Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹4.1 CrAccepted-AOC 16 12A SWAMIJI ROAD NEAR SABUJ SANGHA KOLKATA WEST BENGAL 700060 | KOLKATA | WEST BENGAL | 700060 | ₹4.1 Cr | L-1 | Accepted-AOC Contract placed on L-1 bidder after TC recommendation and approval of competent authority |
| 2 | L-2₹4.2 Cr+₹1.6 L (0.40%)Rejected-Finance A 1 1 BKTPP CHP AREA BKTPP BIRBHUM 731104 | BIRBHUM | BIRBHUM | WEST BENGAL | 731104 | ₹4.2 Cr+₹1.6 L (0.40%) | L-2 | Rejected-Finance Quoted L-2 value |
| Sl No | Description | Qty | Unit | PROJECT CONSTRUCTION SERVICES L2 | TECHNO ENGINEERING L1 |
|---|---|---|---|---|---|
| 1.00Operation of entire Ash Handling Plant including Electrical, ZLD and Mill Rejection system of two nos. 250 MW unit at STPS | |||||
| 1.01 | Maximum possible expenditure for Wages, benefits, O.T.(considering 15hrs/head/month) & night allowances for 47 Nos.Agreemental B & Non-agreemental workers considering wage rate as on 01.01.2025 and charge for 30 Nos. company supplied workers consisting of 29 nos Operators and 01 No. supervisor | 24 | Month | 16,04,729 ₹3,85,13,496 | 16,00,000 ₹3,84,00,000 Lowest |
| 1.02 | Profit & Overhead charge on Wages of 77 Nos. manpower | 24 | Month | 80,341 ₹19,28,184 | 75,000 ₹18,00,000 Lowest |
| 1.03 | Charges for Safety, PPE for two years | 1 | Lot | 1,25,500 ₹1,25,500 | 95,000 ₹95,000 Lowest |
| 1.04 | Cost of consumables, Tools,tackles, charge for Vehicle for conveying the operators/ workers | 24 | Month | 43,513 ₹10,44,312 Lowest | 48,000 ₹11,52,000 |
Tender Value
₹4.4 Cr
EMD Value
₹8.9 L
Closing Date
26 Feb 2026, 4:00 pmClosed
The General Manager STPS
Admin Building, STPS,Purulia,W.B., 723146
Two years job contract for Operation of entire Ash Handling Plant including Electrical, Zero Liquid Discharge and Mill Rejection system of two nos. 250 MW unit at STPS
2026_WBPDC_990248_1
WBPDCL/STPS/NIT/E4285/25-26
Open Tender
Support/Maintenance Service
Item Rate
730 days
Admin. bldg, STPS, W.B.
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹8.9 L
Yes
M and C Dept. STPS, Admin Building, STPS,Purulia
22 Mar 2026
24 Jan 2026
28 Feb 2026
24 Jan 2026
26 Feb 2026
10 Feb 2026
9 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Operation of entire Ash Handling Plant including Electrical, ZLD and Mill Rejection system of two nos. 250 MW unit at STPS | |||||
| 1.01 | Maximum possible expenditure for Wages, benefits, O.T.(considering 15hrs/head/month) & night allowances for 47 Nos.Agreemental B & Non-agreemental workers considering wage rate as on 01.01.2025 and charge for 30 Nos. company supplied workers consisting of 29 nos Operators and 01 No. supervisor | - | Month | - | - |
| 1.02 | Profit & Overhead charge on Wages of 77 Nos. manpower | - | Month | - | - |
| 1.03 | Charges for Safety, PPE for two years | - | Lot | - | - |
| 1.04 | Cost of consumables, Tools,tackles, charge for Vehicle for conveying the operators/ workers | - | Month | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.14 MB
BOQ_2420322.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .