Tender Value
Refer Docs
EMD Value
₹7.6 L
Closing Date
17 Sept 2026, 2:00 pm5d left
GENERAL MANAGER, BHARTIYA COOPERATIVE GRAMIN VIKAS
GENERAL MANAGER, BHARTIYA COOPERATIVE GRAMIN VIKAS EVAM NIRMAN LIMITED UTTARAKHAND
Establishment open gyms in various districts at difference 08 places in Uttarakhand
2026_BCGN1_99706_1
793/BCGVENL/tender/2026-27 Dated 02/09/2026
Open Tender
Miscellaneous Services
Percentage
180 days
Almora
Please refer Tender documents.
3 documents required · 3 mandatory
₹11,800
Bhartiya Co-operative Gramin Vikas Evem Nirman Lim
₹7.6 L
3 Sept 2026
3 Sept 2026
18 Sept 2026
3 Sept 2026
17 Sept 2026
3 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 15 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | 442.4 | cum | 260.3 | ₹1,15,156.72 |
| 2 | FILLING IN FOUNDATION | - | - | - | - |
| 3 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 309.68 | cum | 196 | ₹60,697.28 |
| 4 | FLOOR FILLING | - | - | - | - |
| 5 | Excavating, supplying, stacking and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in foundation trenches, plinth, sides of foundation | 445.92 | cum | 700.5 | ₹3,12,366.96 |
| 6 | P.C.C | - | - | - | - |
| 7 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1) Cement: 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 218.88 | cum | 6,812 | ₹14,91,010.56 |
| 8 | REINFORCED CEMENT CONCRETE | - | - | - | - |
| 9 | Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge."(Note:-Cement content considered in this item is @330 | - | - | - | - |
| 10 | ALL WORK UPTO PILNTH LEVEL | 59.12 | cum | 9,504.75 | ₹5,61,920.82 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
BOQ_117570.xls
BOQ • 0.35 MB
SBDOPENGYM08DIFFPLACESUKHAND.pdf
Tender Documents • 1.13 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .