Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance PLOT 131 BLOCK D AUTONAGAR VISAKHAPATNAM ANDHRA PRADESH 530012 | VISAKHAPATANAM | ANDHRA PRADESH | 530012 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance 34 SANJAY BUILDING NO 6 ANDHERI KURLA ROAD ANDHERI EAST MUMBAI MAHARASHTRA 400059 | MUMBAI SUBURBAN | MAHARASHTRA | 400059 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
Closing Date
12 May 2022, 10:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
ASD
Naval Dockyard, Visakhapatnam. 530014
REPAIRS AND REFURBISHMENT OF 04 in NOS, GT LUB OIL COOLERS IN SHIP
2022_NAVY_521057_1
COM/OFF/GTR/21-22/1110
Limited
Marine Services
Turn-key
180 days
Naval Dockyard, Visakhapatnam.
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
Exempted
13 May 2022
29 Apr 2022
13 May 2022
29 Apr 2022
12 May 2022
29 Apr 2022
29 Apr 2022 - 12 May 2022
180 days
Repair and refurbishment of 04 in nos, GT Lub Oil Coolers of Ins Mysore.Dismantling of Lub Oil Coolers.Assessment of general condition, visual cracks etc.At acceptance by the Firm in the Yard premises from the User Manager.
Repair and refurbishment of 04 in nos, GT Lub Oil Coolers of Ins Mysore.Preliminary external and internal cleaning/ degreasing of Lub Oil Coolers tube stack..Assessment of internal condition of coolers to ascertain actual scope of work of repair/renewal/ refurbishment, in mutual agreement between User Manager, Firm & QC reps. In the Firm's premises, on dismantling of the coolers, actual SoW to be determined
Repair and refurbishment of 04 in nos, GT Lub Oil Coolers of Ins Mysore.Preliminary external and internal cleaning/ degreasing of end covers.Assessment of internal condition of coolers to ascertain actual scope of work of repair/renewal/ refurbishment, in mutual agreement between User Manager, Firm & QC reps. In the Firm's premises, on dismantling of the coolers, actual SoW to be determined
Repair and refurbishment of 04 in nos, GT Lub Oil Coolers of Ins Mysore.Repairs/refurbishment of tube plates of the stack.(a) Random sample(s) of material shall be taken and material test certificate provided for clearance, from NABL accredited laboratory (mutually agreeable to User Dept./QC and Firm). The tube plates shall be tested by NDT for cracks & defects before commencement of build-up of the tube stack. (b)Both tube plates shall be perfectly parallel to each other. Holes to be drilled and smoothened as per size, distribution and pitch. (c)Renew Cooler Tubes using correct jigs and fixtures. New tubes to be fitted to Tube Plates by flaring. Pipe ends post flaring and sealing should project over the tube plate surface by 0.4 to 0.7 mm. Renew baffle plates, tube guides and tube stack frame if excessively thinned/ corroded/ deformed. (d)Old baffle plates, tube guides and stack frame can be re-used it not damaged/ corroded, in mutual agreement with User Manager/QC Dept.
Repair and refurbishment of 04 in nos, GT Lub Oil Coolers of Ins Mysore.Repairs/Refurbishment of cooler tubes.Renew Cooler Tubes using correct jigs and fixtures. New tubes to be fitted to Tube Plates by flaring. Pipe ends post flaring and sealing should project over the tube plate surface by 0.4 to 0.7 mm. Renew baffle plates, tube guides and tube stack frame if excessively thinned/ corroded/ deformed. (b)Old baffle plates, tube guides and stack frame can be re-used it not damaged/ corroded, in mutual agreement with User Manager/QC Dept
Repair and refurbishment of 04 in nos, GT Lub Oil Coolers of Ins Mysore.Renewal of baffle plates.(a)Renewed Cooler End-Covers are to be fabricated from pure Cu sheets. Metallic pressure rings/ Spacer Rings of End Covers to be renewed if damaged/corroded/ deformed. (b)Each baffle plate shall be tested individually by NDT for cracks (both surface and sub-surface) and blow-holes etc. Type of NDT used (viz. X-ray, ultrasound & DPI) shall be mutually agreed between User Manager, QC and Firm, and executed at Firm's expenses through Govt. approved competent certifying firms. QC Dept. of the Yard may seek X-ray/Ultrasound inspection reports or indicate additional X-ray/Ultrasound checks, where felt essential, at no extra cost.
Repair and refurbishment of 04 in nos, GT Lub Oil Coolers of Ins Mysore.Assembly of coolers.(a)Tube Stack to be carefully assembled into the Cooler Body; all oil and water side "O" rings to be renewed. All fasteners used to fasten End-Covers to Cooler Body should be of SS-304. Spacer rings to be fully renewed with appropriate sized holes, if deformed, corroded or damaged. (b)Adequate insulation protection to be provided between Copper based End Covers and Ferrous-pressure/ Spacer Rings, while fastening End Covers.
Repair and refurbishment of 04 in nos, GT Lub Oil Coolers of Ins Mysore.Pressure testing of Lub Oil Cooler.(a)Oil and sea water sides. Fresh and sediment-free water shall be used for pressure testing. Openings on Cooler End Covers shall be appropriately plugged or blanked. (b)Test and holding parameters as per encl. to SoW. Plugging of defective tubes at the time of complete cooler refurbishment is NOT ACCEPTABLE (c)Spare Tube Stacks can be tested using the body of the supplied Coolers. Alternatively, matching end caps can be fabricated to pressure test the Tube Stack Assembly alone. Tube Stacks to be carefully dismantled off the Cooler Bodies, without damage to the "O" rings.
Repair and refurbishment of 04 in nos, GT Lub Oil Coolers of Ins Mysore.Preservation of Lub Oil Coolers.(a)Post the pressure testing, water to be drained out, insides blown dry using hot air and all unaccounted openings plugged/ blanked in the presence of reps of User Manager. (b) Coolers to be covered and securely packed in wooden crates for transportation. (c)Anodic zinc protectors to be fitted to the relevant plugs of each of the End Covers prior packing and delivery.
Repair and refurbishment of 04 in nos, GT Lub Oil Coolers of Ins Mysore.Coolers packing and transportation.Coolers to be covered and securely packed in wooden crates for transportation
Repair and refurbishment of 04 in nos, GT Lub Oil Coolers of Ins Mysore.Material testing of Lub Oil Coolers.Random sample(s) of material shall be taken and material test certificate provided for clearance, from NABL accredited laboratory (mutually agreeable to User Dept./QC and Firm).
MSK HEAT TRANSFER PVT.LTD
Green Biosys
GRAND ALCOBRAZE INDIA LLP
H and H Precision Private Limited
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .