| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹5.9 LAccepted-AOC JL 103 SUTAHATA SRI KRISHNAPUR HALDIA EAST MEDINIPUR WEST BENGAL 721635 | MEDINIPUR EAST | WEST BENGAL | 721635 | L-1 | Accepted-AOC Contract placed on L-1 bidder after TEC recommendation and approval of competent authority | |
| 2 | L-2₹6.4 L+₹57,320 (9.79%)Rejected-Finance 8 9 BENTINCK STREET KOLKATA 700001 | KOLKATA | KOLKATA | WEST BENGAL | 700001 | L-2 | Rejected-Finance Quoted L-2 value | |
| 3 | Rejected-Technical 361 PRANTICK PALLY 45 361 BOSE PUKUR ROAD KASBA KOLKATA WEST BENGAL 700107 | KOLKATA | WEST BENGAL | 700107 | - | Rejected-Technical Techno-Commercially not qualified |
| Sl No | Description | Qty | Unit | R V BRIGGS AND COMPANY PVT LTD L2 | WEST BENGAL WASTE MANAGEMENT LIMITED L1 |
|---|---|---|---|---|---|
| 1.00Rate Contract for Environmental Monitoring | |||||
| 1.01 | Collection of sample for emission
Through stack/ stacks of the operating unit/units(as per availability
irrespective of the date for the particular month)of the power
station conducting analysis and submitting report etc. | 120 | Number | 1,650 ₹1,98,000 | 1,193 ₹1,43,160 Lowest |
| 1.02 | Collection of sample for ambient air
Collection of sample for ambient air From identified location
prevailing at the power station conducting analyzing &submitting
report containing relevant parameters including Pb&Co etc. all as
per guideline/stipulation of MOEF/WBPCB. No of sampling may
be different as per requirement of the
plant. | 72 | Number | 3,100 ₹2,23,200 | 2,800 ₹2,01,600 Lowest |
| 1.03 | Collection of sample of Dry ash Collection of sample of Dryash from Silo, analyzing &submitting
report all as per guideline/stipulation of MOEF/GOI/WBPCB/CEA
showing different parameters e.g geotechnical & engineering
properties, shear properties &Consolidation properties along with
physical &chemical properties. | 2 | Number | 2,700 ₹5,400 Lowest | 5,500 ₹11,000 |
| 1.04 | Effluent water sample from two Out fall locations & analyzing & submitting report as per
guideline/stipulation of MOEF/WBPCB. No of sampling maybe
different as per requirement of the plant | 48 | Number | 1,350 ₹64,800 Lowest | 1,800 ₹86,400 |
| 1.05 | Monitoring of Noise level at locations
locations not exceeding four(4)in number Analyzing, submitting
report as per Guidelines/stipulation of MOEF/WBPCB | 24 | Number | 400 ₹9,600 | 230 ₹5,520 Lowest |
| 1.06 | Collection & conducting analysis of
of Ground water samples during pre Monsoon & post Monsoon
period as may be collected from dug well/bore well/Tube well at
upstream &downstream of existing &proposed ash pond
andaround5km radius of Ash Pond. parameters including, pH,
TSS, Fluride, iron, nickel, arsenic, Hg, Pb, Cu, Zn, Cadmium,
Chromium compounds,sulphateasSO4,Nitrate as NO3. | 4 | Number | 2,550 ₹10,200 | 1,700 ₹6,800 Lowest |
| 1.07 | Collection & conducting bacteriological
(Total Coliform, E-Coli, pH, Dissolved
O2,BOD(5Daysat20DegC)Arsenic).Analysis of drinking/portable
water samples collected from plant & Township & submitting
report as per guidelines/stipulation of MOEF/WBPCB. | 16 | Number | 1,200 ₹19,200 Lowest | 2,300 ₹36,800 |
| 1.08 | Collection of samples for analysis
analysis Liquid effluent water from Boiler Blow down at out fall
location & submitting report etc. All as per guidelines/stipulation
of MOEF/GOI/WBPCB/CEA .Parameters to be tested are : oil&
grease, cu, Fe& TSS(all in mg/ltr). | 24 | Number | 900 ₹21,600 | 700 ₹16,800 Lowest |
| 1.09 | Collection of samples for analysising Liquid effluent water from ash pond &Plant effluents including
canteen and submitting report etc. All as per guidelines/stipulation
of MOEF/GOI/WBPCB/CEA. Parameters to be tested are oil
&grease, pH, TSS(all in mg/ltr),BOD(3Dayat27DegC),COD,
Arsenic | 24 | Number | 900 ₹21,600 Lowest | 1,100 ₹26,400 |
Tender Value
₹6.5 L
EMD Value
₹12,929
Closing Date
16 Feb 2026, 4:00 pmClosed
The General Manager STPS
Admin Building, STPS,Purulia,W.B., 723146
Rate Contract for Environmental Monitoring and submission of Statement for 2 X 250 MW STPS of WBPDCL for Two years
2026_WBPDC_993662_1
WBPDCL/STPS/NIT/E4297/25-26
Open Tender
Support/Maintenance Service
Item Rate
730 days
Admin. bldg, STPS, W.B.
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹12,929
Yes
1 Aug 2026
29 Jan 2026
18 Feb 2026
29 Jan 2026
16 Feb 2026
30 Jan 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Rate Contract for Environmental Monitoring | |||||
| 1.01 | Collection of sample for emission
Through stack/ stacks of the operating unit/units(as per availability
irrespective of the date for the particular month)of the power
station conducting analysis and submitting report etc. | - | Number | - | - |
| 1.02 | Collection of sample for ambient air
Collection of sample for ambient air From identified location
prevailing at the power station conducting analyzing &submitting
report containing relevant parameters including Pb&Co etc. all as
per guideline/stipulation of MOEF/WBPCB. No of sampling may
be different as per requirement of the
plant. | - | Number | - | - |
| 1.03 | Collection of sample of Dry ash Collection of sample of Dryash from Silo, analyzing &submitting
report all as per guideline/stipulation of MOEF/GOI/WBPCB/CEA
showing different parameters e.g geotechnical & engineering
properties, shear properties &Consolidation properties along with
physical &chemical properties. | - | Number | - | - |
| 1.04 | Effluent water sample from two Out fall locations & analyzing & submitting report as per
guideline/stipulation of MOEF/WBPCB. No of sampling maybe
different as per requirement of the plant | - | Number | - | - |
| 1.05 | Monitoring of Noise level at locations
locations not exceeding four(4)in number Analyzing, submitting
report as per Guidelines/stipulation of MOEF/WBPCB | - | Number | - | - |
| 1.06 | Collection & conducting analysis of
of Ground water samples during pre Monsoon & post Monsoon
period as may be collected from dug well/bore well/Tube well at
upstream &downstream of existing &proposed ash pond
andaround5km radius of Ash Pond. parameters including, pH,
TSS, Fluride, iron, nickel, arsenic, Hg, Pb, Cu, Zn, Cadmium,
Chromium compounds,sulphateasSO4,Nitrate as NO3. | - | Number | - | - |
| 1.07 | Collection & conducting bacteriological
(Total Coliform, E-Coli, pH, Dissolved
O2,BOD(5Daysat20DegC)Arsenic).Analysis of drinking/portable
water samples collected from plant & Township & submitting
report as per guidelines/stipulation of MOEF/WBPCB. | - | Number | - | - |
| 1.08 | Collection of samples for analysis
analysis Liquid effluent water from Boiler Blow down at out fall
location & submitting report etc. All as per guidelines/stipulation
of MOEF/GOI/WBPCB/CEA .Parameters to be tested are : oil&
grease, cu, Fe& TSS(all in mg/ltr). | - | Number | - | - |
| 1.09 | Collection of samples for analysising Liquid effluent water from ash pond &Plant effluents including
canteen and submitting report etc. All as per guidelines/stipulation
of MOEF/GOI/WBPCB/CEA. Parameters to be tested are oil
&grease, pH, TSS(all in mg/ltr),BOD(3Dayat27DegC),COD,
Arsenic | - | Number | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.98 MB
BOQ_2430714.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .