Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.9 LAccepted-AOC GEETA COTTAGE NO 3 HOUSE NO 11 OPP CIVIL AIR PORT BHUJ KUTCH 370001 | KACHCHH | GUJARAT | 370001 | ₹16.9 L | L1 | Accepted-AOC LOWEST BIDDER |
| 2 | L2₹18.6 LRejected-Finance PLOT NO 86 SHIVAM PARK 2 AIR PORT ROAD BEHIND SANATAN MANDIR BHUJ KUTCH 370001 | BHUJ | KUTCH | GUJARAT | 370001 | ₹18.6 L | L2 | Rejected-Finance NOT LOWEST BIDDER |
| 3 | L3₹19.2 LRejected-Finance HOUSE NO1201 NEAR HANUMAN MANDIR AT POST SHEL PIMPALGAON TAL KHED DIST PUNE PIN 410 501 | PALGHAR | MAHARASHTRA | 410501 | ₹19.2 L | L3 | Rejected-Finance NOT LOWEST BIDDER |
| 4 | L4₹21.7 LRejected-Finance C O BHAGYODAY STORES BAZAR CHOWK NALIYA KUTCH 370 655 | KACHCHH | GUJARAT | 370655 | ₹21.7 L | L4 | Rejected-Finance NOT LOWEST BIDDER |
| 5 | Rejected-Technical SHOP NO 02 DADA COMPLEX NEAR DENA BANK NALIYA TAL ABDASA KUTCH GUJRAT 370 655 | KACHCHH | GUJARAT | 370655 | - | - | Rejected-Technical NOT APPROVED FOR OPENING OF F BID |
| Sl No | Description | Qty | Unit | AARTI ENTERPRISES L1 | Krishna Engineering L4 | M/s. AMIT ASSOCIATES L3 | JYOTI TRADERS L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | Comprehensive annual maintenance contract services at WSA-I for one year of 12 months for and including following Items:-
(i) Water Cooled Scroll Chillers 03 Qty Blue Star XWC3S-039AR2, Refnigerant:- R407C, 26 KG, No. of Compressors:- 3 Nos, Compressors Dantoss :- 03 Nos, Model of Compressors:- Scrol, SZ185S4RC, DX type chiller with 03 circuit (ii) Chilled water pump, CT Pumps :- 5HP 3 Qty, Kirloskar monoblock pump 5 hp, CHW Pumps :- 5HP 3 Qty, Kirloskar monoblock pump 5 hp (iii) Delta make cooling towers 40 TR (iv) AIRHANDLING UNIT AND FANCOIL UNIT 02 Oty of Zeco, Model:- ZDS 80, CFM:-7100 CFM 5.5 KW Motor including replenishment of refrigerent gas and carrying out preventive maintenance as per standard practice four times in a year with scope of work as per Notes hereunder for complete serviceability of all units throughout the year all as specified and directed. | 4 | Each Quarter | 2,23,000 ₹8.9 L | 2,84,000 ₹11.4 L | 2,50,000 ₹10 L | 2,40,000 ₹9.6 L |
| 2.00 | Comprehensive annual maintenance contract services at 2257 Sqn for one year of 12 months for and including following Items:-
(i) Air Cooled Scroll Chillers 03 Qty of Blue Star XACS3036MA-36TR, Refnigerant:- R22, CHARGE :- 27 KG ,No. of Compressors:-3 Nos, Compressors Dantoss :- 03 Nos, Model Of Compressors:- Scroll, SM18554RC, DX type chiller with 03 circuit, 03 Nos Condenser fan motor in one Unit (ii) Chilled water pump, CHW Pumps:-5HP 2W+1S=3 Qty Crompton monoblock pump 5 hp (iii) AIRHANDLING UNIT AND FANCOIL UNIT 01 Oty of, Zeco, Model :- DHVW-220-C CFM:- 12904 CFM 10HP Motor including replenishment of refrigerent gas and carrying out preventive maintenance as per standard practice four times in a year with scope of work as per Notes hereunder for complete serviceability of all units throughout the year all as specified and directed. | 4 | Each Quarter | 2,00,000 ₹8 L | 2,58,000 ₹10.3 L | 2,30,000 ₹9.2 L | 2,25,000 ₹9 L |
| 2.01Notes Applicable for item No.1 and 2:- (i) Inspecting the plant system and carry out preventive maintenance as per the standard practice four times a year (Each quarter -First Month). (ii) Checking the refrigeration system, motor and starters and ensuring healthy condition of the plant. (iii) Checking the system for any leaks and rectification of leaks if found (iv) Taking set of readings and evaluating to ensure satisfactory performance of the plant during First month of each quarter. (v) Checking the Refrigeration control system for operation and adjusting the settings.(vi) Descaling the condensers for water-cooled units if found necessary.(Twice in a year) (vii) Checking the functioning of compressor and its accessories. (viii) Cleaning the evaporator / condenser coils if found necessary.(twice in a year) and cleaning of chiller once a year. (ix) Lubricating the bearings of motors, & fans once a year. (x) Quarterly inspection of belts adjusting the tension and replacing the worn out belt as and when found required. (xi) In-case of Screw/Scroll Compressor failure maximum lead time for repairing of the compressor will be 2 to 4 weeks. (xii) Replenishment of refrigerant gas as a result of fare wear and tear. (xiii) Annual checking of compressor oil and changing once a year. (xiv) Overhauling/repairing of the components of the equipment at site or in service station as and when required. (xv) Checking of the microprocessor controller for its proper functioning and repair/ replacement of the same if found necessary. (xvi) Attending to the plant immediately when called upon. (xvii) Attending to complaint / breakdown calls whenever required (Max four times a year for outstation jobs). (xviii) Reporting the healthiness of the plant and suggesting improvements if any complete all as specified and directed by Engr-In-Charge.(xix) Contractor shall depute qualified experienced team for comprehensive annual maintenance as specified in CA. If any defects arise or serviceability of chiller plant is effected in between the periodicity of checking, contractor shall depute his team immediately for rectification on intimation. If contractor fail to send his team for rectification action, the penalty of Rs.10000/- per day for delay beyond 48 hrs of intimation by Engr-In-Charge shall be imposed. | |||||||
Tender Value
₹17 L
EMD Value
₹34,000
Closing Date
9 Aug 2025, 6:00 pmClosed
CWE (AF) BHUJ
CWE (AF) BHUJ KHAVDA ROAD BHUJ KACHCHH PIN 370001
REPAIRS AND MAINTENANCE INCLUDING COMPREHENSIVE MAINTENANCE AND AMC FOR CHILLERS NEAR RO PLANT INSIDE TECHNICAL AREA AT AF STN NALIYA
2025_MES_720030_1
85294/E8
Open Tender
Electrical and Maintenance Works
365 days
NALIYA
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
GE (AF) NALIYA
₹34,000
Yes
7 Feb 2026
12 Jul 2025
11 Aug 2025
12 Jul 2025
9 Aug 2025
26 Jul 2025
Amount
Comprehensive annual maintenance contract services at WSA-I for one year of 12 months for and including following Items:- (i) Water Cooled Scroll Chillers 03 Qty Blue Star XWC3S-039AR2, Refnigerant:- R407C, 26 KG, No. of Compressors:- 3 Nos, Compressors Dantoss :- 03 Nos, Model of Compressors:- Scrol, SZ185S4RC, DX type chiller with 03 circuit (ii) Chilled water pump, CT Pumps :- 5HP 3 Qty, Kirloskar monoblock pump 5 hp, CHW Pumps :- 5HP 3 Qty, Kirloskar monoblock pump 5 hp (iii) Delta make cooling towers 40 TR (iv) AIRHANDLING UNIT AND FANCOIL UNIT 02 Oty of Zeco, Model:- ZDS 80, CFM:-7100 CFM 5.5 KW Motor including replenishment of refrigerent gas and carrying out preventive maintenance as per standard practice four times in a year with scope of work as per Notes hereunder for complete serviceability of all units throughout the year all as specified and directed.
Comprehensive annual maintenance contract services at 2257 Sqn for one year of 12 months for and including following Items:- (i) Air Cooled Scroll Chillers 03 Qty of Blue Star XACS3036MA-36TR, Refnigerant:- R22, CHARGE :- 27 KG ,No. of Compressors:-3 Nos, Compressors Dantoss :- 03 Nos, Model Of Compressors:- Scroll, SM18554RC, DX type chiller with 03 circuit, 03 Nos Condenser fan motor in one Unit (ii) Chilled water pump, CHW Pumps:-5HP 2W+1S=3 Qty Crompton monoblock pump 5 hp (iii) AIRHANDLING UNIT AND FANCOIL UNIT 01 Oty of, Zeco, Model :- DHVW-220-C CFM:- 12904 CFM 10HP Motor including replenishment of refrigerent gas and carrying out preventive maintenance as per standard practice four times in a year with scope of work as per Notes hereunder for complete serviceability of all units throughout the year all as specified and directed.
Notes Applicable for item No.1 and 2:- (i) Inspecting the plant system and carry out preventive maintenance as per the standard practice four times a year (Each quarter -First Month). (ii) Checking the refrigeration system, motor and starters and ensuring healthy condition of the plant. (iii) Checking the system for any leaks and rectification of leaks if found (iv) Taking set of readings and evaluating to ensure satisfactory performance of the plant during First month of each quarter. (v) Checking the Refrigeration control system for operation and adjusting the settings.(vi) Descaling the condensers for water-cooled units if found necessary.(Twice in a year) (vii) Checking the functioning of compressor and its accessories. (viii) Cleaning the evaporator / condenser coils if found necessary.(twice in a year) and cleaning of chiller once a year. (ix) Lubricating the bearings of motors, & fans once a year. (x) Quarterly inspection of belts adjusting the tension and replacing the worn out belt as and when found required. (xi) In-case of Screw/Scroll Compressor failure maximum lead time for repairing of the compressor will be 2 to 4 weeks. (xii) Replenishment of refrigerant gas as a result of fare wear and tear. (xiii) Annual checking of compressor oil and changing once a year. (xiv) Overhauling/repairing of the components of the equipment at site or in service station as and when required. (xv) Checking of the microprocessor controller for its proper functioning and repair/ replacement of the same if found necessary. (xvi) Attending to the plant immediately when called upon. (xvii) Attending to complaint / breakdown calls whenever required (Max four times a year for outstation jobs). (xviii) Reporting the healthiness of the plant and suggesting improvements if any complete all as specified and directed by Engr-In-Charge.(xix) Contractor shall depute qualified experienced team for comprehensive annual maintenance as specified in CA. If any defects arise or serviceability of chiller plant is effected in between the periodicity of checking, contractor shall depute his team immediately for rectification on intimation. If contractor fail to send his team for rectification action, the penalty of Rs.10000/- per day for delay beyond 48 hrs of intimation by Engr-In-Charge shall be imposed.
JYOTI TRADERS (BID ID -3375790)
M/s. AMIT ASSOCIATES (BID ID -3380948)
Krishna Engineering (BID ID -3380661)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid