Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹39.6 LAccepted-AOC VILLAGE SHAKUNI BAGWALIPOKHER ALMORA RANIKHET UTTARAKHAND | NAINITAL | UTTARAKHAND | 244715 | L1 | Accepted-AOC Accepted | |
| 2 | L2₹39.8 L+₹17,364 (0.44%)Rejected-Finance NARSINGH MALLA NEAR FCI GODAM KAMALUAGANJA ROAD HALDWANI NAINITAL | NAINITAL | UTTARAKHAND | 244713 | L2 | Rejected-Finance Reject | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹40.0 L
EMD Value
₹80,000
Closing Date
7 Dec 2022, 3:00 pmClosed
Superintending Engineer
Superintending Engineer Electricity Distribution Circle Ranikhet
Annual Maintanance and Operation work of 33/11 KV Sub-station Dwarahat under EDD Ranikhet
2022_UPCL9_51320_1
EDD(R)-21/2022-23
Open Tender
Repair and Maintenance Services
Item Wise
365 days
Dwarahat
As per Tender Document
2 documents required · 2 mandatory
₹2,360
Executive Engineer
₹80,000
25 Sept 2023
7 Nov 2022
8 Dec 2022
7 Nov 2022
7 Dec 2022
7 Nov 2022
Amount
Maintenance and preventive maintenance of 33/11 KV S/s, 33 KV, 11KV, LT/HT line and DTR's as per JE instructions (30 Km 33KV, 130 Km 11KV, 335 Km LT line and 177 Nos. DTR) including timely release of NSC & distribution works as per JE Instructions and consumer complaints handling as per UERC supply code 2020 including contractor profil.
Operation work in shifts (4 shifts) for operation of 33/11 KV S/s. 1 shift out of 4 shift system.
Meter reading and bill distribution work of consumers as per schedule monthly / bimonthly basis including SBM & accessories-cartage etc. Unbilled/RDF penality will be imposed @ 300/bill
Supervison work of maintenance and meter reading works.
Description of Work / Item(s)
Amount
Replacement of damaged/rotten or erection of midspan poles including cartage from S/s Dwarahat/ESC Almora (NOTE- Amount per pole will be paid as per this rate but penality will be imposed twice the rate)
Replacement of IDF/Mechanical meter 40 per month.
R&R of damaged transformer 5% of 180 = 09. Excess damaged transformers will be replaced free of cost by the contractor.
G R ENTERPRISES
G R ENTERPRISES
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .