Tender Value
₹2.0 Cr
EMD Value
₹3.8 L
Closing Date
30 Dec 2022, 5:00 pmClosed
Superitending Engineer
SE UTTARAKHAND JAL SANSTHAN CIRCLE-GOPESHWAR
Supply, Laying and Jointing of G.I. Pipe line (m), FHTC work and other appurtenant works of Phase II Rangchaura Water supply scheme in block Gairsain of District chamoli under Jal jeewan mission FY 2022-23
2022_UKJS_52958_1
443/e-tender notice/2022-23/16-11-2022
Open Tender
Civil Works - Water Works
Item Wise
150 days
Gopeshwar
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,720
Executive Engineer UJS
₹3.8 L
Gopeshwar
29 Aug 2023
17 Dec 2022
31 Dec 2022
17 Dec 2022
30 Dec 2022
19 Dec 2022
19 Dec 2022
Supply, Laying & Jointing of G.I. Pipe line (m), FHTC work and other appurtenant works of Phase II Rangchaura Water supply scheme in block Gairsain of District chamoli under Jal jeewan mission FY 2022-23
Construction of 6.00 m vide BFG at sirani Gadhera including constrution of intake chamber and supply of all materials, labour, T&P etc. complete
Construction of Steel intake chamber having (0.60mx0.60m) size at tapping point for collection of water including supply of all materials, labour
Construction of R.C.C. roughening filter cum screening chamber including near by tapping point of following sources in different zones under existing water supply scheme for collection of water including supply of all materials,labour, T&P etc. complete.
Supply of all materials, labour, T&P etc and construction of R.C.C. Sump / CWR of following capacities (KL) with M.S. ladder outside & inside of the tank, M.S.M.H. cover with locking arrangement, supply and fixing of chlorinator, cowl,outlet, over flow and wash out pipes with necessary sluice valves, pipe pieces (including cost of materials) flooring 0.60 M wide apron, painting with approved water proofing (apex) / enamal paint, testing, filling water for testing purpose etc. including supply of vertical pipes and specials, assuming bearing capacity as 8MT/M2 . 3.00 KL
supply of FRP coated MS bucket type chlorinator of 25 ltr capacity with chlorination arrangements
Providing of all materials, carting from site store to site of work, laying & jointing of G.I. Medium screwed pipes (including supply of all jointing materials like specials, white lead, hemp and oil etc.) in trenches with its cutting, threading and testing of pipe line etc complete.(GI medium quality (As per marked G.I. Pipe conforming to is 1239)) 20 mm dia
25 mm dia
32 mm dia
50 mm dia
Dismantling of Follwing dia screwed and socketed G.I. Pipe , Spacials and fittings including taking out of dismantled GI pipes and specials from trenches and stacking them properly withen 50.00 M but excluding the cost of earth work. 40mm dia
50mm dia
25 mm dia
32 mm dia
40 mm dia
50 mm dia
(b) High head cast iron air valves 15 mm dia (T.P. 10 kg/Sqcm)
Excavation of earth for pipe line in following strata lift upto 1.5m. Lead upto 30m. Including refilling,watering,ramming of excavated earth into the trenches and removal of surplus earth upto adistance of 60m. Fromtrenches including supply of labour,T&P.etc complete.Assuming that 60% pipe line is laid in trenches ,it is estimated that 75% exavation will be in soil mixed with shingle,bajri&boulders and rest 25%will be in soft rock (a) Soil mixed with boulder and bajri
(b) Medium Rock/Soft Rock
Relaying of dismantled G.I. Pipe in true alignment in trenches including supply of all materials , labour , T&P etc. Complete 40mm dia
50mm dia
Provide all materials, labour, T&P and construct following chambers as per type designs complete (a) Wheel valve chamber (0.60 X 0.60)
(b) Wheel valve chamber (0.90 X 0.90)
Supply of all materials, labours, T&P etc and making ferrule connection to provide FHTC to the consumers under JJM complete (assuming average 30.00 m length for a single connection (As per household survey )
RR Stone Masonary with 1:6 cement and sand mortar along the pipe line for proper completion of work
RR Stone Masonary laid in dry for pipe line for proper completion of work
Cartage of Material
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .