Loading…
Loading…
Tender ID
Tender Value
Refer Docs
EMD Value
₹2,914
Closing Date
27 Apr 2026, 1:00 pmClosed
Resident Engineer
Larji PH Division HPSEBL Thalout
Tender for complete repair of different Electronics Modules DC Power Supply, AVR Cards of Governor control panel at 3x 1.5 MW Thirot Power House under the Resident Engineer, Larji Power House Division HPSEBL, Thalout.
2026_HPSEB_134698_1
HPSEBL/RELPHD/DB-10/ 2026-27-02
Open Tender
Repair and Maintenance Services
Percentage
30 days
Thalout
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
₹2,914
3 Jun 2026
20 Apr 2026
27 Apr 2026
20 Apr 2026
27 Apr 2026
20 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Repair of DC power supply/electronic module make BHEL 6EV2200-5DC by replacing their worn-out components and restoring required input/output voltages (380volt, 440volt/15volt, 24volt) and repairs shall be carried out in accordance with standards and as per industry best practices.
(i) Post-repair inspection, calibration, and functional verification shall be conducted to confirm performance at contractor workshop.
(ii) Comprehensive testing shall be performed to ensure stable and reliable operation under load conditions. thereafter Successful testing and trial at Thirot power-house.
(iii) All safety checks shall be ensured prior to commissioning at site. Necessary installation checks, including proper connections and earthing, shall be carried out before energization. Final acceptance shall be subject to satisfactory performance and approval by the concerned authority after successful commissioning at site. | - | Job | - | - |
| 2 | Repair of AVR card/electronic module (BHEL PC02000191) including control and firing circuits of by replacing worn-out components, as per industry standards and best practices.
(i) Post-repair inspection, calibration, and functional verification will be done at the contractor's workshop.
(ii) Comprehensive testing will ensure stable and reliable operation under load, followed by successful testing and trial at Thirot power-house.
(iii) All safety checks will be completed before commissioning. Proper installation, connections and earthing, will be verified prior to energization. Final acceptance will be subject to satisfactory performance and approval by the engineer Incharge after successful site commissioning. | - | Job | - | - |
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.41 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.10 MB
tenderdoc2.pdf
Tender Documents • 0.47 MB
BOQ_199340.xls
BOQ • 0.27 MB
Corr3.pdf
PDF • 0.33 MB
Corr2.pdf
PDF • 0.39 MB
Corridated.pdf
PDF • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .