected-Technical not fullfil for technical criteria and reffered condition no. 23 | |
| 5 | Rejected-Technical | - | Rejected-Technical not fullfil for technical criteria and reffered condition no. 23 |
| Sl No | Description | Qty | Unit | M/s Aryan Builders L1 | M/S SANT LAL JAIN L2 |
|---|---|---|---|---|---|
| 1.01 | Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven story height made with 40 mm dia M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it thereafter .The scaffolding system shall be stiffened with bracings, runners,connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineerin- charge .The elevational area of the scaffolding shall be measured for payment purpose .The payment will be made once irrespective of duration of scaffolding. 14.72 | 2,767 | SQM | 8,02,430 ₹8,02,430 Lowest | 8,02,430 ₹8,02,430 Lowest |
| 1.02 | Dismantling wood work in frames, trusses, purlins and rafters up to 10 metres span and 5 metres height including stacking the material within 50 metres lead :Of sectional area 40 square centimetres and above cum 15.14.1 | 7.94 | CUM | 7,146 ₹7,146 | 6,352 ₹6,352 Lowest |
| 1.03 | Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia & length ( hold fast lugs or dash fastener shall be paid for separately). Sal wood cum 9.12 | 7.94 | CUM | 8,33,700 ₹8,33,700 Lowest | 9,52,800 ₹9,52,800 |
| 1.04 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position andapplying a priming coat of approved steel primer all complete. 10.2 | 2,482.52 | KG | 3,10,315 ₹3,10,315 Lowest | 3,25,210.12 ₹3,25,210.12 |
| 1.05 | Providing and fixing M.S. rivets of sizes in position.10.21 | 144 | KG | 20,160 ₹20,160 | 18,720 ₹18,720 Lowest |
| 1.06 | Welding by gas or electric plant including transportation of plant at site etc. complete.10.22 | 9,975 | CM | 59,850 ₹59,850 | 49,875 ₹49,875 Lowest |
| 1.07 | Applying priming coats with primer of approved brand and manufacture, having low VOC (Volatile Organic Compound ) content. With ready mixed pink or grey primer on wood work (hard and soft wood) having VOC content less than 50 grams/ litre sqm 57. 13.85.1 | 836.68 | SQM | 58,567.6 ₹58,567.6 | 50,200.8 ₹50,200.8 Lowest |
| 1.08 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : Two or more coats on new work.13.61.1 | 836.68 | SQM | 83,668 ₹83,668 | 75,301.2 ₹75,301.2 Lowest |
Tender Value
Refer Docs
EMD Value
₹43,900
Closing Date
17 Sept 2025, 3:00 pmClosed
Sh. Yogesh Lohchab
Wazirabad Water Works
Strengthening of path on superstructure and P-L of MS jaal for under sluice and weir side gate pier of Barrage at Wazirabad water works. (Re-invite)
2025_DJB_278035_10
NIT No. 08 (2025-26)
Open Tender
Miscellaneous Services
Item Rate
60 days
Wazirabad Water Works
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
DJBEMD A/c No-50448339804
₹43,900
24 Sept 2025
11 Sept 2025
17 Sept 2025
11 Sept 2025
17 Sept 2025
11 Sept 2025
11 Sept 2025 - 17 Sept 2025
Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven story height made with 40 mm dia M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it thereafter .The scaffolding system shall be stiffened with bracings, runners,connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineerin- charge .The elevational area of the scaffolding shall be measured for payment purpose .The payment will be made once irrespective of duration of scaffolding. 14.72
Dismantling wood work in frames, trusses, purlins and rafters up to 10 metres span and 5 metres height including stacking the material within 50 metres lead :Of sectional area 40 square centimetres and above cum 15.14.1
Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia & length ( hold fast lugs or dash fastener shall be paid for separately). Sal wood cum 9.12
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position andapplying a priming coat of approved steel primer all complete. 10.2
Providing and fixing M.S. rivets of sizes in position.10.21
Welding by gas or electric plant including transportation of plant at site etc. complete.10.22
Applying priming coats with primer of approved brand and manufacture, having low VOC (Volatile Organic Compound ) content. With ready mixed pink or grey primer on wood work (hard and soft wood) having VOC content less than 50 grams/ litre sqm 57. 13.85.1
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : Two or more coats on new work.13.61.1
M/S SANT LAL JAIN (BID ID -1620407)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .