| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.9 LAccepted-AOC BAGESHWAR UTTARAKHAND UT | BAGESHWAR | UTTARAKHAND | 263619 | ₹26.9 L | L1 | Accepted-AOC lowest bidder |
| 2 | L2₹27.3 LRejected-Finance VAJYULA GARUD DISTRICT BAGESHWAR | BAGESHWAR | UTTARAKHAND | 263619 | ₹27.3 L | L2 | Rejected-Finance Second lowest bidder |
| 3 | L3₹28.1 LRejected-Finance BAGESHWAR UTTARAKHAND UT | ₹28.1 L | L3 | Rejected-Finance Third lowest bidder |
| 4 | Not Admitted-Fee/PreQual/Technical/Finance BAGESHWAR UTTARAKHAND UT | BAGESHWAR | UTTARAKHAND | 263619 | - | - | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
| 5 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
| Sl No | Description | Qty | Unit | RAJENDRA RAWAT L1 | MOHAN SINGH RAWAT L2 | PRATAP PURI L3 |
|---|---|---|---|---|---|---|
| 1.00 | Dismantling Roofing including ridges,hips,valleys and gutters etc.and stackng the material within 50 meters lead of: G.S. Sheet | 243.8 | sqm | 50 ₹12,190 | 50 ₹12,190 | 6.9 ₹1,682.22 |
| 2.00 | Dismantling wood work in frames, trusses, purlins and rafters up to 10 metres span and 5 metres height including stacking the material within 50 metres lead :Of sectional area 40 square centimetres and above | 3.03 | cum | 1,400 ₹4,242 | 2,120 ₹6,423.60 | 189.33 ₹573.67 |
| 3.00 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 34.97 | cum | 650 ₹22,730.50 | 1,350 ₹47,209.50 | 98.31 ₹3,437.90 |
| 4.00 | Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge :In cement mortar | 33.25 | cum | 700 ₹23,275 | 1,450 ₹48,212.50 | 99.27 ₹3,300.73 |
| 5.00 | Taking out doors, windows and clerestory window shutters (steel or wood) including stacking within 50 metres lead :Of area 3 sq. metres and below | 35 | Nos | 50 ₹1,750 | 92 ₹3,220 | 6.03 ₹211.05 |
| 6.00 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. | 363.3 | sqm | 20 ₹7,266 | 15 ₹5,449.50 | 2.21 ₹802.89 |
| 7.00 | Grading roof for water proofing treatment with Cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 10.8 | cum | 6,569.91 ₹70,955.03 | 2,300 ₹24,840 | 5,760 ₹62,208 |
| 8.00 | Providing and laying water proofing treatment on roofs of slabs by applying cement slurry mixed with water proofing cement compound consisting of applying: (a) after surface preparation, first layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound @ 0.253 kg/sqm (b) laying second layer of Fibre glass cloth when the first layer is still green. Overlaps of joints of fibre cloth should not be less than 10 cm. (c) third layer of 1.5 mm thickness consisting of slurry of cement @ 1.289 kg/ sqm mixed with water proofing cement compound @ 0.670 kg/sqm and coarse sand @ 1.289 kg/sqm. This will be allowed to air cure for 4 hours followed by water curing for 48 hours. The entire treatment will be taken upto 30 cm on parapet wall and tucked into groove in parapet all around.(d) fourth and final layer of brick tiling with cement mortar (which will be paid for separately. | 359.87 | sqm | 496.25 ₹1.8 L | 415 ₹1.5 L | 432 ₹1.6 L |
| 9.00 | Extra for providing and mixing water proofing material in cement plaster work in proportion recommended by the manufacturers | 359.87 | sqm | 56.69 ₹20,401.03 | 39 ₹14,034.93 | 64.02 ₹23,038.88 |
| 10.00 | Neat Cement punning. | 359.87 | sqm | 59.53 ₹21,423.06 | 30 ₹10,796.10 | 67.23 ₹24,194.06 |
Tender Value
₹34.9 L
EMD Value
₹69,900
Closing Date
22 Nov 2024, 12:00 pmClosed
EE, RWD DIVISION BAGESHWAR
EE, RWD DIVISION BAGESHWAR
Major repair/improvement work of school buildings in Government Inter College Bhatkhola.
2024_RES_77630_1
1061/RWD/2024-25 DATE 06-11-2024
Open Tender
Civil Works - Buildings
270 days
BAGESHWAR
Please refer tender documents.
1 document required · 1 mandatory
₹2,950
LEKHASHIRSH 0515008000100 and GST 05AAAGR0664Q1ZW
₹69,900
3 Feb 2026
8 Nov 2024
22 Nov 2024
8 Nov 2024
22 Nov 2024
8 Nov 2024
Amount
Dismantling Roofing including ridges,hips,valleys and gutters etc.and stackng the material within 50 meters lead of: G.S. Sheet
Dismantling wood work in frames, trusses, purlins and rafters up to 10 metres span and 5 metres height including stacking the material within 50 metres lead :Of sectional area 40 square centimetres and above
Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge :In cement mortar
Taking out doors, windows and clerestory window shutters (steel or wood) including stacking within 50 metres lead :Of area 3 sq. metres and below
Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead.
Grading roof for water proofing treatment with Cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
Providing and laying water proofing treatment on roofs of slabs by applying cement slurry mixed with water proofing cement compound consisting of applying: (a) after surface preparation, first layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound @ 0.253 kg/sqm (b) laying second layer of Fibre glass cloth when the first layer is still green. Overlaps of joints of fibre cloth should not be less than 10 cm. (c) third layer of 1.5 mm thickness consisting of slurry of cement @ 1.289 kg/ sqm mixed with water proofing cement compound @ 0.670 kg/sqm and coarse sand @ 1.289 kg/sqm. This will be allowed to air cure for 4 hours followed by water curing for 48 hours. The entire treatment will be taken upto 30 cm on parapet wall and tucked into groove in parapet all around.(d) fourth and final layer of brick tiling with cement mortar (which will be paid for separately.
Extra for providing and mixing water proofing material in cement plaster work in proportion recommended by the manufacturers
Neat Cement punning.
Reinforced cement concrete work in Beam,suspended floor roof having slop up to 15 degree landing balcony shelf chajjas lintels band plain windoe cills staircase & sprial stair case etc. up to floor five level,excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate20 mm nominal size)
Centring and shuttering including strutting,ropping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers.
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete.
Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete Hot finished welded type tubes
Random rubble masonry with hard stone in superstructure above plinth level and upto floor five level levellingup with cement concrete 1:6:12 (1 cement:6 coarse sand 12 aggregate 20mm nominal size)at plinth level with Cement mortar 1:6 (1 cement:6 C/S).
Providing and laying vitrified floor tiles in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS: 15622, of approved make, in all colours and shades, laid on 20mm thick cement mortar 1:4 (1 cement : 4 coarse sand), jointing with grey cement slurry @ 3.3 kg/ sqm including grouting the joints with white cement and matching pigments etc., complete.Size of Tile 600x600 mm
Kota stone slab flooring over 20 mm (average) thick base laid over and jointed with grey cement slurry mixed with pigment to match the shade of the slab including rubbing and polishing complete with base of cement mortar 1 : 4 (1 cement : 4 coarse sand) 25 mm thick
Providing and fixing precoated galvanised iron profile sheets (size,shape and pitch of corrugation as approved by Engineer-in-charge)0.50 mm (+ 0.05 %) total coated thickness with zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns. Sheet should have protective guard film of 25 microns minimum to avoid scratches during transportation and should be supplied in single length upto 12 metre or as desired by Engineerin-charge. The sheet shall be fixed using self drilling /self tapping screws of size (5.5x 55 mm) with EPDM seal, complete upto any pitch in horizontal/ vertical or curved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required
Providing and fixing precoated galvanised steel sheet roofing accessories 0.50 mm (+ 0.05 %) total coated thickness, Zinc coating120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns using self drilling/ self tapping screws complete Ridges plain (500 - 600mm)
Providing and fixing plain lining with necessary screws/nuts & bolts/ nails, including a coat of approved primer on one face, and fixed on wooden /steel frame work, complete as per direction of Engineer-in charge (Frame work shall be paid for separately).12mm thick commercial ply conforming to IS : 1328 BWR type
Providing and fixing 1mm thick M.S. sheet door with frame of 40x40x6 mm angle iron and 3 mm M.S. gusset plates at the junctions and corners, all necessary fittings complete, including applying a priming coat of approved steel primer.Using lats 30x6mm for diagonal braces and central cross piece
Kota stone slabs 20 mm thick in risers of steps, skirting, dado and pillars laid on 12 mm (average) thick cement mortar 1:3 (1 cement: 3 coarse sand) and jointed with grey cement slurry mixed with pigment to match the shade of the slabs, including rubbing and polishing complete.
12 mm cement plaster of mix : 1:6 (1 cement: 6 fine sand)
Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete.40 mm thick with 20 mm nominal size stone aggregate
Providing and fixing glass strips in joints of terrazo/ cement concrete floors.40 mm wide and 4 mm thick.
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
Providing & fixing fly proof wire gauze to windows, clerestory windows & doors with M.S. Flat 15x3 mm and nuts & bolts complete.Galvanised M.S. Wire gauze with 0.63 mm dia wire and 1.4 mm aperture on both sides
Providing and fixing ISI marked flush door shutters conforming to IS : 2202 (Part I) non-decorative type, core of block board construction with frame of 1st class hard wood and well matched commercial 3 ply veneering with vertical grains or cross bands and face veneers on both faces of shutters:30 mm thick including ISI marked Stainless Steel butt hinges with necessary screws.
Providing and fixing factory made ISI marked steel glazed doors, windows and ventilators, side /top /centre hung, with beading and all members such as F7D,F4B, K11 B and K12 B etc. complete of standard rolled steel sections, joints mitred and flash butt welded and sash bars tenoned and riveted, including providing and fixing of hinges, pivots, including priming coat of approved steel primer, but excluding the cost of other fittings, complete all as per approved design, (sectional weight of only steel members shall be measured for payment).Fixing with 15x3 mm lugs 10 cm long embedded in cement concrete block 15x10x10 cm of C.C. 1:3:6 (1 Cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete.
Distempering with 1st quality acrylic VOC content distemper (ready made) of approved manufacturer and of required shade and colour complete, as per manufacturer’s specificationTwo or more coats on old work.
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two or more coats on new work
Painting wood work with Deluxe Multi Surface Paint of required shade. Two or more coat applied @ 0.90 ltr/10 sqm over an under coat of primer applied @0.75 ltr/10 sqm of approved brand and manufacture
Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two or more coat applied @ 0.90 ltr/ 10 sqm over an under coat of primer applied @ 0.80 ltr/ 10 sqm of approved brand and manufacture
MOHAN SINGH RAWAT (BID ID -345677)
PRATAP PURI (BID ID -345451)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_92608.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid