| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.1 CrAdmitted-Finance B1 10 MUKUNDRAO AMBEDKAR ROAD SION MUMBAI MAHARASHTRA 400037 | MUMBAI | MUMBAI | MAHARASHTRA | 400037 | L1 | Admitted-Finance | |
| 2 | Rejected-Technical | - | Rejected-Technical Reject |
| Sl No | Description | Qty | Unit | Pyara Singh and Sons L1 |
|---|---|---|---|---|
| 1.00CIVIL WORK | ||||
| 1.01PART-A, ESTIMATE FOR THE CONSTRUCTION OF PORT STATION AT BADAYUN ROAD LOCATION ( BAREILLY NAGAR NIGAM ) AS PER DRAWING | ||||
| 1.02 | EXCAVATION IN FOUNDATION IN ORDINARY SOIL IN FOUNDATION & SUPERSTRUCTUREAS MENTIONED IN THE DRAWING ( 2.1 ) | 143.1 | CUM | 123.2 ₹17,629.92 Lowest |
| 1.03 | SUPPLY & LAYING OF PLAIN CEMENT CONCRETE WITH 40 MM BRICK BALLAST OR STONE BALLAST AND COARSE SAND 1:4:8 IN FOUNDATION AND FLOORS COMPLETED INCLUDING ALL MATERIAL AND LABOUR. ( 4.1.8 ) | 47.47 | CUM | 6,494 ₹3,08,270.18 Lowest |
| 1.04 | SUPPLY & LAYING OF R.C.C IN M-20 GRADE ( 1:1.5:3 ) IN COLUMNS FOOTINGS & COLUMNS BELOW PLINTH ETC INCLUDING ALL MATERIALS & LABOUR WITH COMPLETE EXCLUDING CENTERING , SHUTTERING, & REINFORCEMENT STEEL ( 5.1.2 ) | 11.07 | CUM | 8,636.5 ₹95,606.06 Lowest |
| 1.05 | SUPPLY & LAYING OF R.C.C IN M-20 GRADE ( 1:1.5:3 ) IN COLUMNS, FLOORS ABOVE PLINTH LEVEL ETC INCLUDING ALL MATERIALS & LABOUR WITH COMPLETE SHUTTERING, CENTERING & BINDING OF STEEL BUT EXCLUDING THE SUPPLY CUTTING & BENDING OF STEEL ( 5.2.2 ) | 59.46 | CUM | 10,360.5 ₹6,16,035.33 Lowest |
| 1.06 | CENTERING & SHUTTERING WORK IN COLUMNS FOOTING INCLUDING ALL MATERIAL & LABOUR REQUIRED FOR THR PROPER COMPLETION OF WORK ( 5.9.1 ) | 28.8 | SQM | 371 ₹10,684.8 Lowest |
| 1.07 | CENTERING & SHUTTERING WORK IN FLOORS & SLABS INCLUDING ALL MATERIAL & LABOUR REQUIRED FOR THR PROPER COMPLETION OF WORK ( 5.9.3 ) | 33 | SQM | 859 ₹28,347 Lowest |
| 1.08 | CENTERING & SHUTTERING WORK IN COLUMNS INCLUDING ALL MATERIAL & LABOUR REQUIRED FOR THR PROPER COMPLETION OF WORK ( 5.9.6 ) | 64.8 | SQM | 859 ₹55,663.2 Lowest |
| 1.09 | SUPPLY AND FIXING OF 450 X 450 X 12 THK ANCHOR PLATES WITH SUITABLE SIZE OF HOLD FAST, EMBEDDED IN CONCRETE OF COLUMN AND BEAM PORTIONS TO ATTACH THE 50 X 50 SQUARE PIPE SUPPORT ( 10.16.1 ) | 228 | KG | 185.2 ₹42,225.6 Lowest |
Tender Value
Refer Docs
EMD Value
₹42 L
Closing Date
13 Feb 2026, 4:00 pmClosed
RAJEEV KUMAR RATHI
NAGAR NIGAM BAREILLY
Request for Proposal (RFP) for Construction, Supply, Installation and Commissioning of 4 Solid Waste Transfer Stations with 1-Year Defect Liability, and for Operation, Maintenance and Waste Transportation to Sathrapur Site for 5 Years in Bareilly Cit
2026_DOLBU_1111542_1
27/P.A./S.W.M./N.N./2025-26 Date-29.01.2026
Open Tender
Miscellaneous Services
Item Rate
1825 days
BAREILLY
Please refer Tender documents.
2 documents required · 2 mandatory
₹11,800
Bareillye-tender.com
₹42 L
RAJEEV KUMAR RATHI (EXECUTIVE ENGINEER)
17 Mar 2026
2 Feb 2026
13 Feb 2026
2 Feb 2026
13 Feb 2026
6 Feb 2026
4 Feb 2026
CIVIL WORK
PART-A, ESTIMATE FOR THE CONSTRUCTION OF PORT STATION AT BADAYUN ROAD LOCATION ( BAREILLY NAGAR NIGAM ) AS PER DRAWING
EXCAVATION IN FOUNDATION IN ORDINARY SOIL IN FOUNDATION & SUPERSTRUCTUREAS MENTIONED IN THE DRAWING ( 2.1 )
SUPPLY & LAYING OF PLAIN CEMENT CONCRETE WITH 40 MM BRICK BALLAST OR STONE BALLAST AND COARSE SAND 1:4:8 IN FOUNDATION AND FLOORS COMPLETED INCLUDING ALL MATERIAL AND LABOUR. ( 4.1.8 )
SUPPLY & LAYING OF R.C.C IN M-20 GRADE ( 1:1.5:3 ) IN COLUMNS FOOTINGS & COLUMNS BELOW PLINTH ETC INCLUDING ALL MATERIALS & LABOUR WITH COMPLETE EXCLUDING CENTERING , SHUTTERING, & REINFORCEMENT STEEL ( 5.1.2 )
SUPPLY & LAYING OF R.C.C IN M-20 GRADE ( 1:1.5:3 ) IN COLUMNS, FLOORS ABOVE PLINTH LEVEL ETC INCLUDING ALL MATERIALS & LABOUR WITH COMPLETE SHUTTERING, CENTERING & BINDING OF STEEL BUT EXCLUDING THE SUPPLY CUTTING & BENDING OF STEEL ( 5.2.2 )
CENTERING & SHUTTERING WORK IN COLUMNS FOOTING INCLUDING ALL MATERIAL & LABOUR REQUIRED FOR THR PROPER COMPLETION OF WORK ( 5.9.1 )
CENTERING & SHUTTERING WORK IN FLOORS & SLABS INCLUDING ALL MATERIAL & LABOUR REQUIRED FOR THR PROPER COMPLETION OF WORK ( 5.9.3 )
CENTERING & SHUTTERING WORK IN COLUMNS INCLUDING ALL MATERIAL & LABOUR REQUIRED FOR THR PROPER COMPLETION OF WORK ( 5.9.6 )
SUPPLY AND FIXING OF 450 X 450 X 12 THK ANCHOR PLATES WITH SUITABLE SIZE OF HOLD FAST, EMBEDDED IN CONCRETE OF COLUMN AND BEAM PORTIONS TO ATTACH THE 50 X 50 SQUARE PIPE SUPPORT ( 10.16.1 )
SUPPLY & FIXING OF 25 MM DIA & 750 LONG FOUNDATION BOLTS WITH 03 NOS NUTS TO BE FIXED DURING CONCRETING WITH THE HELP OF TAME PLATE COMPLETE WITH ALL MATERIAL & REQUIRED LABOUR. ( 10.16.1 )
SUPPLY & LAYING OF BRICK WORK 450 THICK WITH 1:4 CEMENT SAND MORTAR IN FOUNDATION AND PLINTH INCLUDING ALL MATERIAL & LABOUR REQUIRED FOR THE PROPER COMPLETION OF WORK.. ( 6.1.1 )
SUPPLY & LAYING OF BRICK WORK THICK WITH 1:4 CEMENT SAND MORTAR IN SUPERSTRUCTURE AND INCLUDING ALL MATERIAL & LABOUR REQUIRED FOR THE PROPER COMPLETION OF WORK.. ( 6.4.1 )
12 MM THICK PLASTER WITH 1:4 CEMENT SAND MORTAR ON WALLS INCLUDING THE SUPPLY OF ALL MATERIAL & LABOUR REQUIRED FOR THE PROPER & SMOOTH FINISHING OF WORK. ( 13.4.1 )
SUPPLY, CUTTING & BENDING OF REINFORCEMENT STEEL IN COLUMNS , FOOTINGS , FLOORS & SLABS ALL COMPLETE AT ITS PROPER LOCATION AS PER DRAWING ( 5.22.6 )
SUPPLY & FIXING OF GLAZED WALL TILES OF SUITABLE SIZE UP TO THE HT OF 2 MTR COMPLETE IN ALL RESPECT & IN PROPER LINE AND LEVELS ( 11.37 )
SUPPLY FEBRICATION & FIXING OF MS SQ PIPE 50 X 50 SIZE TO PREPARE STRUCTURAL COLUMNS & BEAMS ( 200 X 200 ) , TRUSS, PURLINS , MAIN GATES ETC INCLUDING SUPPLY OF ALL MATERIAL AND LABOUR REQUIRED FOR THE PROPER COMPLETION OF WORK. ( 10.16.1 )
SUPPLY, FEBRICATION & FIXING OF M.S PLATES ( 300 X 300 ) SIZE AT COLUMNS & BEAMS JUNCTION POINT INCLUDING ALL MATERIAL & LABOUR REQUIRED FOR THE PROPER COMPLETION OF WORK ( 10.16.1 )
SUPPLY, FEBRICATION & FIXING OF M.S PLATES ( 200 X 200 ) SIZE AT FOR JOINING ALL 4 PIPES OF COLUMNS & BEAMS FROM OUTER SIDE INCLUDING ALL MATERIAL & LABOUR REQUIRED FOR THE PROPER COMPLETION OF WORK ( 10.16.1 )
SUPPLY OF PPGI / CGS SHEETS FOR COVERING ALL AROUND THE PORT STATION WALLS & ALSO FOR ROOF COVERING ABOVE TRUSS PORTION INCLUDING PROPER OVERLAPPING COMPLETE IN ALL RESPECT AS PER REQUIREMENTS ( 12.1.3 )
SUPPLY , FEBRICATION AND FIXING OF 12 MM THK M.S PLATES FOR MOVING PORTABLE COMPACTOR INSIDE THE PORT STATION ( 10.16.1 )
SUPPLY AND GROUTING OF CHEMICAL ANCHOR FASTENERS TO HOLD THE CHEQURED PLATES AT ITS PLACE AS PER DRAWING COMPLETE IN ALL RESPECTS
SUPPLY FEBRICATION AND FIXING OF GRATING ( 25 X 5 ) MS FLATS WITH GRATING SUPPORTS ( MS 50 X 50 X 5 ANGLE ) FOR LEACHATE DRAIN INSIDE PORT STATION ( 10.16.1 )
SUPPLY , FEBRICATION AND FIXING OF MS PLATE ( 2 M X 2 M ) COVER WITH ITS SUPPORT ( MS 50 X 50 X 5 ANGLE ) OVER MAIN HOLE OF PORT STATION ( 10.16.1 )
PAINTING ALL AROUND PORT STATION OVER PLASTERED SURFACE WITH 2 COATS OF WATER PROOF CEMENT PAINT FOR PROVIDING SMOOTH FINISH INCLUDING SUPPLY OF ALL MATERIAL AND LABOUR REQUIRED FOR PROPER COMPLETION OF WORK ( 13.44 )
ELECTRICAL WORK INSIDE THE PORT STATION / OFFICE / GUARD ROOM / TOILET ETC INCLUDING THE SUPPLY AND FIXING OF PANELS / MCB / CHANGEOVER / OPEN WIRING / PREPARING OF CIRCUITS / ALL LIGHTS & FANS ETC COMPLETE IN ALL RESPECT.
1.5 SQ MM WIRE ( POLYCAB FRLS )
2.5 SQ MM WIRE ( POLYCAB FRLS )
10 SQ MM COPPER CABLE
MCB BOX ( HAVELLS )
65 APM MCB ( HAVELLS )
MODULAR BOXES
16 AMP SWITCHES ( HAVELLS )
16 AMP SOCKETS ( HAVELLS )
FAN REGULATORS ( HAVELLS )
CONDUITS
POWER SWITCHES & SOCKET SET ( HAVELLS )
LED LIGHTS & HOLDERS ( HAVELLS )
HALOGENS 1500 WATT
FANS ( CROMPTON GREAVES )
CHANGE OVERS WITH CUTOUTS
25 SQ MM GREEN CABLE FOR EARTHING
LABOUR ELECTRIFICATION WORK
PART-B, ESTIMATE FOR THE CONSTRUCTION OF TRANSFER STATION AT PILIBHIT BYE PASS NEAR ROHILKHAND UNIVERSITY LOCATION ( BAREILLY NAGAR NIGAM ) AS PER DRAWING
DISMENTALLING OF EXISTING REINFORCED CONCRETE FLOOR / PAEDESTALS ETC AS PER REQUIREMENTS BEFORE STARTING THE EXCAVATION AND ALL COMPLETE ( 15.3 )
DISMENTALLING OF EXISTING 9" THK BRICK WALLS ETC AS PER REQUIREMENTS BEFORE STARTING THE EXCAVATION AND ALL COMPLETE ( 15.7.4 )
EXCAVATION IN FOUNDATION IN ORDINARY SOIL IN FOUNDATION & SUPERSTRUCTUREAS MENTIONED IN THE DRAWING ( 2.1 )
SUPPLY & LAYING OF PLAIN CEMENT CONCRETE WITH 40 MM BRICK BALLAST OR STONE BALLAST AND COARSE SAND 1:4:8 IN FOUNDATION AND FLOORS COMPLETED INCLUDING ALL MATERIAL AND LABOUR. ( 4.1.8 )
SUPPLY & LAYING OF R.C.C IN M-20 GRADE ( 1:1.5:3 ) IN COLUMNS FOOTINGS & COLUMNS BELOW PLINTH ETC INCLUDING ALL MATERIALS & LABOUR WITH COMPLETE EXCLUDING CENTERING , SHUTTERING, & REINFORCEMENT STEEL ( 5.1.2 )
SUPPLY & LAYING OF R.C.C IN M-20 GRADE ( 1:1.5:3 ) IN COLUMNS, FLOORS ABOVE PLINTH LEVEL ETC INCLUDING ALL MATERIALS & LABOUR WITH COMPLETE SHUTTERING, CENTERING & BINDING OF STEEL BUT EXCLUDING THE SUPPLY CUTTING & BENDING OF STEEL ( 5.2.2 )
CENTERING & SHUTTERING WORK IN COLUMNS FOOTING INCLUDING ALL MATERIAL & LABOUR REQUIRED FOR THR PROPER COMPLETION OF WORK ( 5.9.1 )
SUPPLY AND FIXING OF 450 X 450 X 12 THK ANCHOR PLATES WITH SUITABLE SIZE OF HOLD FAST, EMBEDDED IN CONCRETE OF COLUMN AND BEAM PORTIONS TO ATTACH THE 50 X 50 SQUARE PIPE SUPPORT ( 10.16.1 )
SUPPLY & FIXING OF 25 MM DIA & 750 LONG FOUNDATION BOLTS WITH 03 NOS NUTS TO BE FIXED DURING CONCRETING WITH THE HELP OF TAME PLATE COMPLETE WITH ALL MATERIAL & REQUIRED LABOUR. ( 10.16.1 )
SUPPLY & LAYING OF BRICK WORK 450 THICK WITH 1:4 CEMENT SAND MORTAR IN FOUNDATION AND PLINTH INCLUDING ALL MATERIAL & LABOUR REQUIRED FOR THE PROPER COMPLETION OF WORK.. ( 6.1.1 )
SUPPLY & LAYING OF BRICK WORK THICK WITH 1:4 CEMENT SAND MORTAR IN SUPERSTRUCTURE AND INCLUDING ALL MATERIAL & LABOUR REQUIRED FOR THE PROPER COMPLETION OF WORK.. ( 6.4.1 )
12 MM THICK PLASTER WITH 1:4 CEMENT SAND MORTAR ON WALLS INCLUDING THE SUPPLY OF ALL MATERIAL & LABOUR REQUIRED FOR THE PROPER & SMOOTH FINISHING OF WORK. ( 13.4.1 )
SUPPLY, CUTTING & BENDING OF REINFORCEMENT STEEL IN COLUMNS , FOOTINGS , FLOORS & SLABS ALL COMPLETE AT ITS PROPER LOCATION AS PER DRAWING ( 5.22.6 )
SUPPLY FEBRICATION & FIXING OF MS SQ PIPE 200 X 200 & 50 X 50 SIZE TO PREPARE STRUCTURAL COLUMNS & BEAMS ( 200 X 200 ) , TRUSS, PURLINS , MAIN GATES ETC INCLUDING SUPPLY OF ALL MATERIAL AND LABOUR REQUIRED FOR THE PROPER COMPLETION OF WORK. ( 10.16.1 )
SUPPLY, FEBRICATION & FIXING OF M.S PLATES ( 300 X 300 ) SIZE AT COLUMNS & BEAMS JUNCTION POINT INCLUDING ALL MATERIAL & LABOUR REQUIRED FOR THE PROPER COMPLETION OF WORK ( 10.16.1 )
SUPPLY OF PPGI / CGS SHEETS FOR COVERING ALL AROUND THE PORT STATION WALLS & ALSO FOR ROOF COVERING ABOVE TRUSS PORTION INCLUDING PROPER OVERLAPPING COMPLETE IN ALL RESPECT AS PER REQUIREMENTS ( 12.1.3 )
SUPPLY , FEBRICATION AND FIXING OF 12 MM THK M.S PLATES FOR MOVING PORTABLE COMPACTOR INSIDE THE PORT STATION ( 10.16.1 )
SUPPLY AND GROUTING OF CHEMICAL ANCHOR FASTENERS TO HOLD THE CHEQURED PLATES AT ITS PLACE AS PER DRAWING COMPLETE IN ALL RESPECTS
SUPPLY FEBRICATION AND FIXING OF GRATING ( 25 X 5 ) MS FLATS WITH GRATING SUPPORTS ( MS 50 X 50 X 5 ANGLE ) FOR LEACHATE DRAIN INSIDE PORT STATION ( 10.16.1 )
SUPPLY , FEBRICATION AND FIXING OF MS PLATE ( 2 M X 2 M ) COVER WITH ITS SUPPORT ( MS 50 X 50 X 5 ANGLE ) OVER MAIN HOLE OF PORT STATION ( 10.16.1 )
PAINTING ALL AROUND PORT STATION OVER PLASTERED SURFACE WITH 2 COATS OF WATER PROOF CEMENT PAINT FOR PROVIDING SMOOTH FINISH INCLUDING SUPPLY OF ALL MATERIAL AND LABOUR REQUIRED FOR PROPER COMPLETION OF WORK ( 13.44 )
ELECTRICAL WORK INSIDE THE PORT STATION / OFFICE / GUARD ROOM / TOILET ETC INCLUDING THE SUPPLY AND FIXING OF PANELS / MCB / CHANGEOVER / OPEN WIRING / PREPARING OF CIRCUITS / ALL LIGHTS & FANS ETC COMPLETE IN ALL RESPECT.
1.5 SQ MM WIRE ( POLYCAB FRLS )
2.5 SQ MM WIRE ( POLYCAB FRLS )
10 SQ MM COPPER CABLE
MCB BOX ( HAVELLS )
65 APM MCB ( HAVELLS )
MODULAR BOXES
16 AMP SWITCHES ( HAVELLS )
16 AMP SOCKETS ( HAVELLS )
FAN REGULATORS ( HAVELLS )
CONDUITS
POWER SWITCHES & SOCKET SET ( HAVELLS )
HALOGENS 1500 WATT
FANS ( CROMPTON GREAVES )
CHANGE OVERS WITH CUTOUTS
25 SQ MM GREEN CABLE FOR EARTHING
LABOUR ELECTRIFICATION WORK
PART-C, ESTIMATE FOR THE CONSTRUCTION OF TRANSFER STATION AT BADAYUN ROAD LOCATION ( BAREILLY NAGAR NIGAM ) AS PER DRAWING
EXCAVATION IN FOUNDATION IN ORDINARY SOIL IN FOUNDATION & SUPERSTRUCTUREAS MENTIONED IN THE DRAWING ( 2.1 )
SUPPLY & LAYING OF PLAIN CEMENT CONCRETE WITH 40 MM BRICK BALLAST OR STONE BALLAST AND COARSE SAND 1:4:8 IN FOUNDATION AND FLOORS COMPLETED INCLUDING ALL MATERIAL AND LABOUR. ( 4.1.8 )
SUPPLY & LAYING OF R.C.C IN M-20 GRADE ( 1:1.5:3 ) IN COLUMNS FOOTINGS & COLUMNS BELOW PLINTH ETC INCLUDING ALL MATERIALS & LABOUR WITH COMPLETE EXCLUDING CENTERING , SHUTTERING, & REINFORCEMENT STEEL ( 5.1.2 )
SUPPLY & LAYING OF R.C.C IN M-20 GRADE ( 1:1.5:3 ) IN COLUMNS, FLOORS ABOVE PLINTH LEVEL ETC INCLUDING ALL MATERIALS & LABOUR WITH COMPLETE SHUTTERING, CENTERING & BINDING OF STEEL BUT EXCLUDING THE SUPPLY CUTTING & BENDING OF STEEL ( 5.2.2 )
CENTERING & SHUTTERING WORK IN COLUMNS FOOTING INCLUDING ALL MATERIAL & LABOUR REQUIRED FOR THR PROPER COMPLETION OF WORK ( 5.9.1 )
CENTERING & SHUTTERING WORK IN FLOORS & SLABS INCLUDING ALL MATERIAL & LABOUR REQUIRED FOR THR PROPER COMPLETION OF WORK ( 5.9.3 )
CENTERING & SHUTTERING WORK IN COLUMNS INCLUDING ALL MATERIAL & LABOUR REQUIRED FOR THR PROPER COMPLETION OF WORK ( 5.9.6 )
SUPPLY AND FIXING OF 450 X 450 X 12 THK ANCHOR PLATES WITH SUITABLE SIZE OF HOLD FAST, EMBEDDED IN CONCRETE OF COLUMN AND BEAM PORTIONS TO ATTACH THE 50 X 50 SQUARE PIPE SUPPORT ( 10.16.1 )
SUPPLY & FIXING OF 25 MM DIA & 750 LONG FOUNDATION BOLTS WITH 03 NOS NUTS TO BE FIXED DURING CONCRETING WITH THE HELP OF TAME PLATE COMPLETE WITH ALL MATERIAL & REQUIRED LABOUR. ( 10.16.1 )
SUPPLY & LAYING OF BRICK WORK 450 THICK WITH 1:4 CEMENT SAND MORTAR IN FOUNDATION AND PLINTH INCLUDING ALL MATERIAL & LABOUR REQUIRED FOR THE PROPER COMPLETION OF WORK.. ( 6.1.1 )
SUPPLY & LAYING OF BRICK WORK THICK WITH 1:4 CEMENT SAND MORTAR IN SUPERSTRUCTURE AND INCLUDING ALL MATERIAL & LABOUR REQUIRED FOR THE PROPER COMPLETION OF WORK.. ( 6.4.1 )
12 MM THICK PLASTER WITH 1:4 CEMENT SAND MORTAR ON WALLS INCLUDING THE SUPPLY OF ALL MATERIAL & LABOUR REQUIRED FOR THE PROPER & SMOOTH FINISHING OF WORK. ( 13.4.1 )
SUPPLY, CUTTING & BENDING OF REINFORCEMENT STEEL IN COLUMNS , FOOTINGS , FLOORS & SLABS ALL COMPLETE AT ITS PROPER LOCATION AS PER DRAWING ( 5.22.6 )
SUPPLY FEBRICATION & FIXING OF MS SQ PIPE 50 X 50 SIZE TO PREPARE STRUCTURAL COLUMNS & BEAMS ( 200 X 200 ) , TRUSS, PURLINS , MAIN GATES ETC INCLUDING SUPPLY OF ALL MATERIAL AND LABOUR REQUIRED FOR THE PROPER COMPLETION OF WORK. ( 10.16.1 )
SUPPLY, FEBRICATION & FIXING OF M.S PLATES ( 300 X 300 ) SIZE AT COLUMNS & BEAMS JUNCTION POINT INCLUDING ALL MATERIAL & LABOUR REQUIRED FOR THE PROPER COMPLETION OF WORK ( 10.16.1 )
SUPPLY, FEBRICATION & FIXING OF M.S PLATES ( 200 X 200 ) SIZE AT FOR JOINING ALL 4 PIPES OF COLUMNS & BEAMS FROM OUTER SIDE INCLUDING ALL MATERIAL & LABOUR REQUIRED FOR THE PROPER COMPLETION OF WORK ( 10.16.1 )
SUPPLY OF PPGI / CGS SHEETS FOR COVERING ALL AROUND THE PORT STATION WALLS & ALSO FOR ROOF COVERING ABOVE TRUSS PORTION INCLUDING PROPER OVERLAPPING COMPLETE IN ALL RESPECT AS PER REQUIREMENTS ( 12.1.3 )
SUPPLY , FEBRICATION AND FIXING OF 12 MM THK M.S PLATES FOR MOVING PORTABLE COMPACTOR INSIDE THE PORT STATION ( 10.16.1 )
SUPPLY AND GROUTING OF CHEMICAL ANCHOR FASTENERS TO HOLD THE CHEQURED PLATES AT ITS PLACE AS PER DRAWING COMPLETE IN ALL RESPECTS
SUPPLY FEBRICATION AND FIXING OF GRATING ( 25 X 5 ) MS FLATS WITH GRATING SUPPORTS ( MS 50 X 50 X 5 ANGLE ) FOR LEACHATE DRAIN INSIDE PORT STATION ( 10.16.1 )
SUPPLY , FEBRICATION AND FIXING OF MS PLATE ( 2 M X 2 M ) COVER WITH ITS SUPPORT ( MS 50 X 50 X 5 ANGLE ) OVER MAIN HOLE OF PORT STATION ( 10.16.1 )
PAINTING ALL AROUND PORT STATION OVER PLASTERED SURFACE WITH 2 COATS OF WATER PROOF CEMENT PAINT FOR PROVIDING SMOOTH FINISH INCLUDING SUPPLY OF ALL MATERIAL AND LABOUR REQUIRED FOR PROPER COMPLETION OF WORK ( 13.44 )
ELECTRICAL WORK INSIDE THE PORT STATION / OFFICE / GUARD ROOM / TOILET ETC INCLUDING THE SUPPLY AND FIXING OF PANELS / MCB / CHANGEOVER / OPEN WIRING / PREPARING OF CIRCUITS / ALL LIGHTS & FANS ETC COMPLETE IN ALL RESPECT.
1.5 SQ MM WIRE ( POLYCAB FRLS )
2.5 SQ MM WIRE ( POLYCAB FRLS )
10 SQ MM COPPER CABLE
MCB BOX ( HAVELLS )
65 APM MCB ( HAVELLS )
MODULAR BOXES
16 AMP SWITCHES ( HAVELLS )
16 AMP SOCKETS ( HAVELLS )
FAN REGULATORS ( HAVELLS )
CONDUITS
POWER SWITCHES & SOCKET SET ( HAVELLS )
LED LIGHTS & HOLDERS ( HAVELLS )
HALOGENS 1500 WATT
FANS ( CROMPTON GREAVES )
CHANGE OVERS WITH CUTOUTS
25 SQ MM GREEN CABLE FOR EARTHING
LABOUR ELECTRIFICATION WORK
PART-D, ESTIMATE FOR THE CONSTRUCTION OF PORT STATION AT BADAYUN ROAD LOCATION ( BAREILLY NAGAR NIGAM ) AS PER DRAWING
EXCAVATION IN FOUNDATION IN ORDINARY SOIL IN FOUNDATION & SUPERSTRUCTUREAS MENTIONED IN THE DRAWING ( 2.1 )
SUPPLY & LAYING OF PLAIN CEMENT CONCRETE WITH 40 MM BRICK BALLAST OR STONE BALLAST AND COARSE SAND 1:4:8 IN FOUNDATION AND FLOORS COMPLETED INCLUDING ALL MATERIAL AND LABOUR. ( 4.1.8 )
SUPPLY & LAYING OF R.C.C IN M-20 GRADE ( 1:1.5:3 ) IN COLUMNS FOOTINGS & COLUMNS BELOW PLINTH ETC INCLUDING ALL MATERIALS & LABOUR WITH COMPLETE EXCLUDING CENTERING , SHUTTERING, & REINFORCEMENT STEEL ( 5.1.2 )
SUPPLY & LAYING OF R.C.C IN M-20 GRADE ( 1:1.5:3 ) IN COLUMNS, FLOORS ABOVE PLINTH LEVEL ETC INCLUDING ALL MATERIALS & LABOUR WITH COMPLETE SHUTTERING, CENTERING & BINDING OF STEEL BUT EXCLUDING THE SUPPLY CUTTING & BENDING OF STEEL ( 5.2.2 )
CENTERING & SHUTTERING WORK IN COLUMNS FOOTING INCLUDING ALL MATERIAL & LABOUR REQUIRED FOR THR PROPER COMPLETION OF WORK ( 5.9.1 )
CENTERING & SHUTTERING WORK IN FLOORS & SLABS INCLUDING ALL MATERIAL & LABOUR REQUIRED FOR THR PROPER COMPLETION OF WORK ( 5.9.3 )
CENTERING & SHUTTERING WORK IN COLUMNS INCLUDING ALL MATERIAL & LABOUR REQUIRED FOR THR PROPER COMPLETION OF WORK ( 5.9.6 )
SUPPLY AND FIXING OF 450 X 450 X 12 THK ANCHOR PLATES WITH SUITABLE SIZE OF HOLD FAST, EMBEDDED IN CONCRETE OF COLUMN AND BEAM PORTIONS TO ATTACH THE 50 X 50 SQUARE PIPE SUPPORT ( 10.16.1 )
SUPPLY & FIXING OF 25 MM DIA & 750 LONG FOUNDATION BOLTS WITH 03 NOS NUTS TO BE FIXED DURING CONCRETING WITH THE HELP OF TAME PLATE COMPLETE WITH ALL MATERIAL & REQUIRED LABOUR. ( 10.16.1 )
SUPPLY & LAYING OF BRICK WORK 450 THICK WITH 1:4 CEMENT SAND MORTAR IN FOUNDATION AND PLINTH INCLUDING ALL MATERIAL & LABOUR REQUIRED FOR THE PROPER COMPLETION OF WORK.. ( 6.1.1 )
SUPPLY & LAYING OF BRICK WORK THICK WITH 1:4 CEMENT SAND MORTAR IN SUPERSTRUCTURE AND INCLUDING ALL MATERIAL & LABOUR REQUIRED FOR THE PROPER COMPLETION OF WORK.. ( 6.4.1 )
12 MM THICK PLASTER WITH 1:4 CEMENT SAND MORTAR ON WALLS INCLUDING THE SUPPLY OF ALL MATERIAL & LABOUR REQUIRED FOR THE PROPER & SMOOTH FINISHING OF WORK. ( 13.4.1 )
SUPPLY, CUTTING & BENDING OF REINFORCEMENT STEEL IN COLUMNS , FOOTINGS , FLOORS & SLABS ALL COMPLETE AT ITS PROPER LOCATION AS PER DRAWING ( 5.22.6 )
SUPPLY FEBRICATION & FIXING OF MS SQ PIPE 50 X 50 SIZE TO PREPARE STRUCTURAL COLUMNS & BEAMS ( 200 X 200 ) , TRUSS, PURLINS , MAIN GATES ETC INCLUDING SUPPLY OF ALL MATERIAL AND LABOUR REQUIRED FOR THE PROPER COMPLETION OF WORK. ( 10.16.1 )
SUPPLY, FEBRICATION & FIXING OF M.S PLATES ( 300 X 300 ) SIZE AT COLUMNS & BEAMS JUNCTION POINT INCLUDING ALL MATERIAL & LABOUR REQUIRED FOR THE PROPER COMPLETION OF WORK ( 10.16.1 )
SUPPLY, FEBRICATION & FIXING OF M.S PLATES ( 200 X 200 ) SIZE AT FOR JOINING ALL 4 PIPES OF COLUMNS & BEAMS FROM OUTER SIDE INCLUDING ALL MATERIAL & LABOUR REQUIRED FOR THE PROPER COMPLETION OF WORK ( 10.16.1 )
SUPPLY OF PPGI / CGS SHEETS FOR COVERING ALL AROUND THE PORT STATION WALLS & ALSO FOR ROOF COVERING ABOVE TRUSS PORTION INCLUDING PROPER OVERLAPPING COMPLETE IN ALL RESPECT AS PER REQUIREMENTS ( 12.1.3 )
SUPPLY , FEBRICATION AND FIXING OF 12 MM THK M.S PLATES FOR MOVING PORTABLE COMPACTOR INSIDE THE PORT STATION ( 10.16.1 )
SUPPLY AND GROUTING OF CHEMICAL ANCHOR FASTENERS TO HOLD THE CHEQURED PLATES AT ITS PLACE AS PER DRAWING COMPLETE IN ALL RESPECTS
SUPPLY FEBRICATION AND FIXING OF GRATING ( 25 X 5 ) MS FLATS WITH GRATING SUPPORTS ( MS 50 X 50 X 5 ANGLE ) FOR LEACHATE DRAIN INSIDE PORT STATION ( 10.16.1 )
SUPPLY , FEBRICATION AND FIXING OF MS PLATE ( 2 M X 2 M ) COVER WITH ITS SUPPORT ( MS 50 X 50 X 5 ANGLE ) OVER MAIN HOLE OF PORT STATION ( 10.16.1 )
PAINTING ALL AROUND PORT STATION OVER PLASTERED SURFACE WITH 2 COATS OF WATER PROOF CEMENT PAINT FOR PROVIDING SMOOTH FINISH INCLUDING SUPPLY OF ALL MATERIAL AND LABOUR REQUIRED FOR PROPER COMPLETION OF WORK ( 13.44 )
ELECTRICAL WORK INSIDE THE PORT STATION / OFFICE / GUARD ROOM / TOILET ETC INCLUDING THE SUPPLY AND FIXING OF PANELS / MCB / CHANGEOVER / OPEN WIRING / PREPARING OF CIRCUITS / ALL LIGHTS & FANS ETC COMPLETE IN ALL RESPECT.
1.5 SQ MM WIRE ( POLYCAB FRLS )
2.5 SQ MM WIRE ( POLYCAB FRLS )
10 SQ MM COPPER CABLE
MCB BOX ( HAVELLS )
65 APM MCB ( HAVELLS )
MODULAR BOXES
16 AMP SWITCHES ( HAVELLS )
16 AMP SOCKETS ( HAVELLS )
FAN REGULATORS ( HAVELLS )
CONDUITS
POWER SWITCHES & SOCKET SET ( HAVELLS )
LED LIGHTS & HOLDERS ( HAVELLS )
HALOGENS 1500 WATT
FANS ( CROMPTON GREAVES )
CHANGE OVERS WITH CUTOUTS
25 SQ MM GREEN CABLE FOR EARTHING
LABOUR ELECTRIFICATION WORK
10.5 CUM PORABLE COMPACTOR
HOOK LOADER
DETAILS OF CAPEX & OPEX AGAINST TRANSFER STATIONS FOR BAREILLY NAGAR NIGAM OPEX ( OPERATIONAL EXPENSES ) APPROX. SOLID WASTE IN AREA ( MT )
DELA PEER TRANSFER STATION
PILIBHIT BYPASS NEAR ROHILKHAND UNIVERSITY
BADAYUN ROAD - 1 TRANSFER STATION
BADAYUN ROAD - 2 TRANSFER STATION
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 24.41 MB
BOQ_2054060.xls
BOQ • 0.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .