Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
Refer Docs
Closing Date
18 Feb 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Regional Officer
Regional Office, Gandhinagar
Consultancy services for preparation of DPR for Upgradation to two lanes with paved shoulder of NH-953 from Km 0.00 (Songarh, Junction with NH-53) to Km 61.658 (Ahwa) in the State of Gujarat
2026_MoRTH_892562_1
NIT.NO. RW/DPR/NH-953
Open Tender
Consultancy
Works
450 days
Ahwa
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
Bharatkosh
Exempted
Regional Office, Gandhinagar
30 Jan 2026
5 Jan 2026
19 Feb 2026
5 Jan 2026
18 Feb 2026
2 Feb 2026
30 Jan 2026
Local Consultants Remuneration for Local Professional Staff (inclusive of per diem allowance)
Support Staff (inclusive of per diem allowance)
Transportation
Duty Travel to Site
Office Rent
Office Supplies, Utilities and Communication
Office Furniture and Equipment (Rental)
Reports and Document Printing
Topographical Survey
Investigations
Net work survey and GPR
Cost of supply and fixining boundary pillars
Land acquisition Team including support staff and logistics/transportation
Sub Total for Local Consultants
Foreign Consultants
Remuneration for Expatriate Staff
Mobilization and Demobilization
Total Cost net of Tax:
Taxes & Duties
Income Tax (Expariate)
Other Taxes / Duties (if any) Specify clearly
Total Cost net of GST:
Sub Total Including GST
Item Rate BoQ
BoQ_Ver3.0
Bidder Name :
PRICE SCHEDULE (FORM -III) - I Estimate of Local Currency Costs REMUNERATION FOR LOCAL PROFESSIONAL STAFF
NUMBER #
Team Leader cum Senior Highway Engineer
Senior Bridge Engineer
Highway cum Pavement Engineer
Material-cum-Geotechnical Engineer
Senior Survey Engineer
Traffic and Safety Expert
Environmental Specialist
Quantity Surveyor/Documentation Expert
Land Acquisition Expert
Utility Expert
Sub Total
B: Sub Professional Staff (To be assessed by Consultant as per requirement of assignment)
STAFF 1
STAFF 2
STAFF 3
STAFF 4
STAFF 5
STAFF 6
STAFF 7
Sub Total
Item Rate BoQ
BoQ_Ver3.0
Bidder Name :
BREAKDOWN OF COSTS (Form -III ) II 2. Support Staff
NUMBER #
Office Manager
Typist
Office Boy
Night Watchman
Item Rate BoQ
BoQ_Ver3.0
Bidder Name :
BREAKDOWN OF COSTS (FORM -III) III 3.Transportation (Fixed Cost)
NUMBER #
The vehicles provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. A. For use of consultants
Item Rate BoQ
BoQ_Ver3.0
Bidder Name :
BREAKDOWN OF COSTS (FORM-III) IV 4.Duty Travel to Site (Fixed Costs)
NUMBER #
Duty Travel to Site
Item Rate BoQ
BoQ_Ver3.0
Bidder Name :
BREAKDOWN OF COSTS (FORM -III) V 50.Office Rent (Fixed Costs)
NUMBER #
The rent cost includes maintenance, Cleaning, repairs, etc.
Item Rate BoQ
BoQ_Ver3.0
Bidder Name :
(FORM-III) VI 60. Office Supplies, Utilities and Communication ( Fixed Costs )
NUMBER #
Office Supplies Drafting
Supplies computer
Computer Running Costs
Domestic and International Communication
Item Rate BoQ
BoQ_Ver3.0
Bidder Name :
(FORM -III) VII 70. Office Furniture and Equipment ( Rental ) [ Fixed monthly cost ]
NUMBER #
Office Furniture and Equipment
Item Rate BoQ
BoQ_Ver3.0
Bidder Name :
PRICE SCHEDULE (FORM _III) VIII 80.Reports and Document Printing
NUMBER #
Monthly Report (per month)
Inception Report & QAP
Environment and Social Impact Screening Report
Draft Feasibility Report
Final Feasibility Report
Strip Plan with L.A. Reports
Draft LA and Clearances I Report
Final LA and Clearances I Report
Draft Environmental Assessment report & RAP
Final Environmental Assessment report & RAP
Draft Detailed Design Report & Drawings etc.
Draft EMP
Draft Bidding Documents
Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings ,etc
Final EMP
Final Bidding Documents
Draft 3(a) ,3(A) and 3(D) notification for land acquisition ( 3 copies each)
LA & Clearances II Report
Item Rate BoQ
BoQ_Ver3.0
Bidder Name :
Survey and Investigation
NUMBER #
Topographic Survey including hire charges for equipment and supply of survey Teams comprising of project survey field staff etc. inclusive of cost of materials , labourer.
Detailed Topographic surveys using mobile /aerial LiDAR or betterTechnology.
Item Rate BoQ
BoQ_Ver3.0
Bidder Name :
X Cost of supply and fixing boundary pillars
NUMBER #
Procuring and Fixing boundary pillars and its installation , complete in all respect as per IRC:25,1967:Whereve the proposed alignment follows the exissting alignment, the boundary pillars shall be fixed at an interaval of 200m on either side of proposed right of way. Wherever there is a proposal of realignment of the existing Highway and/or construction of new bypass, consutant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway at 50 m interval (lumsum)
Item Rate BoQ
BoQ_Ver3.0
Bidder Name :
PRICE SCHEDULE (FORM -III) - I Estimate of Local Currency Costs REMUNERATION FOR LOCAL PROFESSIONAL STAFF
NUMBER #
Ex-Land revenue inspector/officer/equivalent
EX-kanoogo/Girdwar or equivalent
Ex-Patwari or equivalent
typist
Total
Number of land acquisition teams (ONE ONLY )
Grand total for all Land Acquisition teams (A)
B: Logistic for Land Acquisition Team :
computer including necessary peripherals
printers
Vehicles(Bolero or equivalent )with monthly running limit of 4000 km
Total
Number of land acquisition teams (ONE ONLY )
Grand Total (B)
Grand total for all Land Acquisition teams And Logistics (A) + (B)
Item Rate BoQ
BoQ_Ver3.0
Bidder Name :
B. Investigation (Fixed cost)
NUMBER #
Road and Bridge Inventory
FWD Test and Pavement Evaluation
Roughness Survey
Axle Load Survey
Material Survey and Investigation
Sub-grade Investigation
Traffic Survey
Socio-economic & Census Survey/ Studies
Land Acquisition Studies
Any other investigations/surveys
Sub Total
Sub-Soil Investigation (Boring)
a) Boring in all type of soils (other than hard rock) ,(for project of length <110km ) or 2000m( for project of length >110 km ) ,Qty. in m.
b)Boring in hard rock ,(for project of length <110km ) or 300m( for project of length >110 km ) ,Qty. in m.
Sub Total
Item Rate BoQ
BoQ_Ver3.0
Bidder Name :
C. NET WORK SURVEY AND GPR
NUMBER #
Net work Survey of the existing Highways as a responsitory for civil work as per direction from Authority
GPR Survey for detection of under ground utilities
Item Rate BoQ
BoQ_Ver3.0
Bidder Name :
Estimate of Cost for Expatriate Consultants (INR) Remuneration of Exptriate staff including per diem allowances
NUMBER #
Staff 1
Staff 2
Staff 3
Staff 4
Staff 5
Staff 6
Item Rate BoQ
BoQ_Ver3.0
Bidder Name :
International Airfares (Fixed Cost) Mobilization and Demobilization 1. International Airfares (Fixed costs)
NUMBER #
Lump sum
2. Inland Travel in Home Country (Fixed Costs)
Description Lump Sum RATE Amount
Lump sum
3. Other Miscellaneous expenses ( like DA, internal travel expenses other incidentals)(fixed cost)
Description Lump Sum RATE Amount
Lump sum
Sub Total for Mobilization and Demobilization
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.15 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.13 MB
BOQ_938157.xls
BOQ • 0.63 MB
RFP.pdf
Tender Documents • 4.76 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .