Loading…
Loading…
Ref. No.
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹61,000
Closing Date
19 Feb 2026, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Insha Khan
RHQ-SR1, Secunderabad
WC 4546 Annual Maintenance Contract Package II at Vemagiri Substation for a period of Two years
SR1/NT/W-CIVIL/DOM/B00/26/00767
Open
Civil - All
Works
Vemagiri
This bid is reserved for Women bidders only
₹2,000
₹61,000
4 Feb 2026
4 Feb 2026
19 Feb 2026
4 Feb 2026
19 Feb 2026
4 Feb 2026
Annual Maintenance Contract (Package –II) at 765/400 KV, Vemagiri S/S for a period of Two years
Specification No: SR-I/C&M/WC-4546/2026/ Rfx no.: 5002005046 (SR1/NT/W-CIVIL/DOM/B00/26/00767)
Enter the details of the bidder below:
THIS BID IS RESERVED FOR WOMEN ENTREPRENEURS
Specify type of Bidder Woman Bidder
Name of the Bidder TRUE
Address of Registered Office TRUE
Mobile no. +91 TRUE
Printed Name TRUE
Designation TRUE
Place TRUE False
#REF! ATTACHMENT-10
Name : #REF! #REF!
Address : #REF! #REF!
Integrity Pact is annexed herewith this Volume.
Date : 00-Jan-00 Printed Name : 0
Place : 0 Designation : 0
Instruction for printing & submitting Integrity Pact
1. The requisite format of Integrity Pact is getting generated automatically and displayed here below.
2. Take print out of first page on a non-judicial stamp paper of Rs. 100/- and other seven pages on plain A4 size paper. Such two sets shall be prepared by the bidder.
3. All the pages of both the copies of the Integrity Pact shall be signed by the authorised representative of the bidder and duly stamped.
4. Both the original copies shall be submitted by the bidder in the form of Hard Copy as part of the first envelope before due date & time of submission of the bid.
5. For further details bidders may please refer ITB Clause 9.3 (n).
Between 0 #REF!
Power Grid Corporation of India Limited 0 #REF!
having its Registered Office at B-9, Qutab Institutional Area, Katwaria Sarai, New Delhi – 110016 hereinafter referred to as #REF! #REF!
"POWERGRID", #REF! #REF!
0 #REF! having its Registered Office at ,
hereinafter referred to as
"The Bidder/Contractor"
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Contractor)
Integrity Pact Page 1 of 8
In order to achieve these goals, POWERGRID and the above named Bidder/Contractor enter into this agreement called 'Integrity Pact' which will form a part of the bid.
It is hereby agreed by and between the parties as under:
Section I - Commitments of POWERGRID
(1) POWERGRID commits itself to take all measures necessary to prevent corruption and to observe the following principles :
a) No employee of POWERGRID, personally or through family members, will in connection with the tender, or the execution of the contract, demand, take a promise for or accept, for him/herself or third person, any material or other benefit which he/she is not legally entitled to.
b) POWERGRID will, during the tender process treat all Bidder(s) with equity and fairness. POWERGRID will in particular, before and during the tender process, provide to all Bidder(s) the same information and will not provide to any Bidder(s) confidential/ additional information through which the Bidder(s) could obtain an advantage in relation to the tender process or the contract execution.
c) POWERGRID will exclude from evaluation of Bids its such employee(s) who has any personnel interest in the Companies/Agencies participating in the Bidding/Tendering process.
(2) If Chairman and Managing Director obtains information on the conduct of any employee of POWERGRID which is a criminal offence under the relevant Anti-Corruption Laws of India, or if there be a substantive suspicion in this regard, he will inform its Chief Vigilance Officer and in addition can initiate disciplinary actions under its Rules.
Section II - Commitments of the Bidder/Contractor
(1) The Bidder/Contractor commits himself to take all measures necessary to prevent corruption. He commits himself to observe the following principles
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Contractor)
Integrity Pact Page 2 of 8
during his participation in the tender process and during the contract execution :
a) The Bidder/Contractor will not, directly or through any other person or firm, offer, promise or give to POWERGRID, or to any of POWERGRID's employees involved in the tender process or the execution of the contract or to any third person any material or other benefit which he/she is not legally entitled to, in order to obtain in exchange an advantage during the tender process or the execution of the contract.
b) The Bidder/Contractor will not enter into any illegal agreement or understanding, whether formal or informal with other Bidders/Contractors. This applies in particular to prices, specifications, certifications, subsidiary contracts, submission or non-submission of bids or actions to restrict competitiveness or to introduce cartelization in the bidding process.
c) The Bidder/Contractor will not commit any criminal offence under the relevant Anti-corruption Laws of India; further, the Bidder/Contractor will not use for illegitimate purposes or for purposes of restrictive competition or personal gain, or pass on to others, any information provided by POWERGRID as part of the business relationship, regarding plans, technical proposals and business details, including information contained or transmitted electronically.
d) The Bidder/Contractor of foreign origin shall disclose the name and address of the Agents/representatives in India, if any, involved directly or indirectly in the Bidding. Similarly, the Bidder/Contractor of Indian Nationality shall furnish the name and address of the foreign principals, if any, involved directly or indirectly in the Bidding.
e) The Bidder/Contractor will, when presenting his bid, disclose any and all payments he has made, or committed to or intends to make to agents, brokers or any other intermediaries in connection with the award of the contract and/or with the execution of the contract.
f) The Bidder/Contractor will not misrepresent facts or furnish false/forged documents/informations in order to influence the bidding process or the execution of the contract to the detriment of POWERGRID.
(2) The Bidder/Contractor will not instigate third persons to commit offences outlined above or be an accessory to such offences.
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Contractor)
Integrity Pact Page 3 of 8
Section III- Disqualification from tender process and exclusion from future contracts
(1) If the Bidder, before contract award, has committed a serious transgression through a violation of Section II or in any other form such as to put his reliability or credibility as Bidder into question, POWERGRID may disqualify the Bidder from the tender process or terminate the contract, if already signed, for such reason.
(2) If the Bidder/Contractor has committed a serious transgression through a violation of Section II such as to put his reliability or credibility into question, POWERGRID may after following due procedures also exclude the Bidder/Contractor from future contract award processes. The imposition and duration of the exclusion will be determined by the severity of the transgression. The severity will be determined by the circumstances of the case, in particular the number of transgressions, the position of the transgressors within the company hierarchy of the Bidder/Contractor and the amount of the damage. The exclusion will be imposed for a minimum of 12 months and maximum of 3 years.
(3) If the Bidder/Contractor can prove that he has restored/recouped the damage caused by him and has installed a suitable corruption prevention system, POWERGRID may revoke the exclusion prematurely.
Section IV - Liability for violation of Integrity Pact
(1) If POWERGRID has disqualified the Bidder from the tender process prior to the award under Section III, POWERGRID may forfeit the Bid Guarantee under the Bid.
(2) If POWERGRID has terminated the contract under Section III, POWERGRID may forfeit the Contract Performance Guarantee of this contract besides resorting to other remedies under the contract.
Section V- Previous Transgression
(1) The Bidder shall declare in his Bid that no previous transgressions occurred in the last 3 years with any other Public Sector Undertaking or Government Department that could justify his exclusion from the tender process.
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Contractor)
Integrity Pact Page 4 of 8
(2) If the Bidder makes incorrect statement on this subject, he can be disqualified from the tender process or the contract, if already awarded, can be terminated for such reason.
Section VI - Equal treatment to all Bidders / Contractors
(1) POWERGRID will enter into agreements with identical conditions as this one with all Bidders.
(2) POWERGRID will disqualify from the tender process any bidder who does not sign this Pact or violate its provisions.
Section VII - Punitive Action against violating Bidders / Contractors
If POWERGRID obtains knowledge of conduct of a Bidder or a Contractor or his subcontractor or of an employee or a representative or an associate of a Bidder or Contractor or his Subcontractor which constitutes corruption, or if POWERGRID has substantive suspicion in this regard, POWERGRID will inform the Chief Vigilance Officer (CVO).
(*)Section VIII - Independent External Monitor/Monitors
(1) POWERGRID has appointed a panel of Independent External Monitors (IEMs) for this Pact with the approval of Central Vigilance Commission (CVC), Government of India, out of which one of the IEMs has been indicated in the NIT/IFB.
(2) The IEM is to review independently and objectively, whether and to what extent the parties comply with the obligations under this agreement. He has right of access to all project documentation. The IEM may examine any complaint received by him and submit a report to Chairman-cum-Managing Director, POWERGRID, at the earliest. He may also submit a report directly to the CVO and the CVC, in case of suspicion of serious irregularities attracting the provisions of the PC Act. However, for ensuring the desired transparency and objectivity in dealing with the complaints arising out of any tendering process, the matter shall be referred to the full panel of IEMs, who would examine the records, conduct the investigations and submit report to Chairman-cum-Managing Director, POWERGRID, giving joint findings.
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Contractor)
Integrity Pact Page 5 of 8
(3) The IEM is not subject to instructions by the representatives of the parties and performs his functions neutrally and independently. He reports to the Chairman-cum-Managing Director, POWERGRID.
(4) The Bidder(s)/Contractor(s) accepts that the IEM has the right to access without restriction to all documentation of POWERGRID related to this contract including that provided by the Contractor/Bidder. The Bidder/Contractor will also grant the IEM, upon his request and demonstration of a valid interest, unrestricted and unconditional access to his documentation. The same is applicable to Subcontractors. The IEM is under contractual obligation to treat the information and documents of the Bidder(s)/Contractor(s)/Subcontractor(s) with confidentiality.
(5) POWERGRID will provide to the IEM information as sought by him which could have an impact on the contractual relations between POWERGRID and the Bidder/Contractor related to this contract.
(6) As soon as the IEM notices, or believes to notice, a violation of this agreement, he will so inform the Chairman-cum-Managing Director, POWERGRID and request the Chairman-cum-Managing Director, POWERGRID to discontinue or take corrective action, or to take other relevant action. The IEM can in this regard submit non-binding recommendations. Beyond this, the IEM has no right to demand from the parties that they act in a specific manner, refrain from action or tolerate action. However, the IEM shall give an opportunity to POWERGRID and the Bidder/Contractor, as deemed fit, to present its case before making its recommendations to POWERGRID.
(7) The IEM will submit a written report to the Chairman-cum-Managing Director, POWERGRID within 8 to 10 weeks from the date of reference or intimation to him by POWERGRID and, should the occasion arise, submit proposals for correcting problematic situations.
(8) If the IEM has reported to the Chairman-cum-Managing Director, POWERGRID, a substantiated suspicion of an offence under relevant Anti-Corruption Laws of India, and the Chairman-cum-Managing Director, POWERGRID has not, within the reasonable time taken visible action to proceed against such offence or reported it to the CVO, the Monitor may also transmit this information directly to the CVC, Government of India.
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Contractor)
Integrity Pact Page 6 of 8
(9) The word ‘IEM’ would include both singular and plural.
(*) This Section shall be applicable for only those packages wherein the IEMs have been identified in Section – I : Invitation for Bids and/or Clause ITB 9.3 in Section – III: Bid Data Sheets of Conditions of Contract, Volume-I of the Bidding Documents.
Section IX - Pact Duration
This Pact begins when both parties have legally signed it. It expires for the Contractor after the closure of the contract and for all other Bidder's six month after the contract has been awarded.
Section X - Other Provisions
(1) This agreement is subject to Indian Law. Place of performance and jurisdiction is the establishment of POWERGRID. The Arbitration clause provided in the main tender document / contract shall not be applicable for any issue / dispute arising under Integrity Pact.
(2) Changes and supplements as well as termination notices need to be made in writing.
(3) If the Contractor is a partnership firm or a consortium or Joint Venture, this agreement must be signed by all partners, consortium members and Joint Venture partners.
(4) Nothing in this agreement shall affect the rights of the parties available under the General Conditions of Contract (GCC) and Special Conditions of Contract (SCC).
(5) Views expressed or suggestions/submissions made by the parties and the recommendations of the CVO/IEM# in respect of the violation of this agreement, shall not be relied on or introduced as evidence in the arbitral or judicial proceedings (arising out of the arbitral proceedings) by the parties in connection with the disputes/differences arising out of the subject contract.
# CVO shall be applicable for packages wherein IEM are not identified in Section IFB/BDS of Condition of Contract, Volume-I. IEM shall be applicable for packages wherein IEM are identified in Section IFB/BDS of Condition of Contract, Volume-I.
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Contractor)
Integrity Pact Page 7 of 8
(6) Should one or several provisions of this agreement turn out to be invalid, the remainder of this agreement remains valid. In this case, the parties will strive to come to an agreement to their original intentions.
Signature Signature
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Contractor)
(Office Seal) (Office Seal)
Designation : Designation :
Witness 1 : Witness 1 :
Designation : Designation :
Witness 2 : Witness 2 :
Designation : Designation :
Integrity Pact Page 8 of 8
USD One Lac Fifty Five Thousand Eight Hundred Eighty Five Only EURO Four Thousand Nine Hundred Sixty Only RMB Ten Thousand Three Hundred Fifty Two Only INR Six Lac Ninety One Thousand Six Hundred Forty Seven Only USD 155885/- + EURO 4960/- + RMB 10352/- + INR 691647/-
USD One Lac Fifty Five Thousand Eight Hundred Eighty Five Only plus EURO Four Thousand Nine Hundred Sixty Only plus RMB Ten Thousand Three Hundred Fifty Two Only plus INR Six Lac Ninety One Thousand Six Hundred Forty Seven Only
85 Eighty Five 60 Sixty 52 Fifty Two 47 Forty Seven
8 Eight Hundred 9 Nine Hundred 3 Three Hundred 6 Six Hundred
55 Fifty Five Thousand 4 Four Thousand 10 Ten Thousand 91 Ninety One Thousand 0 0 0 0 0 plus
1 One Lac 0 0 6 Six Lac 0 0 0 0 1
1 One 1 One 1 One 1 One 0 0 1 0 1
2 Two 2 Two 2 Two 2 Two 0 0 1 1 0
3 Three 3 Three 3 Three 3 Three 0 0 1 1 1
4 Four 4 Four 4 Four 4 Four 0 1 0 0 0
5 Five 5 Five 5 Five 5 Five 0 1 0 0 1
6 Six 6 Six 6 Six 6 Six 0 1 0 1 0
7 Seven 7 Seven 7 Seven 7 Seven 0 1 0 1 1
8 Eight 8 Eight 8 Eight 8 Eight 0 1 1 0 0
9 Nine 9 Nine 9 Nine 9 Nine 0 1 1 0 1
10 Ten 10 Ten 10 Ten 10 Ten 0 1 1 1 0
11 Eleven 11 Eleven 11 Eleven 11 Eleven 1 1 1 1 1 USD One Lac Fifty Five Thousand Eight Hundred Eighty Five Only plus EURO Four Thousand Nine Hundred Sixty Only plus RMB Ten Thousand Three Hundred Fifty Two Only plus INR Six Lac Ninety One Thousand Six Hundred Forty Seven Only
12 Twelve 12 Twelve 12 Twelve 12 Twelve
13 Thirteen 13 Thirteen 13 Thirteen 13 Thirteen
14 Fourteen 14 Fourteen 14 Fourteen 14 Fourteen
15 Fifteen 15 Fifteen 15 Fifteen 15 Fifteen
16 Sixteen 16 Sixteen 16 Sixteen 16 Sixteen 0 0 0 0 0 +
17 Seventeen 17 Seventeen 17 Seventeen 17 Seventeen 0 0 0 0 1 /- +
18 Eighteen 18 Eighteen 18 Eighteen 18 Eighteen 0 0 0 1 0 /-
19 Nineteen 19 Nineteen 19 Nineteen 19 Nineteen 0 0 0 1 1
20 Twenty 20 Twenty 20 Twenty 20 Twenty 0 0 1 0 0
21 Twenty One 21 Twenty One 21 Twenty One 21 Twenty One 0 0 1 0 1
22 Twenty Two 22 Twenty Two 22 Twenty Two 22 Twenty Two 0 0 1 1 0
23 Twenty Three 23 Twenty Three 23 Twenty Three 23 Twenty Three 0 0 1 1 1
24 Twenty Four 24 Twenty Four 24 Twenty Four 24 Twenty Four 0 1 0 0 0
25 Twenty Five 25 Twenty Five 25 Twenty Five 25 Twenty Five 0 1 0 0 1
26 Twenty Six 26 Twenty Six 26 Twenty Six 26 Twenty Six 0 1 0 1 0
27 Twenty Seven 27 Twenty Seven 27 Twenty Seven 27 Twenty Seven 0 1 0 1 1
28 Twenty Eight 28 Twenty Eight 28 Twenty Eight 28 Twenty Eight 0 1 1 0 0
29 Twenty Nine 29 Twenty Nine 29 Twenty Nine 29 Twenty Nine 0 1 1 0 1
30 Thirty 30 Thirty 30 Thirty 30 Thirty 0 1 1 1 0
31 Thirty One 31 Thirty One 31 Thirty One 31 Thirty One 1 1 1 1 1 USD 155885/- + EURO 4960/- + RMB 10352/- + INR 691647/-
32 Thirty Two 32 Thirty Two 32 Thirty Two 32 Thirty Two
33 Thirty Three 33 Thirty Three 33 Thirty Three 33 Thirty Three
34 Thirty Four 34 Thirty Four 34 Thirty Four 34 Thirty Four
35 Thirty Fivr 35 Thirty Fivr 35 Thirty Fivr 35 Thirty Fivr
36 Thirty Six 36 Thirty Six 36 Thirty Six 36 Thirty Six
37 Thirty Seven 37 Thirty Seven 37 Thirty Seven 37 Thirty Seven
38 Thirty Eight 38 Thirty Eight 38 Thirty Eight 38 Thirty Eight
39 Thirty Nine 39 Thirty Nine 39 Thirty Nine 39 Thirty Nine
40 Forty 40 Forty 40 Forty 40 Forty
41 Forty One 41 Forty One 41 Forty One 41 Forty One
42 Forty Two 42 Forty Two 42 Forty Two 42 Forty Two
43 Forty Three 43 Forty Three 43 Forty Three 43 Forty Three
44 Forty Four 44 Forty Four 44 Forty Four 44 Forty Four
45 Forty Five 45 Forty Five 45 Forty Five 45 Forty Five
46 Forty Six 46 Forty Six 46 Forty Six 46 Forty Six
47 Forty Seven 47 Forty Seven 47 Forty Seven 47 Forty Seven
48 Forty Eight 48 Forty Eight 48 Forty Eight 48 Forty Eight
49 Forty Nine 49 Forty Nine 49 Forty Nine 49 Forty Nine
50 Fifty 50 Fifty 50 Fifty 50 Fifty
51 Fifty One 51 Fifty One 51 Fifty One 51 Fifty One
52 Fifty Two 52 Fifty Two 52 Fifty Two 52 Fifty Two
53 Fifty Three 53 Fifty Three 53 Fifty Three 53 Fifty Three
54 Fifty Four 54 Fifty Four 54 Fifty Four 54 Fifty Four
55 Fifty Five 55 Fifty Five 55 Fifty Five 55 Fifty Five
56 Fifty Six 56 Fifty Six 56 Fifty Six 56 Fifty Six
57 Fifty Seven 57 Fifty Seven 57 Fifty Seven 57 Fifty Seven
58 Fifty Eight 58 Fifty Eight 58 Fifty Eight 58 Fifty Eight
59 Fifty Nine 59 Fifty Nine 59 Fifty Nine 59 Fifty Nine
60 Sixty 60 Sixty 60 Sixty 60 Sixty
61 Sixty One 61 Sixty One 61 Sixty One 61 Sixty One
62 Sixty Two 62 Sixty Two 62 Sixty Two 62 Sixty Two
63 Sixty Three 63 Sixty Three 63 Sixty Three 63 Sixty Three
64 Sixty Four 64 Sixty Four 64 Sixty Four 64 Sixty Four
65 Sixty Five 65 Sixty Five 65 Sixty Five 65 Sixty Five
66 Sixty Six 66 Sixty Six 66 Sixty Six 66 Sixty Six
67 Sixty Seven 67 Sixty Seven 67 Sixty Seven 67 Sixty Seven
68 Sixty Eight 68 Sixty Eight 68 Sixty Eight 68 Sixty Eight
69 Sixty Nine 69 Sixty Nine 69 Sixty Nine 69 Sixty Nine
70 Seventy 70 Seventy 70 Seventy 70 Seventy
71 Seventy One 71 Seventy One 71 Seventy One 71 Seventy One
72 Seventy Two 72 Seventy Two 72 Seventy Two 72 Seventy Two
73 Seventy Three 73 Seventy Three 73 Seventy Three 73 Seventy Three
74 Seventy Four 74 Seventy Four 74 Seventy Four 74 Seventy Four
75 Seventy Five 75 Seventy Five 75 Seventy Five 75 Seventy Five
76 Seventy Six 76 Seventy Six 76 Seventy Six 76 Seventy Six
77 Seventy Seven 77 Seventy Seven 77 Seventy Seven 77 Seventy Seven
78 Seventy Eight 78 Seventy Eight 78 Seventy Eight 78 Seventy Eight
79 Seventy Nine 79 Seventy Nine 79 Seventy Nine 79 Seventy Nine
80 Eighty 80 Eighty 80 Eighty 80 Eighty
81 Eighty One 81 Eighty One 81 Eighty One 81 Eighty One
82 Eighty Two 82 Eighty Two 82 Eighty Two 82 Eighty Two
83 Eighty Three 83 Eighty Three 83 Eighty Three 83 Eighty Three
84 Eighty Four 84 Eighty Four 84 Eighty Four 84 Eighty Four
85 Eighty Five 85 Eighty Five 85 Eighty Five 85 Eighty Five
86 Eighty Six 86 Eighty Six 86 Eighty Six 86 Eighty Six
87 Eighty Seven 87 Eighty Seven 87 Eighty Seven 87 Eighty Seven
88 Eighty Eight 88 Eighty Eight 88 Eighty Eight 88 Eighty Eight
89 Eighty Nine 89 Eighty Nine 89 Eighty Nine 89 Eighty Nine
90 Ninety 90 Ninety 90 Ninety 90 Ninety
91 Ninety One 91 Ninety One 91 Ninety One 91 Ninety One
92 Ninety Two 92 Ninety Two 92 Ninety Two 92 Ninety Two
93 Ninety Three 93 Ninety Three 93 Ninety Three 93 Ninety Three
94 Ninety Four 94 Ninety Four 94 Ninety Four 94 Ninety Four
95 Ninety Five 95 Ninety Five 95 Ninety Five 95 Ninety Five
96 Ninety Six 96 Ninety Six 96 Ninety Six 96 Ninety Six
97 Ninety Seven 97 Ninety Seven 97 Ninety Seven 97 Ninety Seven
98 Ninety Eight 98 Ninety Eight 98 Ninety Eight 98 Ninety Eight
99 Ninety Nine 99 Ninety Nine 99 Ninety Nine 99 Ninety Nine
100 One Hundred 100 One Hundred 100 One Hundred 100 One Hundred
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
23 Twenty Three
27 Twenty Seven
28 Twenty Eight
33 Thirty Three
37 Thirty Seven
38 Thirty Eight
73 Seventy Three
74 Seventy Four
75 Seventy Five
77 Seventy Seven
78 Seventy Eight
79 Seventy Nine
83 Eighty Three
87 Eighty Seven
88 Eighty Eight
93 Ninety Three
97 Ninety Seven
98 Ninety Eight
100 One Hundred
Annual Maintenance Contract (Package –II) at 765/400 KV, Vemagiri S/S for a period of Two years
Schedule-I : DSR Scheduled Items
Bidder’s Name and Address (Sole Bidder) : 0 Contract Services
Address : 0 Power Grid Corporation of India Ltd.,
0 Southern Region Transmission system -I
0 Kavadiguda Main Raod, Secunderabad - 500080
All prices are in INR
Sl. No. DSR 2023 Ref No: Service Number SAC (Service Accounting Codes) Whether SAC in column ‘4’ is confirmed. If not indicate applicable the SAC # Rate of GST applicable ( in %) Whether rate of GST in column ‘6’ is confirmed. If not indicate applicable rate of GST # Description (DSR'23 Items- Civil Works) Unit Quantity Unit Erection Charges as per DSR incl. GST Unit Erection Charges as per DSR excl. GST Unit Erection Charges incl. Escl.@3% excluding GST Rates excl. GST (as per Quoted Percentage) GST % Amount as per DSR excluding GST GST on DSR Amount Quoted Amount excluding GST GST on Quoted Amount
Part-I SCHEDULE ITEMS
A Civil Maintenance Works
1 2.6.1 Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge: All kinds of soil Cum 100.00 177.50 150.42 154.94 154.94 18.00% 15,494.00 2,788.92 15,494.00 2,788.92
2 2.8.1 Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. Cum 100.00 260.30 220.59 227.21 227.21 18.00% 22,721.00 4,089.78 22,721.00 4,089.78
3 4.1.3 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) Cum 10.00 7,878.50 6,676.69 6877.00 6,877.00 18.00% 68,770.00 12,378.60 68,770.00 12,378.60
4 4.1.5 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 20 mm nominal size) Cum 20.00 7,294.70 6,181.95 6367.41 6,367.41 18.00% 127,348.20 22,922.68 127,348.20 22,922.68
5 4.1.8 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) Cum 50.00 6,812.00 5,772.88 5946.07 5,946.07 18.00% 297,303.50 53,514.63 297,303.50 53,514.63
6 4.3.1 Centering and shuttering including strutting, propping etc. and removal of form work for : PCC sides, Foundations, footings, bases for columns Sqm 100.00 392.15 332.33 342.30 342.30 18.00% 34,230.00 6,161.40 34,230.00 6,161.40
7 5.22.6 Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level : Thermo-Mechanically Treated bars of grade Fe-500D or more Kg 200.00 107.85 91.40 94.14 94.14 18.00% 18,828.00 3,389.04 18,828.00 3,389.04
8 6.1.2 Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in Cement mortar 1:6 (1 cement : 6 coarse sand) Cum 40.00 7,132.25 6,044.28 6225.61 6,225.61 18.00% 249,024.40 44,824.39 249,024.40 44,824.39
9 6.12.2 Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundations and plinth in : cement mortar 1:4 (1 cement : 4 coarse sand) Sqm 30.00 905.05 766.99 790.00 790.00 18.00% 23,700.00 4,266.00 23,700.00 4,266.00
10 7.1.1 Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with : Cement mortar 1:6 (1 cement : 6 coarse sand) Cum 5.00 7,311.25 6,195.97 6381.85 6,381.85 18.00% 31,909.25 5,743.67 31,909.25 5,743.67
11 9.132 Providing and fixing aluminum U beading of required size to Pre laminated/flush door shutter, including fixing etc. complete as per direction of Engineer-in-charge. Kg 20.00 596.15 505.21 520.37 520.37 18.00% 10,407.40 1,873.33 10,407.40 1,873.33
12 13.80 Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete Sqm 250.00 156.05 132.25 136.21 136.21 18.00% 34,052.50 6,129.45 34,052.50 6,129.45
13 13.81.1 Distempering with 1st quality acrylic distemper (ready mixed) having VOC (Volatile Organic Compound ) content less than 50 gram/ litre, of approved brand and manufacturer including applying additional coats wherever required to achieve even shade and colour: Old work (one or more coats) Sqm 1500.00 62.70 53.14 54.73 54.73 18.00% 82,095.00 14,777.10 82,095.00 14,777.10
14 13.87.2 White washing with lime to give an even shade : Old work (one or more coats) Sqm 750.00 13.90 11.78 12.13 12.13 18.00% 9,097.50 1,637.55 9,097.50 1,637.55
15 13.91 Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete. Sqm 1250.00 25.15 21.31 21.95 21.95 18.00% 27,437.50 4,938.75 27,437.50 4,938.75
16 13.99.1 Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : One or more coats on old work Sqm 400.00 102.80 87.12 89.73 89.73 18.00% 35,892.00 6,460.56 35,892.00 6,460.56
17 13.109.1 Finishing walls with water proofing cement paint of required shade : Old work (one or more coats @ 2.20 kg/10 sqm) complete. Sqm 500.00 75.80 64.24 66.16 66.16 18.00% 33,080.00 5,954.40 33,080.00 5,954.40
18 13.111.2 Finishing walls with Acrylic Smooth exterior paint of required shade : Old work (One or more coat applied @ 0.90 ltr/10 sqm). Sqm 300.00 80.65 68.35 70.40 70.40 18.00% 21,120.00 3,801.60 21,120.00 3,801.60
19 14.1.1 Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq.meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground, all complete as per direction of Engineer-in-Charge. Sqm 50.00 547.40 463.90 477.82 477.82 18.00% 23,891.00 4,300.38 23,891.00 4,300.38
20 14.75 Repair to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sqm and under, including cutting the patch in proper shape, raking out joints and preparing plastering the wall surface with white cement based polymer modified self curing mortar, including disposal of rubbish, all complete as per the direction of Engineer-In-Charge. Sqm 50.00 670.95 568.60 585.66 585.66 18.00% 29,283.00 5,270.94 29,283.00 5,270.94
21 15.58 Demolishing R.C.C. work by mechanical means and stockpiling at designated locations and disposal of dismantled materials up to a lead of 1 kilometre, stacking serviceable and unserviceable material separately including cutting reinforcement bars. Sqm 10.00 2,818.90 2,388.90 2460.57 2,460.57 18.00% 24,605.70 4,429.03 24,605.70 4,429.03
23 16.83 Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. Sqm 150.00 131.75 111.65 115.00 115.00 18.00% 17,250.00 3,105.00 17,250.00 3,105.00
24 16.84 Laying old cement cocrete interlocking paver blocks of any design/ shape laid in required line, level, curvature, colour and pattern over and including 50 mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge. (Old CC paver blocks shall be supplied by the department free of cost). Sqm 100.00 402.95 341.48 351.73 351.73 18.00% 35,173.00 6,331.14 35,173.00 6,331.14
25 21.1.2.2 Providing and fixing aluminium work for doors, windows, ventilators and partitions with extruded built up standard tubular sections/ appropriate Z sections and other sections of approved make conforming to IS: 733 and IS: 1285, fixing with dash fasteners of required dia and size, including necessary filling up the gaps at junctions, i.e. at top, bottom and sides with required EPDM rubber/ neoprene gasket etc. Aluminium sections shall be smooth, rust free, straight, mitred and jointed mechanically wherever required including cleat angle, Aluminium snap beading for glazing / panelling, C.P. brass / stainless steel screws, all complete as per architectural drawings and the directions of Engineer-in-charge. (Glazing, paneling and dash fasteners to be paid for separately) : For shutters of doors, windows & ventilators including providing and fixing hinges/ pivots and making provision for fixing of fittings wherever required including the cost of EPDM rubber / neoprene gasket required (Fittings shall be paid for separately) Powder coated aluminium (minimum thickness of powder coating 50 micron) Kg 100.00 634.45 537.67 553.80 553.80 18.00% 55,380.00 9,968.40 55,380.00 9,968.40
26 21.3.2 Providing and fixing glazing in aluminium door, window, ventilator shutters and partitions etc. with EPDM rubber / neoprene gasket etc. complete as per the architectural drawings and the directions of engineer-in-charge . (Cost of aluminium snap beading shall be paid in basic item): With float glass panes of 5 mm thickness (weight not less than 12.50 kg/sqm) Sqm 15.00 1,505.25 1,275.64 1313.90 1,313.90 18.00% 19,708.50 3,547.53 19,708.50 3,547.53
27 21.8.1 Filling the gap in between aluminium frame & adjacent RCC/ Brick/ Stone work by providing weather silicon sealant over backer rod of approved quality as per architectural drawings and direction of Engineer-in-charge complete: Upto 5 mm depth and 5 mm width Metre 500.00 96.75 81.99 84.45 84.45 18.00% 42,225.00 7,600.50 42,225.00 7,600.50
28 21.15.2 Providing and fixing aluminium casement windows fastener of required length for aluminium windows with necessary screws etc. complete :Powder coated minimum thickness 50 micron aluminium Each 5.00 97.95 83.01 85.50 85.50 18.00% 427.50 76.95 427.50 76.95
29 21.19.1 Filling the gap in between aluminium/ stone/ wood frame and adjacent RCC/Brick/ Stone/ wood/ Ceramic/ Gypsum work by providing weather/structural non sag elastomeric PU sealant over backer rod of approved quality as per architectural drawings and direction of Engineer-in-charge complete, complying to ASTM C920, DIN 18540-F & ISO 11600 : Upto 5 mm depth and 5 mm width Metre 500.00 148.10 125.51 129.27 129.27 18.00% 64,635.00 11,634.30 64,635.00 11,634.30
30 21.19.2 Filling the gap in between aluminium/ stone/ wood frame and adjacent RCC/Brick/ Stone/ wood/ Ceramic/ Gypsum work by providing weather/structural non sag elastomeric PU sealant over backer rod of approved quality as per architectural drawings and direction of Engineer-in-charge complete, complying to ASTM C920, DIN 18540-F & ISO 11600 : Upto 10 mm depth and 10 mm width Metre 500.00 200.95 170.30 175.41 175.41 18.00% 87,705.00 15,786.90 87,705.00 15,786.90
Total of Scheduled Items- Civil 1,542,793.95 277,702.91 1,542,793.95 277,702.91
B SCHEDULE ITEMS (Horticulture Maintenance Works)
1 2.2 Supplying and stacking of good earth at site including royalty and carriage upto 5 km lead complete (earth measured in stacks will be reduced by 20% for payment). Cum 50.00 803.75 681.14 681.14 681.14 18.00% 34,057.0000 6,130.2600 34,057.00 6,130.26
2 2.25 Supplying and stacking of well decayed cattle manure at site including royalty and carriage upto 05 k.m. lead complete (Cattle manur measured in stacks will reduced by 8% for Payment). Cum 150.00 667.10 565.34 565.34 565.34 18.00% 84,801.0000 15,264.1800 84,801.00 15,264.18
Total of Scheduled Items- Electrical 118,858.00 21,394.44 118,858.00 21,394.44
Total of Scheduled Items- (Schedule-I) 1,661,651.95 299,097.35 1,661,651.95 299,097.35
Percentage (%) above/below +/- on DSR 2023 Rates excluding GST mentioned above (to be quoted by Bidder)
Total of Schedule I excluding GST considering offered % age 1,661,651.95
Total GST 299,097.35
GRAND TOTAL incl. GST Schedule-I 1,960,749.30
As the %variation w.r.t total DSR Amount cell left Blank the bid is considered as Non-responsive
Annual Maintenance Contract (Package –II) at 765/400 KV, Vemagiri S/S for a period of Two years
Schedule-II : Non-Scheduled Items
Bidder’s Name 0 To:
Address : 0 Contract Services
0 Power Grid Corporation of India Ltd.,
0 Southern Region Transmission system -I
Kavadiguda Main Raod, Secunderabad - 500080
Sl. No. Service Number SAC Code Whether SAC in column ‘2’ is confirmed. If not indicate applicable the SAC # Rate of GST applicable ( in %) Whether rate of GST in column ‘6’ is confirmed. If not indicate applicable rate of GST # Description (Non Schedule Items) Unit Quantity Unit Rate without GST Total Amount excl. GST GST Remarks 10
NON-SCHEDULE ITEMS:
C Horticulture Maintenance Works
NS_1 18% Supply & stacking of fine sand at site (stack measurement shall be taken for payment) Cum 20.00 0.00 0.00
NS_2 18% Collection of common garbage bins/points, leaves, branches of trees and other colony waste and disposal of such wasteful material to outside substation premises including loading unloading and carriage by mechanical means i.e tractor trolley etc as per the requirement and instructions of engineer in charge (one operation shall consist of four trips by tractor with trolley) Operations 20.00 0.00 0.00
NS_3 Supply and Delivery of following Chemical Fertilizers/Pesticides of approved quality with standard brand or as approved by the engineer-in-charge:
i 5% Neem Cake - 5% GST Kg 1,000.00 0.00 0.00
iii 18% Monocrotophos - 18% GST Litre 200.00 0.00 0.00
v 18% Rogor - 18% GST Litre 200.00 0.00 0.00
vi 5% Rose Mix - 5% GST Kg 100.00 0.00 0.00
TOTAL FOR NON-SCHEDULE ITEMS: CIVIL 0.00 0.00
D DE-WEEDING, GRASS CUTTING & JUNGLE CLEARANCE WORKS
NS_1 18% In Colony, Stores and Other areas: Clearing jungle including uprooting of rank vegetation, Grass, brush wood, saplings etc., by MANUAL or MECHANICAL means and disposal of rubbish outside the periphery of substation including transportation as directed by the Engineer-in-charge. The area for disposal of rubbis / grass etc outside the substation premises shall be arranged by the bidder at his own cost. (4 operation a year X 2 years X 50000 Sqm area) Sqm 400,000.00 0.00 0.00
NS_2 18% In Switch yard Non Metal Area: Clearing jungle including uprooting of rank vegetation, Grass, brush wood, saplings etc., by MANUAL or MECHANICAL means as per available clearance to charged portion and disposal of rubbish outside the periphery of substation including transportation as directed by the Engineer-in-charge. The area for disposal of rubbish/grass etc. outside the substation premises shall be arranged by the contractor at his own cost. (i) Non-metal (open road and road side berms in switchyard). Township, road sides, other open grounds / spaces in the substation premises including road berms and around the buildings inside the switchyard fence. (4 operation a year X 2 years X 9625 Sqm area) Sqm 77,000.00 0.00 0.00
TOTAL FOR NON-SCHEDULE ITEMS: (Electrical) 0.00 0.00
Total of Non-Schedule Items (Schedule - II) 0.00 0.00 Sheet OK
GRAND Total incl. GST of Non-Schedule Items (Schedule - II) 0.00 Sheet OK
As all the line items are Left Blank the bid is considered as Non-responsive
Annual Maintenance Contract (Package –II) at 765/400 KV, Vemagiri S/S for a period of Two years
(GRAND SUMMARY)
Bidder’s Name and Address (Sole Bidder) : To:
Name : 0 Contract Services
Address : 0 Power Grid Corporation of India Ltd.,
0 Southern Region Transmission system -I
0 Kavadiguda Main Raod,
Secunderabad - 500080
Sl. No. Description Total Price (INR)
1.1 TOTAL SCHEDULE NO. I
Supply & Installation Charges- Schedule Civil & Electrical Items for Annual Maintenance Contract (Package –II) at 765/400 KV, Vemagiri S/S for a period of Two years NOT QUOTED
1.2 TOTAL SCHEDULE NO. II
Supply & Installation Charges- Non-Schedule Civil & Electrical Items for Annual Maintenance Contract (Package –II) at 765/400 KV, Vemagiri S/S for a period of Two years NOT QUOTED
I Total of Service/Installation Charge (ITEMS TAB: Item 01 INSTALLATION FOR DCB (INR) : SRM ATB for BID PRICE SUMMARY Statement ) Non-responsive Bid
GST on Schedule-I 299,097.35
GST on Schedule-II 0.00
Total GST for BID PRICE SUMMARY Statement ) Non-responsive Bid
III GRAND TOTAL Non-responsive Bid
Date : 0 Printed Name : 0.00
Place : 0 Designation : 0.00
Specification No: SR-I/C&M/WC-4546/2026/ Rfx no.: 5002005046 (SR1/NT/W-CIVIL/DOM/B00/26/00767) Bid Form 2nd Envelope
BID FORM (Second Envelope)
Bid Proposal Ref. No.
Contract Services
Power Grid Corporation of India Ltd.,
Southern Region Transmission System-I
Name of Contract : Annual Maintenance Contract (Package –II) at 765/400 KV, Vemagiri S/S for a period of Two years
Dear Ladies and/or Gentlemen,
1.0 In continuation of First Envelope of our Bid, we hereby submit the Second Envelope of the Bid, both of which shall be read together and in conjunction with each other, and shall be construed as an integral part of our Bid. Accordingly, we the undersigned, offer to undertake the above-named package in full conformity with the said Bidding Documents for the sum of Rs. Non-responsive Bid /- only or such other sums as may be determined in accordance with the terms and conditions of the Bidding Documents. In continuation of First Envelope of our Bid, we hereby submit the Second Envelope of the Bid, both of which shall be read together and in conjunction with each other, and shall be construed as an integral part of our Bid. Accordingly, we the undersigned, offer to undertake the above-named package in full conformity with the said Bidding Documents for the sum of Rs. /- only or such other sums as may be determined in accordance with the terms and conditions of the Bidding Documents. Non-responsive Bid
Sch-1 Schedules Items as per DSR 2021 excluding GST
Sch-2 Non-Scheduled Items
Sch-3 Grand Summary
2.3 We declare that as specified in Clause 4.6, ITB, Vol.-IA of the Bidding Documents, the prices of all the Services to be supplied under this contract shall be FIRM and doesnot subject to any price adjustment as per relevant clauses in bidding document.
3.0 We confirm that except as otherwise specifically provided our Bid Prices in this Second Envelope include all taxes, duties, levies and charges as may be assessed on us/our Associate (applicable for Foreign Bidder), our Sub-Contractor/Sub-Vendor or their employees by all municipal, state or national government authorities in connection with the Facilities, in and outside of India.
3.1 100% of applicable Taxes and Duties i.e GST , which are payable by the Employer under the Contract, shall be reimbursed by the Employer on production of satisfactory documentary evidence by the Contractor in accordance with the provisions of the Bidding Documents.
3.3 We confirm that we have also registered/we shall also get registered in the GST Network with a GSTIN, in all the states where the project is located and the states from which we shall make our supply of goods.
4.0 # (For Joint Venture only) We, the partners of Joint Venture submitting this bid, do agree and confirm that in case of Award of Contract on the Joint Venture, we shall be jointly and severally liable and responsible for the execution of the Contract in accordance with Contract terms and conditions.
5.0 We, hereby, declare that only the persons or firms interested in this proposal as principals are named here and that no other persons or firms other than those mentioned herein have any interest in this proposal or in the Contract to be entered into, if the award is made on us, that this proposal is made without any connection with any other person, firm or party likewise submitting a proposal is in all respects for and in good faith, without collusion or fraud.
Thanking you, we remain,
Yours faithfully,
For and on behalf of
Date : 00-Jan-00 Printed Name : 0
Place : 0 Designation : 0
Please provide additional information of the Bidder
Business Address :
Country of Incorporation :
State/Province to be indicated :
Name of Principal Officer :
Address of Principal Officer :
Note: Bidders may note that no prescribed proforma has been enclosed for Attachment 2 : Power of Attorney. Bidders may use their own proforma for furnishing the required information with the bid.
ATTACHMENTS General guidelines for filling up the Attachments
THIS BID IS RESERVED FOR WOMEN BIDDERS ONLY
Annual Maintenance Contract (Package –II) at 765/400 KV, Vemagiri S/S for a period of Two years
[Spec. No.: SR-I/C&M/WC-4546/2026/ Rfx no.: 5002005046 (SR1/NT/W-CIVIL/DOM/B00/26/00767) ]
1 Fill up only green shaded cells in the relevent attachments.
2 Attachments 3, 4, 5, 6, 7, 8, 9, 11, 12,13, 14, 15 and Bid Form for 1st Envelope are included here.
3 Attachment 1 Bid Security : To be submitted as per proforma provided in the Bidding Document.
4 Attachment 2 Power of Attorney : No specific format is provided by POWERGRID. Bidder may use their own format.
8 Attachment 20: Unequivocal consent of the proposed Associate(s) for the purpose of executing the 'Second Contract' and /or 'Third Contract' as an independent Contractor (applicable to foreign bidder) : No specific format is provided by POWERGRID. Bidder may use their own format.
9 Attachment 21: Capacity, Capability and Experience of Proposed Associate(s) (applicable for foreign bidder) : No specific format is provided by POWERGRID. Bidder may use their own format.
पावर ग्रिड कारपोरेशन ऑफ इण्डिया लिमिटेड
(भारत सरकार का उद्यम)
Power Grid Corporation of India Limited
(A Government of India Enterprises)
Annual Maintenance Contract (Package –II) at 765/400 KV, Vemagiri S/S for a period of Two years
[Spec. No.: SR-I/C&M/WC-4546/2026/ Rfx no.: 5002005046 (SR1/NT/W-CIVIL/DOM/B00/26/00767) ]
Enter the details of the bidder below:
Specify type of Bidder Sole Bidder
Name of the Bidder
Address of Registered Office
Contact Details:
[Spec. No.: SR-I/C&M/WC-4546/2026/ Rfx no.: 5002005046 (SR1/NT/W-CIVIL/DOM/B00/26/00767) ] ATTACHMENT-3 (QR)
Annual Maintenance Contract (Package –II) at 765/400 KV, Vemagiri S/S for a period of Two years
(Qualifying Requirement Data)
THIS BID IS RESERVED FOR WOMEN BIDDERS ONLY
Bidder’s Name and Address (Bidder) : To
Name: 0 Sr.GM(C&M)
Address: 0 Contracts & Materials Department
0 Power Grid Corporation of India Ltd.,
0 Kavadiguda Main Road,
Secunderabad - 500 080
In support of the Qualification Requirements (QR) for bidders, stipulated in Section-III of the Bidding Documents, we furnish herewith our QR data/details/documents etc. along with other information, as follows (The QR stipulations have been reproduced in italics for ready reference, however, in case of any discrepancy the QR as given in Section-III shall prevail).
We are furnishing the following details/document in support of Qualifying requirement for the subject package.
A Attached copies of original documents defining :
a) The constitution or legal status; #REF!
b) The principal place of business; #REF!
c) The place of incorporation (for bidders who are corporations); or the place of registration and the nationality of the Owners (for applicants who are partnerships or individually-owned firms).
B Attached original & copies of the following documents :
a) Written power of attorney of the signatory of the Bid to commit the bidder.
1.0 GENERAL INFORMATION
Bidder is required to provide general information as per the following format.
S No. Particulars For Individual Firm
1 Name of the Firm
2 Head Office/ Registered Office Address
5 Contact Person
6 Place of Incorporation/ Registration
7 Year of Incorporation/ Registration
8 Nationality of the Agency
[Necessary documents to eatablish legal status of the bidder should be uploaded with the bid]
2.0 TECHNICAL REQUIREMENTS {Reference Section-III}
2.1 THIS BID IS RESERVED FOR WOMEN BIDDERS ONLY
2.2 Bidder who wish to participate in the tender should have executed and successfully completed similar nature of works for any State/Central Govt. departments/ undertakings/reputed private organizations during last Five years as on the originally scheduled date of bid opening: One similar work of value not less than Rs. 24.53 Lakhs excl. GST or Two similar works, each of value not less than Rs. 15.33 Lakhs excl. GST or Three similar works, each of value not less than Rs. 12.27 Lakhs excl. GST
(a) Following documents shall be submitted by the bidder as evidence of above: (i) Completion certificate(s) from the client for the work inter alia indicating final executed amount and date of completion or any other document, authenticated by the client, containing relevant information to conclusively establish that the bidder has completed the requisite work(s) as per the requirement specified above. (ii) The copy of corresponding work order(s) shall also be submitted. Similar Nature of works: AMC-II or any Civil works involving construction/ repair activity shall be considered as Similar nature of work
2.3 Format for the Bidder for indicating its technical experience (in support of meeting the requirement of para 2.1 above is to be furnished, as applicable, using this format]
Name of the Bidder
1 Name of Contract:
2 Contract Reference No. & Date of Award
3 Name and Address of the Employer/Utility by whom the Contract was awarded
4 Scope of work executed under the above contract
5 Date of Completion of works under the Contract
6 Total Value of work executed (Rs.)
7 Details of documents furnished in the Bid, in support of the aforesaid data/details/informations
Name of the Bidder
1 Name of Contract:
2 Contract Reference No. & Date of Award
3 Name and Address of the Employer/Utility by whom the Contract was awarded
4 Scope of work executed under the above contract
5 Date of Completion of works under the Contract
6 Total Value of work executed (Rs.)
7 Details of documents furnished in the Bid, in support of the aforesaid data/details/informations
Name of the Bidder
1 Name of Contract:
2 Contract Reference No. & Date of Award
3 Name and Address of the Employer/Utility by whom the Contract was awarded
4 Scope of work executed under the above contract
5 Date of Completion of works under the Contract
6 Total Value of work executed (Rs.)
7 Details of documents furnished in the Bid, in support of the aforesaid data/details/informations
3.0 FINANCIAL REQUIREMENTS {Reference Section-III}
a) (i) The Minimum Annual Average Turnover* (MAAT) of the bidder for the best three (3) financial years out of the preceding five (5) financial years shall be: Rs. 22.999 Lacs * Note- “Annual gross revenue from operation/gross operating income as incorporated in the profit &loss account excluding other income”.
Note: In case the bidder is a holding company, the Financial Position criteria referred to in clause 3.0 above shall be that of holding company only (i.e. excluding its subsidiary / group companies). In case bidder is a subsidiary of a holding company, the Financial Position criteria referred to in clause 3.0 above shall be that of subsidiary company only (i.e. excluding its holding company).
RELAXATION FOR MSME BIDDERS MSMEs $ / START Ups^: All MSE bidders are exempted from meeting MAAT requirement. Further, START UPs meeting the specified requirements at (I) Technical Experience above shall also be considered qualified if they meet 80% (Eighty percent) of the requirements as specified at para (II) above in financial position. • ^ Start-Ups as defined by DPIIT, applicable as on the originally scheduled date of bid opening. • $ MSE as defined in the bidding documents. Bidder shall furnish documentary evidence in support of the qualifying requirements stipulated above. (a) Following documents shall be submitted by the bidder as evidence of above: i) Audited balance sheet and Profit & Loss Account for the preceding five (5) financial years. In case, the audited balance sheet for latest financial year is not available, a certificate from the Chartered Accountant on their letter head certifying the financial turnover for the latest financial year may be submitted. ii) In case, the bidder is not covered under compulsory tax audit under the IT act for a particular financial year, a copy of acknowledgement of income tax return filed for the corresponding period should also be submitted along with either certificate from Chartered Accountant certifying the turn over or print out of Form 26AS.
3.2 Format for the Bidder for indicating its Financial Criteria (in support of meeting the requirement of para 3.1 above is to be furnished, as applicable, using this format]
Financial Year Turnover
Details of documents furnished in the Bid, in support of the aforesaid data/details/informations
(Use separate sheet for each experience/ Contract)
Date : 00-Jan-00 Printed Name : 0
Place : 00-Jan-00 Designation : 0
[Spec. No.: SR-I/C&M/WC-4546/2026/ Rfx no.: 5002005046 (SR1/NT/W-CIVIL/DOM/B00/26/00767) ] ATTACHMENT-4
Annual Maintenance Contract (Package –II) at 765/400 KV, Vemagiri S/S for a period of Two years
(Alternative, Deviations and Exceptions to the Provisions)
Bidder’s Name and Address (Bidder) : To
Name : 0 Sr.GM(C&M)
Address : 0 Contracts & Materials Department
0 Power Grid Corporation of India Ltd.,
0 Kavadiguda Main Road,
The bidder shall itemize any deviation from the Specifications included in his bid. Each item shall be listed (separate sheets may be used and enclosed with this Attachment) with the following information:
Sl. No. Reference clause in the Specifications Deviation Reason for change The change in Bid Prices if the deviation is withdrawn and the Bidder conforms to the Specifications
Any proposed deviation will be applicable only for the bidder whose bid is substantially responsive in accordance with Clause 22, Section ITB, Vol. I of the bidding documents. If a bid is not substantially responsive, it will be rejected and may not subsequently be made responsive by the bidder by correction of the non-conformity.
The above deviations and variations are exhaustive. We confirm that we shall withdraw the deviations proposed by us at the cost of withdrawal indicated in this attachment, failing which our bid may be rejected and Bid Security forfeited.
Date : 00-Jan-00 Printed Name : 0
Place : 0 Designation : 0
[Spec. No.: SR-I/C&M/WC-4546/2026/ Rfx no.: 5002005046 (SR1/NT/W-CIVIL/DOM/B00/26/00767) ] ATTACHMENT-5
Annual Maintenance Contract (Package –II) at 765/400 KV, Vemagiri S/S for a period of Two years
(Work Completion Schedule)
Bidder’s Name and Address (Bidder) : To
Name : 0 Sr.GM(C&M)
Address : 0 Contracts & Materials Department
0 Power Grid Corporation of India Ltd.,
0 Kavadiguda Main Road,
Secunderabad - 500 080
We hereby declare that the following Work Completion Schedule shall be followed by us in furnishing and installation of the subject package i.e., Annual Maintenance Contract (Package –II) at 765/400 KV, Vemagiri S/S for a period of Two years for the period commencing from the effective date of Contract to us :
Sl. No. Description of Work Period in months from the effective date of Contract
Date : 00-Jan-00 Printed Name : 0
Place : 0 Designation : 0
Note: Bidders to enclose a detailed network covering all the activities to be undertaken for completion of the project indicating key dates for various milestones for each phase constituent-wise
[Spec. No.: SR-I/C&M/WC-4546/2026/ Rfx no.: 5002005046 (SR1/NT/W-CIVIL/DOM/B00/26/00767) ] ATTACHMENT-6
Annual Maintenance Contract (Package –II) at 765/400 KV, Vemagiri S/S for a period of Two years
(Information regarding Ex-employees of POWERGRID in our Organisation)
Bidder’s Name and Address (Bidder) : To
Name : 0 Sr.GM(C&M)
Address : 0 Contracts & Materials Department
0 Power Grid Corporation of India Ltd.,
0 Kavadiguda Main Road,
Secunderabad - 500 080
We hereby furnish the details of ex-employees of POWERGRID who had retired/ resigned at the level of General Manager and above from POWERGRID and subsequently have been employed by us:
Sl. No. Name of the person with designation in POWERGRID Date of Retirement/ resignation from POWERGRID Date of joining and designation in our organisation
Date : 00-Jan-00 Printed Name : 0
Place : 0 Designation : 0
Note: The information in similar format should be furnished for each partner of joint venture in case of joint venture bid.
[Spec. No.: SR-I/C&M/WC-4546/2026/ Rfx no.: 5002005046 (SR1/NT/W-CIVIL/DOM/B00/26/00767) ] ATTACHMENT-7
Annual Maintenance Contract (Package –II) at 765/400 KV, Vemagiri S/S for a period of Two years
(Declaration regarding Social Accountability)
Bidder’s Name and Address (Bidder) : To
Name : 0 Sr.GM(C&M)
Address : 0 Contracts & Materials Department
0 Power Grid Corporation of India Ltd.,
0 Kavadiguda Main Road,
We conform that we stand committed to comply to all requirements of Social Accountability Standards i.e., SA8000 (latest Standard available at www.sa-intl.org) and maintain the necessary records.
Date : 00-Jan-00 Printed Name : 0
Place : 00-Jan-00 Designation : 0
[Spec. No.: SR-I/C&M/WC-4546/2026/ Rfx no.: 5002005046 (SR1/NT/W-CIVIL/DOM/B00/26/00767) ] Attachment-8
Annual Maintenance Contract (Package –II) at 765/400 KV, Vemagiri S/S for a period of Two years
Information for E – payment, PF details and declaration for Micro/Small and Medium Enterprise)
Bidder’s Name and Address (Bidder) : To:
Contract & Material
Name : 0 Power Grid Corporation of India Ltd.,
Address : 0 Southern Region -I Headquarters
0 Kavadiguda Main Road
0 Secunderabad - 500080 (Telangana)
I. We have read the provision in the Bidding Documents regarding furnishing the option for advance payment.
Accordingly, as per ITB Clause 9.3 as provided in Section BDS, Section III, Vol.-I of the Bidding Documents,
we hereby confirm to opt the following:
Interest Bearing Initial Advance: Supply Portion
(Select from drop down list)
We are furnishing the following details of Statutory Registration Numbers and details of Bank for electronic payment.
1. Name of the Supplier/ Contractor in whose favour payment is to be made Details
2. Address with PIN Code and State
Registered Office:
Correspondence Address:
3. Status – Company/others
[Declaration of Micro/ Small/ Medium Enterprise under Micro/ Small & Medium Enterprises Development Act 2006, if applicable]
4. Permanent Account (PAN) No.
5. GSTIN in the States/UT where the supply for services take place (states where sites under the subject package is situated)
6 Name of the States/UT GSTIN number
a Andhra Pradesh
9. PF Registration No. of the Company
10. PF Regional Office covered (with Address)
11. Name of Contact Person
12. Telephone No(s)
13. Bank Details for Electronic Payment
Name of the Bank:
Address of Branch:
Type of Account: Current Account
14. 9 digit MICR code printed at bottom in middle, next to cheque no.
15. IFSC (for RTGS)/NEFT Code (to be obtained from the Bank) Sample Cancelled Cheque to be enclosed
We hereby declare that the above information are true and correct and we agree that the payment on account of this Contract, in the event of award, be made in the above account maintained in the above mentioned Bank.
Date : 00-Jan-00 Printed Name : 0
Place : 00-Jan-00 Designation : 0
[Spec. No.: SR-I/C&M/WC-4546/2026/ Rfx no.: 5002005046 (SR1/NT/W-CIVIL/DOM/B00/26/00767) ] ATTACHMENT-9
Annual Maintenance Contract (Package –II) at 765/400 KV, Vemagiri S/S for a period of Two years
(Additional Information)
Bidder’s Name and Address (Bidder) : To
Name : 0 Contract & Material
Address : 0 Power Grid Corporation of India Ltd.,
0 Southern Region -I Headquarters
0 Kavadiguda Main Road
Secunderabad - 500080 (Telangana)
In support of the additional information required as per ITB Sub-Clause 9.3 (i) of the Bidding Documents, we furnish herewith our data/details/documents etc., alongwith other information, as follows (the stipulations have been reproduced in italics for ready reference):
1.0 The Bidder shall furnish
Certificate from their Banker(s) (as per prescribed formats in Form 16, Section-VI: Sample Forms and Procedures) indicating various fund based/non fund based limits sanctioned to the Bidder and the extent of utilization as on date. Such certificate should have been issued not earlier than three months prior to the date of bid opening. Wherever necessary the Employer may make queries with the Bidders’ Bankers. [Reference ITB clause 9.3(p)(i)]
1.1 In accordance with 1.0, certificate(s) from banker as per requisite format, indicating various fund based/non fund based limits sanctioned to the bidder or each member of the joint venture and the extent of utilization as on date is/are enclosed, as per the following details:
Name of the Banker by whom certificate issued
Date of certificate (should not be earlier than 3 months prior to date of bid opening)
Whether fund based/non fund based limits are indicated in the certificate
Whether extent of utilization is indicated in the certificate
1.2 The Bidder should accordingly also provide the following information/documents
(i) Details of Banker:
Address of Banker
Contact Name and Title
(ii) As per para 1.0, Authorization Letter(s) from the bidder addressed to the Banker(s), authorizing POWERGRID to seek queries about the bidder with the Banker(s) and advising the Banker(s) to reply the same promptly, is/are enclosed as per following details:
Sl. No. Letter Ref. Date Addressed to (name of the Bank)
1.0 Litigation History
The bidder should provide detailed information on any litigation or arbitration arising out of contracts completed or under execution by it over the last five years. A consistent history of awards involving litigation against the Bidder may result in rejection of Bid.
1.1 Details of litigation history resulting from Contracts completed or under execution by the bidder over the last five years. A consistent history of awards invlolving litigation against the Bidder may result in rejection of Bid.
Year Name of client, cause of litigation/arbitration and matter in dispute Details of Contract and date Award for or against the bidder Disputed amount
3.0 Description of the plant for carrying out the work
Bidders should provide information of the plant(s) for carrying out the work including the proposal of manufacturing methods in sufficient detail to demonstrate the adequacy of the bidder’s proposals to meet the technical specification.
3.0 OTHER INFORMATION
3.1 Current Contract Commitments of works in progress
Bidders should provide information on their current commitments on all contracts that have been awarded, or for which a letter of intent or acceptance has been received, or for contracts approaching completion, but for which an unqualified, full completion certificate has yet to be issued.
Details of Contract Value of outstanding work (Rs.) Estimated completion date
3.2 Financial Data:
Figures Rs in Million
Details Actual (Previous five years) Projection for next five years
Total Liability
Current Liability
Profit before taxes
Profit after taxes
Date : 00-Jan-00 Printed Name : 0
Place : 00-Jan-00 Designation : 0
[Spec. No.: SR-I/C&M/WC-4546/2026/ Rfx no.: 5002005046 (SR1/NT/W-CIVIL/DOM/B00/26/00767) ] ATTACHMENT-10
Annual Maintenance Contract (Package –II) at 765/400 KV, Vemagiri S/S for a period of Two years
Bidder’s Name and Address (Bidder) : To
Name : 0 Sr.GM(C&M)
Address : 0 Contracts & Materials Department
0 Power Grid Corporation of India Ltd.,
0 Kavadiguda Main Road,
Secunderabad - 500 080
Integrity Pact - not applicable
Date : 00-Jan-00 Printed Name : 0
Place : 00-Jan-00 Designation : 0
Instruction for printing & submitting Integrity Pact
1. The requisite format of Integrity Pact is getting generated automatically and displayed here below.
2. Take print out of first page on a non-judicial stamp paper of Rs. 100/- and other seven pages on plain A4 size paper. Such two sets shall be prepared by the bidder.
3. All the pages of both the copies of the Integrity Pact shall be signed by the authorised representative of the bidder and duly stamped.
4. Both the original copies shall be submitted by the bidder in the form of Hard Copy as part of the first envelope before due date & time of submission of the bid.
5. For further details bidders may please refer ITB Clause 9.3 (n).
Between #REF! #REF!
Power Grid Corporation of India Limited #REF! #REF!
having its Registered Office at B-9, Qutab Institutional Area, Katwaria Sarai, New Delhi – 110016 hereinafter referred to as #REF! #REF!
"POWERGRID", #REF! #REF!
#REF! #REF! having its Registered Office at ,
hereinafter referred to as
"The Bidder/Contractor"
POWERGRID intends to award, under laid-down organisational procedures, contract(s) for Annual Maintenance Contract (Package –II) at 765/400 KV, Vemagiri S/S for a period of Two years
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Contractor)
Integrity Pact Page 1 of 8
Annual Maintenance Contract (Package –II) at 765/400 KV, Vemagiri S/S for a period of Two years Package and Specification Number [Spec. No.: SR-I/C&M/WC-4546/2026/ Rfx no.: 5002005046 (SR1/NT/W-CIVIL/DOM/B00/26/00767) ] POWERGRID values full compliance with all relevant laws and regulations, and the principles of economical use of resources, and of fairness and transparency in its relations with its Bidders/ Contractors.
In order to achieve these goals, POWERGRID and the above named Bidder/Contractor enter into this agreement called 'Integrity Pact' which will form a part of the bid.
It is hereby agreed by and between the parties as under:
Section I - Commitments of POWERGRID
(1) POWERGRID commits itself to take all measures necessary to prevent corruption and to observe the following principles :
a) No employee of POWERGRID, personally or through family members, will in connection with the tender, or the execution of the contract, demand, take a promise for or accept, for him/herself or third person, any material or other benefit which he/she is not legally entitled to.
b) POWERGRID will, during the tender process treat all Bidder(s) with equity and fairness. POWERGRID will in particular, before and during the tender process, provide to all Bidder(s) the same information and will not provide to any Bidder(s) confidential/ additional information through which the Bidder(s) could obtain an advantage in relation to the tender process or the contract execution.
c) POWERGRID will exclude from evaluation of Bids its such employee(s) who has any personnel interest in the Companies/Agencies participating in the Bidding/Tendering process.
(2) If Chairman and Managing Director obtains information on the conduct of any employee of POWERGRID which is a criminal offence under the relevant Anti-Corruption Laws of India, or if there be a substantive suspicion in this regard, he will inform its Chief Vigilance Officer and in addition can initiate disciplinary actions under its Rules.
Section II - Commitments of the Bidder/Contractor
(1) The Bidder/Contractor commits himself to take all measures necessary to prevent corruption. He commits himself to observe the following principles
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Contractor)
Integrity Pact Page 2 of 8
during his participation in the tender process and during the contract execution :
a) The Bidder/Contractor will not, directly or through any other person or firm, offer, promise or give to POWERGRID, or to any of POWERGRID's employees involved in the tender process or the execution of the contract or to any third person any material or other benefit which he/she is not legally entitled to, in order to obtain in exchange an advantage during the tender process or the execution of the contract.
b) The Bidder/Contractor will not enter into any illegal agreement or understanding, whether formal or informal with other Bidders/Contractors. This applies in particular to prices, specifications, certifications, subsidiary contracts, submission or non-submission of bids or actions to restrict competitiveness or to introduce cartelization in the bidding process.
c) The Bidder/Contractor will not commit any criminal offence under the relevant Anti-corruption Laws of India; further, the Bidder/Contractor will not use for illegitimate purposes or for purposes of restrictive competition or personal gain, or pass on to others, any information provided by POWERGRID as part of the business relationship, regarding plans, technical proposals and business details, including information contained or transmitted electronically.
d) The Bidder/Contractor of foreign origin shall disclose the name and address of the Agents/representatives in India, if any, involved directly or indirectly in the Bidding. Similarly, the Bidder/Contractor of Indian Nationality shall furnish the name and address of the foreign principals, if any, involved directly or indirectly in the Bidding.
e) The Bidder/Contractor will, when presenting his bid, disclose any and all payments he has made, or committed to or intends to make to agents, brokers or any other intermediaries in connection with the award of the contract and/or with the execution of the contract.
f) The Bidder/Contractor will not misrepresent facts or furnish false/forged documents/informations in order to influence the bidding process or the execution of the contract to the detriment of POWERGRID.
(2) The Bidder/Contractor will not instigate third persons to commit offences outlined above or be an accessory to such offences.
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Contractor)
Integrity Pact Page 3 of 8
Section III- Disqualification from tender process and exclusion from future contracts
(1) If the Bidder, before contract award, has committed a serious transgression through a violation of Section II or in any other form such as to put his reliability or credibility as Bidder into question, POWERGRID may disqualify the Bidder from the tender process or terminate the contract, if already signed, for such reason.
(2) If the Bidder/Contractor has committed a serious transgression through a violation of Section II such as to put his reliability or credibility into question, POWERGRID may after following due procedures also exclude the Bidder/Contractor from future contract award processes. The imposition and duration of the exclusion will be determined by the severity of the transgression. The severity will be determined by the circumstances of the case, in particular the number of transgressions, the position of the transgressors within the company hierarchy of the Bidder/Contractor and the amount of the damage. The exclusion will be imposed for a minimum of 12 months and maximum of 3 years.
(3) If the Bidder/Contractor can prove that he has restored/recouped the damage caused by him and has installed a suitable corruption prevention system, POWERGRID may revoke the exclusion prematurely.
Section IV - Liability for violation of Integrity Pact
(1) If POWERGRID has disqualified the Bidder from the tender process prior to the award under Section III, POWERGRID may forfeit the Bid Guarantee under the Bid.
(2) If POWERGRID has terminated the contract under Section III, POWERGRID may forfeit the Contract Performance Guarantee of this contract besides resorting to other remedies under the contract.
Section V- Previous Transgression
(1) The Bidder shall declare in his Bid that no previous transgressions occurred in the last 3 years with any other Public Sector Undertaking or Government Department that could justify his exclusion from the tender process.
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Contractor)
Integrity Pact Page 4 of 8
(2) If the Bidder makes incorrect statement on this subject, he can be disqualified from the tender process or the contract, if already awarded, can be terminated for such reason.
Section VI - Equal treatment to all Bidders / Contractors
(1) POWERGRID will enter into agreements with identical conditions as this one with all Bidders.
(2) POWERGRID will disqualify from the tender process any bidder who does not sign this Pact or violate its provisions.
Section VII - Punitive Action against violating Bidders / Contractors
If POWERGRID obtains knowledge of conduct of a Bidder or a Contractor or his subcontractor or of an employee or a representative or an associate of a Bidder or Contractor or his Subcontractor which constitutes corruption, or if POWERGRID has substantive suspicion in this regard, POWERGRID will inform the Chief Vigilance Officer (CVO).
(*)Section VIII - Independent External Monitor/Monitors
(1) POWERGRID has appointed a panel of Independent External Monitors (IEMs) for this Pact with the approval of Central Vigilance Commission (CVC), Government of India, out of which one of the IEMs has been indicated in the NIT/IFB.
(2) The IEM is to review independently and objectively, whether and to what extent the parties comply with the obligations under this agreement. He has right of access to all project documentation. The IEM may examine any complaint received by him and submit a report to Chairman-cum-Managing Director, POWERGRID, at the earliest. He may also submit a report directly to the CVO and the CVC, in case of suspicion of serious irregularities attracting the provisions of the PC Act. However, for ensuring the desired transparency and objectivity in dealing with the complaints arising out of any tendering process, the matter shall be referred to the full panel of IEMs, who would examine the records, conduct the investigations and submit report to Chairman-cum-Managing Director, POWERGRID, giving joint findings.
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Contractor)
Integrity Pact Page 5 of 8
(3) The IEM is not subject to instructions by the representatives of the parties and performs his functions neutrally and independently. He reports to the Chairman-cum-Managing Director, POWERGRID.
(4) The Bidder(s)/Contractor(s) accepts that the IEM has the right to access without restriction to all documentation of POWERGRID related to this contract including that provided by the Contractor/Bidder. The Bidder/Contractor will also grant the IEM, upon his request and demonstration of a valid interest, unrestricted and unconditional access to his documentation. The same is applicable to Subcontractors. The IEM is under contractual obligation to treat the information and documents of the Bidder(s)/Contractor(s)/Subcontractor(s) with confidentiality.
(5) POWERGRID will provide to the IEM information as sought by him which could have an impact on the contractual relations between POWERGRID and the Bidder/Contractor related to this contract.
(6) As soon as the IEM notices, or believes to notice, a violation of this agreement, he will so inform the Chairman-cum-Managing Director, POWERGRID and request the Chairman-cum-Managing Director, POWERGRID to discontinue or take corrective action, or to take other relevant action. The IEM can in this regard submit non-binding recommendations. Beyond this, the IEM has no right to demand from the parties that they act in a specific manner, refrain from action or tolerate action. However, the IEM shall give an opportunity to POWERGRID and the Bidder/Contractor, as deemed fit, to present its case before making its recommendations to POWERGRID.
(7) The IEM will submit a written report to the Chairman-cum-Managing Director, POWERGRID within 8 to 10 weeks from the date of reference or intimation to him by POWERGRID and, should the occasion arise, submit proposals for correcting problematic situations.
(8) If the IEM has reported to the Chairman-cum-Managing Director, POWERGRID, a substantiated suspicion of an offence under relevant Anti-Corruption Laws of India, and the Chairman-cum-Managing Director, POWERGRID has not, within the reasonable time taken visible action to proceed against such offence or reported it to the CVO, the Monitor may also transmit this information directly to the CVC, Government of India.
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Contractor)
Integrity Pact Page 6 of 8
(9) The word ‘IEM’ would include both singular and plural.
(*) This Section shall be applicable for only those packages wherein the IEMs have been identified in Section – I : Invitation for Bids and/or Clause ITB 9.3 in Section – III: Bid Data Sheets of Conditions of Contract, Volume-I of the Bidding Documents.
Section IX - Pact Duration
This Pact begins when both parties have legally signed it. It expires for the Contractor after the closure of the contract and for all other Bidder's six month after the contract has been awarded.
Section X - Other Provisions
(1) This agreement is subject to Indian Law. Place of performance and jurisdiction is the establishment of POWERGRID. The Arbitration clause provided in the main tender document / contract shall not be applicable for any issue / dispute arising under Integrity Pact.
(2) Changes and supplements as well as termination notices need to be made in writing.
(3) If the Contractor is a partnership firm or a consortium or Joint Venture, this agreement must be signed by all partners, consortium members and Joint Venture partners.
(4) Nothing in this agreement shall affect the rights of the parties available under the General Conditions of Contract (GCC) and Special Conditions of Contract (SCC).
(5) Views expressed or suggestions/submissions made by the parties and the recommendations of the CVO/IEM# in respect of the violation of this agreement, shall not be relied on or introduced as evidence in the arbitral or judicial proceedings (arising out of the arbitral proceedings) by the parties in connection with the disputes/differences arising out of the subject contract.
# CVO shall be applicable for packages wherein IEM are not identified in Section IFB/BDS of Condition of Contract, Volume-I. IEM shall be applicable for packages wherein IEM are identified in Section IFB/BDS of Condition of Contract, Volume-I.
(Signature) (Signature)
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Contractor)
Integrity Pact Page 7 of 8
(6) Should one or several provisions of this agreement turn out to be invalid, the remainder of this agreement remains valid. In this case, the parties will strive to come to an agreement to their original intentions.
Signature Signature
(For & On behalf of POWERGRID) (For & On behalf of Bidder/ Contractor)
(Office Seal) (Office Seal)
Designation : #REF!
Witness 1 : Witness 1 :
Designation : Designation :
Witness 2 : Witness 2 :
Designation : Designation :
Integrity Pact Page 8 of 8
[Spec. No.: SR-I/C&M/WC-4546/2026/ Rfx no.: 5002005046 (SR1/NT/W-CIVIL/DOM/B00/26/00767) ] ATTACHMENT-11
Annual Maintenance Contract (Package –II) at 765/400 KV, Vemagiri S/S for a period of Two years
Bidder’s Name and Address (Bidder) : To
Name : 0 Sr.GM(C&M)
Address : 0 Contracts & Materials Department
0 Power Grid Corporation of India Ltd.,
0 Kavadiguda Main Road,
Secunderabad - 500 080
Further, we hereby confirm that except as mentioned in the Schedule – 4 (Alternative, Deviations and Exceptions to the Provisions) hereof and/or the Covering Letter, forming part of our First Envelope :
(i) there are no discrepancies/inconsistencies and deviations/omissions/ reservations to the Bidding Documents, in the Second Envelope bid;
We also confirm that in case any discrepancies/ inconsistencies and deviations/ omissions/ reservations, as referred to in para (i) and (ii) above, is observed in the Second Envelope, the same shall be deemed as withdrawn/rectified without any financial implication, whatsoever to POWERGRID. However, in case of any arithmetical errors, the same shall be governed as per the provision of ITB Sub-Clause 27.2 read in conjunction with BDS
Date 0-Jan-1900 Printed Name 0
Place 0-Jan-1900 Designation 0
[Spec. No.: SR-I/C&M/WC-4546/2026/ Rfx no.: 5002005046 (SR1/NT/W-CIVIL/DOM/B00/26/00767) ] ATTACHMENT-10
Annual Maintenance Contract (Package –II) at 765/400 KV, Vemagiri S/S for a period of Two years
Bidder’s Name and Address (Bidder) : To
Name : 0 Sr.GM(C&M)
Address : 0 Contracts & Materials Department
0 Power Grid Corporation of India Ltd.,
0 Kavadiguda Main Road,
Secunderabad - 500 080
Safety Pact - separately attached herewith in Volume-III.
Date : 0 Printed Name : 0
Place : 0 Designation : 0
[Spec. No.: SR-I/C&M/WC-4546/2026/ Rfx no.: 5002005046 (SR1/NT/W-CIVIL/DOM/B00/26/00767) ] ATTACHMENT-13
Annual Maintenance Contract (Package –II) at 765/400 KV, Vemagiri S/S for a period of Two years
(Declaration regarding Code of Integrity for Public Procurement (CIPP) Policy of POWERGRID)
Bidder’s Name and Address (Bidder) : To
Name : 0 Sr.GM(C&M)
Address : 0 Contracts & Materials Department
0 Power Grid Corporation of India Ltd.,
0 Kavadiguda Main Road,
Secunderabad - 500 080
We hereby declare that we have read and abide by the Code of Integrity for Public Procurement (CIPP) Policy of POWERGRID, as detailed herein below:
Code of Integrity for Public Procurement: 1.1 Employer as well as bidders, suppliers, contractors and consultants should observe the highest standard of ethics and should not indulge in the following prohibited practices, either directly or indirectly, at any stage during the procurement process or during execution of resultant contracts:
i) “Corrupt practice”: making offers, solicitation or acceptance of bribe, rewards or gifts or any material benefit, in exchange for an unfair advantage in the procurement process or to otherwise influence the procurement process or contract execution; ii) “Fraudulent practice”: any omission or misrepresentation that may mislead or attempt to mislead so that financial or other benefits may be obtained or an obligation avoided. This includes making false declaration or providing false information for participation in a tender process or to secure a contract or in execution of the contract; iii) “Anti-competitive practice”: any collusion, bid rigging or anti-competitive arrangement, or any other practice coming under the purview of The Competition Act, 2002, between two or more bidders, with or without the knowledge of the Employer, that may impair the transparency, fairness and the progress of the procurement process or to establish bid prices at artificial, non-competitive levels; iv) “Coercive practice”: harming or threatening to harm, persons or their property to influence their participation in the procurement process or affect the execution of a contract;
v) “Conflict of interest”: any personal, financial, or business relationship between the bidder and any personnel of the procuring entity who are directly or indirectly related to the procurement or execution process of the contract, which can affect the decision of the procuring entity directly or indirectly. vi) “Undue Advantage”: improper use of information obtained by the bidder from the procuring entity with an intent to gain an unfair advantage in the procurement process or for personal gain. This also includes if the bidder (or his allied firm) provided services for the need assessment/ procurement planning of the tender process in which it is participating; vii) “Obstructive practice”: materially impede the Employer’s investigation into allegations of one or more of the above mentioned prohibited practices either by deliberately destroying, falsifying, altering; or by concealing of evidence material to the investigation; or by making false statements to investigators and/or by threatening, harassing or intimidating any party to prevent it from disclosing its knowledge of matters relevant to the investigation or from pursuing the investigation; or by impeding the Employer’s rights of audit or access to information.
1.2 Obligations for Proactive Disclosures i) POWERGRID as well as bidders, suppliers, contractors and consultants, are obliged under Code of Integrity for Public Procurement to suo-moto proactively declare any conflicts of interest (coming under the definition mentioned above – pre-existing or as and as soon as these arise at any stage) in any procurement process or execution of contract. Failure to do so would amount to violation of this code of integrity; and ii) Any bidder must declare, whether asked or not in a bid document, any previous transgressions of such a code of integrity with any entity in any country during the last three years or of being debarred by any other procuring entity. Failure to do so would amount to violation of this code of integrity. iii) To encourage voluntary disclosures, such declarations would not mean automatic disqualification for the bidder making such declarations. The declared conflict of interest may be evaluated and mitigation steps, if possible, may be taken by POWERGRID. Similarly voluntary reporting of previous transgressions of Code of Integrity elsewhere may be evaluated and barring cases of various grades of debarment, an alert watch may be kept on the bidder’s actions in the tender and subsequent contract.
1.3 Punitive Provisions: Without prejudice to and in addition to the rights of POWERGRID to other penal provisions as per the Bidding Documents or Contract, if POWERGRID comes to a conclusion that a (prospective) bidder/supplier, directly or through an agent, has violated this code of integrity in competing for the contract or in executing a contract, POWERGRID may take appropriate measures including one or more of the following: i) if the bid(s) is under consideration in any procurement a) Forfeiture or encashment of Bid Security b) calling off of any pre-contract negotiations, and; c) rejection and exclusion of the bidder from the procurement process ii) if a contract has already been awarded a) Cancellation/termination of the contract in question; b) Forfeiture or encashment of Contract Performance Guarantee (CPG) of the contract in question; iii) Provisions in addition to above: a) Removal from the list of registered suppliers and banning/debarment of the bidder/contractor from participation in future procurements in line with POWERGRID’s policy for “Black-Listing of Firms / Banning of Business”. b) In case of anti-competitive practices, information for further processing may be filed with the Competition Commission of India; c) Initiation of suitable disciplinary or criminal proceedings against any individual or staff found responsible.
1.4 In pursuance to this policy, the Employer will have the right to require that the provision be included in Bidding Documents and in contracts, requiring Bidders, suppliers, and contractors and their sub-contractors to permit the Employer to inspect their accounts and records and other documents relating to bid submission and contract performance under this project only and to have them audited by auditors appointed by the Employer.
Further, we hereby confirm that incase of transgression of CIPP, we are aware that we may get delisted from Registered Suppliers / Contractors and POWERGRID may take other punitive actions such as Cancellation of Contracts, Banning and Blacklisting or action in Competition Commission of India etc.
We hereby confirm that we observe the highest standard of ethics and shall not indulge in the following prohibited practices, either directly or indirectly, at any stage during the procurement process or during execution of resultant contracts:
i) Corrupt Practice
ii) Fradulent Practice
iii) Anti-competitive Practice
iv) Coercive Practice
v) Conflict of Interest
vi) Obstructive Practice
Date 0-Jan-1900 Printed Name 0
Place 0-Jan-1900 Designation 0
[Spec. No.: SR-I/C&M/WC-4546/2026/ Rfx no.: 5002005046 (SR1/NT/W-CIVIL/DOM/B00/26/00767) ] ATTACHMENT-15
Annual Maintenance Contract (Package –II) at 765/400 KV, Vemagiri S/S for a period of Two years
(Declaration by the Bidder for 'POWERGRID Whistle Blower and Fraud Prevention Policy')
Bidder’s Name and Address (Bidder) : To
Name : 0 Sr.GM(C&M)
Address : 0 Contracts & Materials Department
0 Power Grid Corporation of India Ltd.,
0 Kavadiguda Main Road,
Secunderabad - 500 080
We hereby declare that we, along with our associate/ collaborators/ sub-contractors/ sub-vendors/consultants/ service providers shall strictly adhere to the 'POWERGRID Whistle Blower and Fraud Prevention Policy'.
We, along with our associate / collaborator / subcontractors / sub-vendors / consultants / service providers shall observe the highest standard of ethics and shall not indulge or allow anybody else working in our organization to indulge in fraudulent activities during execution of the contract and would immediately apprise the Employer about any fraud or suspected fraud as soon as it comes to their notice.
Date 0-Jan-1900 Printed Name 0
Place 0-Jan-1900 Designation 0
[Spec. No.: SR-I/C&M/WC-4546/2026/ Rfx no.: 5002005046 (SR1/NT/W-CIVIL/DOM/B00/26/00767) ] Bid Form-1st Envelope
Bid Proposal Ref. No.
Power Grid Corporation of India Ltd.,
Southern Region -I Headquarters
Kavadiguda Main Road
Secunderabad - 500080 (Telangana)
Name of Contract : Annual Maintenance Contract (Package –II) at 765/400 KV, Vemagiri S/S for a period of Two years
Dear Ladies and/or Gentlemen,
1.0 Having examined the Bidding Documents, including Amendments the receipt of which is hereby acknowledged, we the undersigned, offer to execute the work under the above-named package in full conformity with the said Bidding Documents. In accordance with ITB Clause 3.2 of the Bidding Documents, as per which the bid shall be submitted by the bidder under “Single Stage - Two Envelope” procedure of bidding. Accordingly, we hereby submit our Bid consisting of Techno – Commercial Part & Price Parts.
2.0 Attachments to the Bid Form
In line with the requirement of the Bidding Documents, we enclose herewith the following Attachments:
(a) Attachment 1 Bid Security, in a separate envelope, for a sum of Rs. 61,000 (Rs. Sixty One Thousand only) initially valid for a period of Seven (7) months from the date set for opening of bids.
(b) Attachment 2 A power of attorney duly authorized by a Notary Public indicating that the person(s) signing the bid have the authority to sign the bid and thus that the bid is binding upon us during the full period of its validity in accordance with the ITB Clause 6.
(c) Attachment 3 Bidder’s Eligibility and Qualifications
(d) Attachment 4 The variation and deviations from the requirements of the Conditions of Contract, Technical Specification and Drawings in your format enclosed with the Bidding Documents, including, inter alia, the cost of withdrawal of the variations and deviations indicated therein
(e) Attachment 5 Work Completion Schedule.
(f) Attachment 6 Information regarding ex-employees of Employer in Bidder’s firm.
(g) Attachment 7 Declaration regarding Social Accountability
(h) Attachment 8 Information for E – payment, PF details and declaration for Micro/Small and Medium Enterprise
(i) Attachment 9 Additional Information
(j) Attachment 10 Integrity Pact
(k) Attachment 11 Declaration
(l) Attachment 12 Safety Pact
(m) Attachment 13 Declaration for Code of Integrity for Public Procurement (CIPP) Policy of POWERGRID.
(n) Attachment 14 Declaration in regard to bid capacity.
(o) Attachment 15 Declaration for 'POWERGRID Whistle Blower and Fraud Prevention Policy'.
(p) Attachment 21 Affidavit for self-certifictaion PPP-MII
(q) Attachment 23 Compliance to the process related to the e-RA
(r) Attachment 26 Certification by the Bidder per DoE Order
(s) Attachment 28 Bid Declaration
3.0 We are aware that our bid is liable to be rejected in case the same contains any deviation/omission from the contractual and commercial conditions and technical Specifications other than those identified in the bid documents.
3.2 We declare that as specified in Bidding Documents, the RATES of all the Goods to be supplied under this contract shall remain FIRM during the currency of the contract and no price adjustment shall be applicable..
4.0 We confirm that except as otherwise specifically provided our Bid Prices include all taxes, duties, levies and charges as may be assessed on us, our Sub-Contractor/Sub-Vendor or their employees by all municipal, state or national government authorities in connection with the Facilities, in and outside of India.
4.1 100% of applicable Taxes and Duties i.e. GST, which are payable by the Employer under the Contract, shall be reimbursed by the Employer on production of satisfactory documentary evidence by the Contractor in accordance with the provisions of the Bidding Documents
4.3 We confirm that we have also registered/we shall also get registered in the GST Network with a GSTIN, in all the states where the project is located and the states from which we shall make our supply of goods.
5.0 Construction of the Contract
5.1 We declare that we have studied the mode of contracting for Domestic Bidders and we are making this proposal with a stipulation that you shall award us Single Contract covering all goods and related services.
6.0 We have read the various clauses and provisions in bid documents and confirm that all the specified stipulations are acceptable to us.
Further we understand that deviation taken in any of the above clauses by us shall make our bid non-responsive as per provision of bidding documents and rejected by you.
7.0 We undertake, if our bid is accepted, to commence the work immediately upon your Notification/Letter of Award to us, and to achieve the completion of works and related services within the time stated in the Bidding Documents.
8.0 If our bid is accepted, we undertake to provide a Performance Security in the form and amounts, and within the times specified in the Bidding Documents.
9.0 We agree to abide by this bid for a period of Six (06) months from the date initially stipulated for opening of bids as stipulated in the Bidding Documents, and it shall remain binding upon us and may be accepted by you at any time before the expiration of that period
10.0 Until a formal Contract is prepared and executed between us, this bid, together with your written acceptance thereof in the form of your Notification of Award shall constitute a binding contract between us.
11.0 We understand that you are not bound to accept the lowest or any bid you may receive.
12.0 We, hereby, declare that only the persons or firms interested in this proposal as principals are named here and that no other persons or firms other than those mentioned herein have any interest in this proposal or in the Contract to be entered into, if the award is made on us, that this proposal is made without any connection with any other person, firm or party likewise submitting a proposal is in all respects for and in good faith, without collusion or fraud.
(a) Annual Maintenance Contract (Package –II) at 765/400 KV, Vemagiri S/S for a period of Two years
13.5 We declare that items left blank in the Schedules will be deemed to have been included in other items. The TOTAL for each Schedule and the TOTAL of Grand Summary shall be deemed to be the total price for executing the Facilities and sections thereof in complete accordance with the Contract, whether or not each individual item has been priced.
15 Further, we hereby confirm that except as mentioned in the Attachment -4 (Deviations) hereof:
(i) there are no discrepencies/inconsistencies and deviations/omissions/reservations to the Bidding Documents,;
16 We also confirm that in case any discrepencies/inconsitencies and deviations/omissions/reservations, as referred to in para (i) and (ii) above, is observed, the same shall be deemed as withdrawn/rectified without any finacial implication, whatsoever to POWERGRID. However, in case of any artithmetical errors, the same shall be governed as per the provisions of ITB
We, hereby, declare that only the persons or firms interested in this proposal as principals are named here and that no other persons or firms other than those mentioned herein have any interest in this proposal or in the Contract to be entered into, if the award is made on us, that this proposal is made without any connection with any other person, firm or party likewise submitting a proposal is in all respects for and in good faith, without collusion or fraud.
Thanking you, we remain,
Yours faithfully,
For and on behalf of
Date : 00-Jan-00 Printed Name : 0
Place : 00-Jan-00 Designation : 0
Please provide additional information of the Bidder
Business Address :
Country of Incorporation :
State/Province to be indicated :
Name of Principal Officer :
Address of Principal Officer :
Note: Bidders may note that no prescribed proforma has been enclosed for Attachment 2 : Power of Attorney. Bidders may use their own proforma for furnishing the required information with the bid.
USD One Lac Fifty Five Thousand Eight Hundred Eighty Five Only EURO Four Thousand Nine Hundred Sixty Only RMB Ten Thousand Three Hundred Fifty Two Only INR Six Lac Ninety One Thousand Six Hundred Forty Seven Only USD 155885/- + EURO 4960/- + RMB 10352/- + INR 691647/-
USD One Lac Fifty Five Thousand Eight Hundred Eighty Five Only plus EURO Four Thousand Nine Hundred Sixty Only plus RMB Ten Thousand Three Hundred Fifty Two Only plus INR Six Lac Ninety One Thousand Six Hundred Forty Seven Only
85 Eighty Five 60 Sixty 52 Fifty Two 47 Forty Seven
8 Eight Hundred 9 Nine Hundred 3 Three Hundred 6 Six Hundred
55 Fifty Five Thousand 4 Four Thousand 10 Ten Thousand 91 Ninety One Thousand 0 0 0 0 0 plus
1 One Lac 0 0 6 Six Lac 0 0 0 0 1
1 One 1 One 1 One 1 One 0 0 1 0 1
2 Two 2 Two 2 Two 2 Two 0 0 1 1 0
3 Three 3 Three 3 Three 3 Three 0 0 1 1 1
4 Four 4 Four 4 Four 4 Four 0 1 0 0 0
5 Five 5 Five 5 Five 5 Five 0 1 0 0 1
6 Six 6 Six 6 Six 6 Six 0 1 0 1 0
7 Seven 7 Seven 7 Seven 7 Seven 0 1 0 1 1
8 Eight 8 Eight 8 Eight 8 Eight 0 1 1 0 0
9 Nine 9 Nine 9 Nine 9 Nine 0 1 1 0 1
10 Ten 10 Ten 10 Ten 10 Ten 0 1 1 1 0
11 Eleven 11 Eleven 11 Eleven 11 Eleven 1 1 1 1 1 USD One Lac Fifty Five Thousand Eight Hundred Eighty Five Only plus EURO Four Thousand Nine Hundred Sixty Only plus RMB Ten Thousand Three Hundred Fifty Two Only plus INR Six Lac Ninety One Thousand Six Hundred Forty Seven Only
12 Twelve 12 Twelve 12 Twelve 12 Twelve
13 Thirteen 13 Thirteen 13 Thirteen 13 Thirteen
14 Fourteen 14 Fourteen 14 Fourteen 14 Fourteen
15 Fifteen 15 Fifteen 15 Fifteen 15 Fifteen
16 Sixteen 16 Sixteen 16 Sixteen 16 Sixteen 0 0 0 0 0 +
17 Seventeen 17 Seventeen 17 Seventeen 17 Seventeen 0 0 0 0 1 /- +
18 Eighteen 18 Eighteen 18 Eighteen 18 Eighteen 0 0 0 1 0 /-
19 Nineteen 19 Nineteen 19 Nineteen 19 Nineteen 0 0 0 1 1
20 Twenty 20 Twenty 20 Twenty 20 Twenty 0 0 1 0 0
21 Twenty One 21 Twenty One 21 Twenty One 21 Twenty One 0 0 1 0 1
22 Twenty Two 22 Twenty Two 22 Twenty Two 22 Twenty Two 0 0 1 1 0
23 Twenty Three 23 Twenty Three 23 Twenty Three 23 Twenty Three 0 0 1 1 1
24 Twenty Four 24 Twenty Four 24 Twenty Four 24 Twenty Four 0 1 0 0 0
25 Twenty Five 25 Twenty Five 25 Twenty Five 25 Twenty Five 0 1 0 0 1
26 Twenty Six 26 Twenty Six 26 Twenty Six 26 Twenty Six 0 1 0 1 0
27 Twenty Seven 27 Twenty Seven 27 Twenty Seven 27 Twenty Seven 0 1 0 1 1
28 Twenty Eight 28 Twenty Eight 28 Twenty Eight 28 Twenty Eight 0 1 1 0 0
29 Twenty Nine 29 Twenty Nine 29 Twenty Nine 29 Twenty Nine 0 1 1 0 1
30 Thirty 30 Thirty 30 Thirty 30 Thirty 0 1 1 1 0
31 Thirty One 31 Thirty One 31 Thirty One 31 Thirty One 1 1 1 1 1 USD 155885/- + EURO 4960/- + RMB 10352/- + INR 691647/-
32 Thirty Two 32 Thirty Two 32 Thirty Two 32 Thirty Two
33 Thirty Three 33 Thirty Three 33 Thirty Three 33 Thirty Three
34 Thirty Four 34 Thirty Four 34 Thirty Four 34 Thirty Four
35 Thirty Fivr 35 Thirty Fivr 35 Thirty Fivr 35 Thirty Fivr
36 Thirty Six 36 Thirty Six 36 Thirty Six 36 Thirty Six
37 Thirty Seven 37 Thirty Seven 37 Thirty Seven 37 Thirty Seven
38 Thirty Eight 38 Thirty Eight 38 Thirty Eight 38 Thirty Eight
39 Thirty Nine 39 Thirty Nine 39 Thirty Nine 39 Thirty Nine
40 Forty 40 Forty 40 Forty 40 Forty
41 Forty One 41 Forty One 41 Forty One 41 Forty One
42 Forty Two 42 Forty Two 42 Forty Two 42 Forty Two
43 Forty Three 43 Forty Three 43 Forty Three 43 Forty Three
44 Forty Four 44 Forty Four 44 Forty Four 44 Forty Four
45 Forty Five 45 Forty Five 45 Forty Five 45 Forty Five
46 Forty Six 46 Forty Six 46 Forty Six 46 Forty Six
47 Forty Seven 47 Forty Seven 47 Forty Seven 47 Forty Seven
48 Forty Eight 48 Forty Eight 48 Forty Eight 48 Forty Eight
49 Forty Nine 49 Forty Nine 49 Forty Nine 49 Forty Nine
50 Fifty 50 Fifty 50 Fifty 50 Fifty
51 Fifty One 51 Fifty One 51 Fifty One 51 Fifty One
52 Fifty Two 52 Fifty Two 52 Fifty Two 52 Fifty Two
53 Fifty Three 53 Fifty Three 53 Fifty Three 53 Fifty Three
54 Fifty Four 54 Fifty Four 54 Fifty Four 54 Fifty Four
55 Fifty Five 55 Fifty Five 55 Fifty Five 55 Fifty Five
56 Fifty Six 56 Fifty Six 56 Fifty Six 56 Fifty Six
57 Fifty Seven 57 Fifty Seven 57 Fifty Seven 57 Fifty Seven
58 Fifty Eight 58 Fifty Eight 58 Fifty Eight 58 Fifty Eight
59 Fifty Nine 59 Fifty Nine 59 Fifty Nine 59 Fifty Nine
60 Sixty 60 Sixty 60 Sixty 60 Sixty
61 Sixty One 61 Sixty One 61 Sixty One 61 Sixty One
62 Sixty Two 62 Sixty Two 62 Sixty Two 62 Sixty Two
63 Sixty Three 63 Sixty Three 63 Sixty Three 63 Sixty Three
64 Sixty Four 64 Sixty Four 64 Sixty Four 64 Sixty Four
65 Sixty Five 65 Sixty Five 65 Sixty Five 65 Sixty Five
66 Sixty Six 66 Sixty Six 66 Sixty Six 66 Sixty Six
67 Sixty Seven 67 Sixty Seven 67 Sixty Seven 67 Sixty Seven
68 Sixty Eight 68 Sixty Eight 68 Sixty Eight 68 Sixty Eight
69 Sixty Nine 69 Sixty Nine 69 Sixty Nine 69 Sixty Nine
70 Seventy 70 Seventy 70 Seventy 70 Seventy
71 Seventy One 71 Seventy One 71 Seventy One 71 Seventy One
72 Seventy Two 72 Seventy Two 72 Seventy Two 72 Seventy Two
73 Seventy Three 73 Seventy Three 73 Seventy Three 73 Seventy Three
74 Seventy Four 74 Seventy Four 74 Seventy Four 74 Seventy Four
75 Seventy Five 75 Seventy Five 75 Seventy Five 75 Seventy Five
76 Seventy Six 76 Seventy Six 76 Seventy Six 76 Seventy Six
77 Seventy Seven 77 Seventy Seven 77 Seventy Seven 77 Seventy Seven
78 Seventy Eight 78 Seventy Eight 78 Seventy Eight 78 Seventy Eight
79 Seventy Nine 79 Seventy Nine 79 Seventy Nine 79 Seventy Nine
80 Eighty 80 Eighty 80 Eighty 80 Eighty
81 Eighty One 81 Eighty One 81 Eighty One 81 Eighty One
82 Eighty Two 82 Eighty Two 82 Eighty Two 82 Eighty Two
83 Eighty Three 83 Eighty Three 83 Eighty Three 83 Eighty Three
84 Eighty Four 84 Eighty Four 84 Eighty Four 84 Eighty Four
85 Eighty Five 85 Eighty Five 85 Eighty Five 85 Eighty Five
86 Eighty Six 86 Eighty Six 86 Eighty Six 86 Eighty Six
87 Eighty Seven 87 Eighty Seven 87 Eighty Seven 87 Eighty Seven
88 Eighty Eight 88 Eighty Eight 88 Eighty Eight 88 Eighty Eight
89 Eighty Nine 89 Eighty Nine 89 Eighty Nine 89 Eighty Nine
90 Ninety 90 Ninety 90 Ninety 90 Ninety
91 Ninety One 91 Ninety One 91 Ninety One 91 Ninety One
92 Ninety Two 92 Ninety Two 92 Ninety Two 92 Ninety Two
93 Ninety Three 93 Ninety Three 93 Ninety Three 93 Ninety Three
94 Ninety Four 94 Ninety Four 94 Ninety Four 94 Ninety Four
95 Ninety Five 95 Ninety Five 95 Ninety Five 95 Ninety Five
96 Ninety Six 96 Ninety Six 96 Ninety Six 96 Ninety Six
97 Ninety Seven 97 Ninety Seven 97 Ninety Seven 97 Ninety Seven
98 Ninety Eight 98 Ninety Eight 98 Ninety Eight 98 Ninety Eight
99 Ninety Nine 99 Ninety Nine 99 Ninety Nine 99 Ninety Nine
100 One Hundred 100 One Hundred 100 One Hundred 100 One Hundred
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
23 Twenty Three
27 Twenty Seven
28 Twenty Eight
33 Thirty Three
37 Thirty Seven
38 Thirty Eight
73 Seventy Three
74 Seventy Four
75 Seventy Five
77 Seventy Seven
78 Seventy Eight
79 Seventy Nine
83 Eighty Three
87 Eighty Seven
88 Eighty Eight
93 Ninety Three
97 Ninety Seven
98 Ninety Eight
100 One Hundred
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html
Price_Schedule.xlsx
xlsx • 0.23 MB
1-10_Safety Pact.docx
docx • 0.03 MB
1-1_Section-I_IFB.docx
docx • 0.09 MB
1-2_Section-II-ITB.docx
docx • 0.14 MB
1-3_Section-III-QR.docx
docx • 0.08 MB
1-4 General Terms and Conditions.docx
docx • 0.08 MB
1-5A Specification and special Terms and conditions.docx
docx • 0.06 MB
1-5B-Model Rules & Safety Code.doc
doc • 0.09 MB
1-5C_Social Accountability 8000.docx
docx • 0.03 MB
1-5D-Registers.pdf
pdf • 0.12 MB
1-6_Section-VI-Forms and Procedures.doc
doc • 0.08 MB
1-7_SFQP Civil Works for Site Packages rev 05.pdf
pdf • 2.86 MB
Bid Form n Atts.xlsx
xlsx • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .