Executive Engineer, R&B Division, Bhuj
Repairing of Minor Bridge on Chainage (1)0/00 to 1/00 & (2) 3/00 to 4/00 on Bhuj Lakhapat Road Km 0/00 to 5/400 Ta. Bhuj, Dist. Kutch
337375
40 For 2026-27
Open
Repair and Maintenance
Works
Kutch
11 documents required · 11 mandatory
₹1,500
Executive Engineer, R and B Division, Bhuj
₹31,000
21 Aug 2026
21 Aug 2026
21 Aug 2026
7 Sept 2026
21 Aug 2026
Name of work :-
Repairing of Minor Bridge on Chainage (1)0/00 to 1/00 & (2) 3/00 to 4/00 on
Bhuj Lakhapat Road Km 0/00 to 5/400 Ta. Bhuj, Dist. Kutch
Bill of Quantity
Memorandum showing items of works to be carried out.
It. Qty. Item of work Estimated Rates Unit Total amount according
It. Qty. Item of work Estimated Rates Unit Total amount according
No. Estimated In Figures In Words
to estimated Quantities
1 1.08 Clearing and grubbing road land 34889.38 Rupees Thirty Ha
including uprooting rank vegetation Four Thousand
grass bushes, shrubs, sapling and Eight Hundred
trees girth up to 300 mm removal Eighty Nine
of stumps of trees cut earlier and And Paise
disposal of unserviceable Thirty Eight
materials(D) By mechanical means Only
in area of thorny jungle
2 326.00 Removing and scraping of old 19.89 Rupees Smt
deteriorated plaster of any Nineteen And
thickness fromm wall / R.C.C Paise Eighty
member including stacking of Nine Only
serviceable material and disposal of
unserviceable from site of work
with all lead and lift
3 465.00 Scaffolding:-Providing, erecting and 208.06 Rupees Two Smt
dismantling safe H frame and/ pipe Hundred Eight
scaffolding including working And Paise Six
platform for external area of bridge Only
pier to facilitate all works etc.
completed, Measurement for
payment shall be considered as per
detailed specification. (Property of
contractor, and repetitions willbe
paid per pier) (for Every 1 m extra
height, increase the rate by
rupees/ meter height )A) up to
4 146.75 Removal of defective concrete, 594.79 Rupees Five Smt
cleaning the surface thoroughly, Hundred
applying the shotcrete mixture Ninety Four
mechanically with compressed air And Paise
under pressure, comprising of Seventy Nine
cement, sand, coarse aggregates, Only
water and quick setting compound
in the proportion as per clause
2807.1., sand and coarse
aggregates conforming to IS:383
and table 1 of IS:9012 respectively,
water cement ratio ranging from
0.35 to 0.50, density of gunite not
less than 2000kg/cum, strength
not less than 25 Mpa and
workmanship conforming to clause
It. Qty. Item of work Estimated Rates Unit Total amount according
It. Qty. Item of work Estimated Rates Unit Total amount according
No. Estimated to estimated Quantities
but may be In Figures In Words
5 389.20 Providing and inserting nipples 502.98 Rupees Five Each
with approved fixing compound Hundred Two
after drilling holes for grouting as And Paise
per Technical specifications Ninety Eight
including subsequnt cutting Only
/removal and sealing of the hole as
necessary of nipples after
completion of grouting with
6 583.80 Sealing of cracks / porous concrete 794.87 Rupees Seven Kg
by injection process through Hundred
nipples/ Grouting complete as Ninety Four
perTechnical specification. And Paise
7 146.75 Epoxy bonding agent of new 529.24 Rupees Five Smt
concrete to old concrete. The Hundred
applied bond agent should possess Twenty Nine
min properties as below: Shear And Paise
Strength -@7 days 20N/mm Twenty Four
2Flexural Strength- @7days Only
35N/mm 2Compressive Strength-
@7 days 50N/mm 2(The new repair
mortar /concrete should be applied
within overlay time of epoxy
bonding agent mentioned as per
manufacturer's datasheets)
8 146.75 Applying epoxy mortar over 436.32 Rupees Four Smt
leached, honeycombed and salled Hundred Thirty
concrete surface and exposed steel Six And Paise
reinforcement complete as per Thirty Two Only
Technical specification
9 939.54 Guniting concrete surface with 775.68 Rupees Seven Smt
cement mortar applied with Hundred
compressor after cleaning surface Seventy Five
and spraying with epoxy complete And Paise Sixty
as per Technical speciication Eight Only
.(Reference to MORT&H's
specification 2807)
10 186.00 Providing 15mm thick cement 180.40 Rupees One Smt
plaster in single coat on Rough Hundred
(Similar)side of single or half brick Eighty And
walls for interior plastering upto Paise Forty
floor two level and finished even Only
and smooth in (i) Cement mortar
1:3 (1-cement:3-sand)
It. Qty. Item of work Estimated Rates Unit Total amount according
It. Qty. Item of work Estimated Rates Unit Total amount according
No. Estimated to estimated Quantities
but may be In Figures In Words
11 186.00 Finishing wall with weather proof 196.94 Rupees One Smt
exterior emulsion paint including Hundred
primer on wall surface (two coats) Ninety Six And
to give an required shape even Paise Ninety
shade after thoroughly brushing Four Only
the surface to remove all dirt, and
remains of loose powdered
materials.etc complete
12 1594.60 Providing and applying approved 743.24 Rupees Seven Smt
elastomeric anti-carbonation Hundred Forty
protective coating system on Three And
exposed concrete surfaces of bridge Paise Twenty
components such as deck soffit, Four Only
girders, piers, pier caps,
abutments, return walls and
parapets, comprising thorough
surface preparation by removing
dust, laitance, oil, grease, algae,
loose particles and deteriorated
coatings by wire brushing, grinding
and water jetting/air blowing,
making good minor surface defects
with approved polymer modified
repair mortar wherever required,
applying one coat of compatible
acrylic/epoxy based primer
followed by two coats of anti-
carbonation elastomeric acrylic
protective coating of approved
make and shade to achieve a
minimum dry film thickness of
250–300 microns, complete with all
materials, labour, tools and plants,
scaffolding, curing/protection,
finishing and all incidental works,
as per the manufacturer's
specifications, technical
Rupees Thirty Lakh(s) Thirteen Thousand Eight Hundred Thirty Six And Paise Ninety Nine Only
*Estimated amount *Estimated amount
Put to tender Rs……………………… Put to tender Rs………………………
Deduct : ………% below Add : ………% above
Net Rs……………………… Net Rs………………………
In words ……………………………… In words ………………………………
*(please strike out whichever is not applicable)
Note-1 All works shall be carried out as per Public Works Department Handbook and other specifications of
Division or as directed.
Note-3 Rates quoted include clearance of site (prior commencement of work and its close) in all respects and
hold good for work under all conditions, site, moisture, weather etc.
Note-5 Testing Charges for the quality of material shall be recovered as per SBD
It. Qty. Item of work Estimated Rates Unit Total amount according
It. Qty. Item of work Estimated Rates Unit Total amount according
No. Estimated to estimated Quantities
but may be In Figures In Words
Note-8 pnMU VG[ BF6 lJEFU4 ;lRJF,I4 UF\WLGUZGF 9ZFJ S|DF\So V[DPV[DPVFZPv !!Z___vZ_!#vK4 TFP!q)qZ__$ YL
ZFHI ;ZSFZGF AF\WSFD DF8[ J5ZFTF UF{6vBlGHGL ZMI<8L ;FNL DF8L VG[ ;MO8 DMZD 5Z ZMI<8L ,FU] 50X[P
Note-9 Labour Cess shall be recovered as per SBD
Note-10 Quantity of items may reduce or increase as per work execution.
Note-11 p5ZMST SFD SM.56 SFZ6;Z D\H]Z q GFD\H]Z SZJFGL ;œF ;CL SZGFZ VlWSFZLGL VAFlWT ZC[X[P
Note-13 In RCC items where there is change of grade mix or change as per actual mix design the difference of
cement consumption shall be deducted from rate of original item at the rate of star rate mentioned in
tender. However for Increase in quantity of cement no additional payment shall be made.
Note-14 For earthquake resistance provision the work shall be carried out as per the instruction of Engineer in-
Note-16 CM8DL1F %,Fg8 VG[ 5[JZYL YTF 0FDZGF SFDM AFAT[ ;ZSFZzLGF DFP VG[ DP lJEFU4 UF\WLGUZGF 5lZ5+
G\PV[;V[RVFZq!5(&qVF.ALq!*)s&fv;4 TFPZ_q!q_* VG[ 5ZL5+ S|DF\SP5ZRq!_qZ_!5q55q;L4 TFP_$q!!q!5
D]HA VG];ZJFG]\ ZC[X[P
Note-17 U]HZFT ;ZSFZzLGF DFPDPlJEFUGF 5lZ5+ S|DF\So VFZHLV[Gq&_Z__&qs#5fv; YL NFB, YI[, XZTMP
1) 5_DLDLYL JW] 0FDZ SFDGL ;\I]ST HF0F. sALPV[;PHLP4 ALPALPV[DP l;JFIf CMI T[JF Z:TFGF SFDDF\ NZ Z5_DLP NL9
V[S S|M; ;[SXG 5Z 0FDZSFDGL 5CM/F. VG];FZ A[ YL RFZ SMZ ;[d5, .HFZNFZ[ 5MTFGF SMZ S8L\U DXLG J0[ ;\A\lWT
GFIA SFI"5F,S .HG[ZzLGL CFHZLDF\ D[/JL VF5JFGF ZC[X[ VG[ VF ;[d5, ;L, SZL DFgI ,[AMZ[8ZL DFZOT YLSG[;4
0[g;L8L TYF AL8]DLG; Sg8[\8GF 5lZ1F6 SZFJL 5lZ6FD[ D[/JJFGF ZC[X[P ;\TMQFSFZS 5lZ6FDM VFjIF ;]WL 0FDZ SFDGL
R]SJJF5F+ ZSDGF 5@ ZSD JLYC[<0 ZFBJFDF\ VFJX[4 H[ ZSD ;\TMQFSFZS 5lZ6FDM D?IF AFN H K]8L SZFX[P 5Z\T]
;\TMQFSFZS 5lZ6FDM GlC\ D[/JJFGF lS:;FVMDF\ SZFZGL VgI XZTM VG];FZ SFI"JFCL Y. XSX[P
2) ~FP!__ ,FB S[ T[YL JW] ZSDGF SZFZ C[9/GF SFD 5Z .HFZNFZ[ O],8F.D SJM,LOF.0 V[gHLGLIZ lGI]ST SZJFGM ZC[X[ H[
V\U[ SFDGF JS"VM0"Z D?I[ lNGv!5 DF\ SFI"5F,S .HG[ZzLGL HF6 C[9/4 GFIA SFI"5F,S .HG[ZzLG[ lGO]S .HG[ZGF GFD4
SJM,LOLS[XG4 DFS"XL84 ;8L"OLS[84 S,Z OM8MU|FO4 lGI]lSTGF C]SD JU[Z[ lJUT ZH] SZJFGL ZC[X[ TYF SFD 5Z CFHZ YIF
V\U[GM ZL5M8" VF5JFGM ZC[X[4 H[ VG];FZ SZFZ C[9/GF SFD 5Z SJM,LOF.0 .HG[ZGL p5ZMST XZT D]HA lGI]lST YFI
TYF :Y/ 5Z BZ[BZ SFDULZL G ;\EF/[ tIF\ ;]WLGF ;DIUF/F T[DH SFD RF,] ZC[ T[ ;DI NZdIFG lGI]S SZ[, .HG[Z
SFDULZL ;\EF/X[ GlC\ T[ ;DIUF/F DF8[ ~FP!54___qv 5|lTDF; ,[B[ lA,DF\YL S5FT SZJFDF\ VFJX4 H[ GMG ZLO\0[A,
Signature of Contractor Executive Engineer
R&B Division, Bhuj
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Additional Instructions.pdf
BOQ.pdf
Bridge Booklet(1).pdf
Bridge Booklet(2).pdf
BUILDING SPECIFICATIONS BOOK.pdf
GR.pdf
ROAD WORK Booklet - 1.pdf
ROAD WORK Booklet - 2.pdf
SBD Book.pdf
Spe. Index.pdf
Specifications.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].