Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.5 LAccepted-AOC | 1 | Accepted-AOC Single lowest bidder |
Tender Value
₹3.7 L
EMD Value
₹7,301
Closing Date
5 Dec 2019, 12:00 pmClosed
Executive Engineer, Feeder Canal Division
Farakka Barrage Project, P.O. Farakka Barrage, Dist. Murshidabad, West Bengal, PIN 742212
As per bid document
2019_FBPF_522983_1
GM/FBP-20 of 2019-20
Open Tender
Survey
Item Rate
20 days
Farakka, Dist. Murshidabad
As per bid document
2 documents required · 2 mandatory
₹500
Sr. Accounts Officer, Pay and Accounts Office, FBP
₹7,301
7 Jan 2020
29 Nov 2019
7 Dec 2019
29 Nov 2019
5 Dec 2019
29 Nov 2019
Amount
Longitudinal river survey and preparation of maps in requisite scales to supply them in both soft and hard formats with four copies complete, including cost of manpower, labour, surveying instruments, camp equipage, transportation, etc, as per directions of engineer-in-charge. By boat in moderate depth
Up to10 km
Beyond 10 km
Hydrographic survey to depict river/reservoir bed profi le andpreparation of maps in requisite scales to supply them in both soft and hard formats with four copies complete, including cost of manpower, labour, surveying instruments, camp equipage, transportation, etc, as per directions of engineer-in-charge At 5 m grid interval
Printing of cross sections in A1 size sheet (10 nos. cross section in one sheet) (Total number of cross section is 390 nos. consider as single unit.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .