Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹11,400
Closing Date
24 Jan 2023, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GENERAL MANAGER (MECH/PROJECT/CLRP/CIVIL)
GENERAL MANAGER (MECH/PROJECT/CLRP/CIVIL)HOCL.AMBALAMUGAL
MODIFICATION REPAIR AND RESURFACING OF ROADS IN PLANT AND NON PLANT AREAS (FACTORY)
2022_HOCL_727379_2
CIV10148/2022
Limited
Miscellaneous Services
Works
90 days
HINDUSTAN ORGANIC CHEMICALS LIMTED, AMBALAMUGAL
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹11,400
Yes
25 Jan 2023
9 Jan 2023
25 Jan 2023
9 Jan 2023
24 Jan 2023
9 Jan 2023
Supplying and stacking at site 36 mm or nearest size hard granite broken stone.
Supplying and stacking at site 24 mm or nearest size hard granite broken stone.
Supplying and stacking at site 18 mm or nearest size hard granite broken stone.
Supplying and stacking at site 12 mm or nearest size hard granite broken stone.
Supplying and stacking at site 6 mm or nearest size hard granite broken stone.
Providing 40 mm thick bitumen concrete after brushing and cleaning the road surface well and using departmental material viz. 24 mm broken stone 0.245 cum, 18 mm broken stone 0.12 cum and 6mm broken stone 0.18 cum. per 10 m2 premixed with hot bitumen (48 kg. per cu.m of stone,112 kg of bitumen per cum of 6mm stone ), 41.00 kg per 10 sq.m. including a tack coat of 0.5 kg per sq.m., consolidating with power road roller ,hire for mixer, wheel barrows and rollers, cost of fuel and oils, hire for wire brushes, brass brooms, camber board and other sundry stores including cleaning and removing the waste/ balance materials from the side berms of the road after completion of work etc. complete.(Total consumption of bitumen is 4.10 kg/m2)
Repairs to the existing road surface by semi-grouting to an average thickness of 50 mm using departmental broken stone including cutting and removing the existing damaged bitumenous surface for a minimum depth of 50mm and disposing the same anywhere within the company premises as directed by the engineer-in -charge, Semi grouting the surface using 0.60m3 of 36mm broken stone, 0.18m3 of 12mm broken stone per 10m2 including spreading 36mm broken stone to template, over a tack coat of bitumen with mechanical/hand sprayer at 15kg/10m2, then spreading 12mm broken stones uniformly over the surface and rolling to get a uniform compact surface including cost of oil and fuels, hire for boiler, sprayer, roller, wire brushes etc.including cleaning and removing the waste/ balance materials from the side berms of the road after completion of the work etc. complete.(Total consumption of bitumen is 2.50kg/m2).
Providing 6mm thick premixed heavy seal coat over a tack coat of hot bitumen @ 2.50 kg/10 m2, using departmental materials, Viz 6mm broken stone 0.09 cum /10sqm premixed with bitumen 8.64kg/10sqm, including all charges for spreading, compacting with power road roller etc. complete.(The bitumen required for the work will be supplied from HOC Stores at Ambalamugal at fr ee of cost).
Supplying and Laying of Granular sub base (GSB) material with material conforming to Grade-I (size range 0.075 mm to 75 mm) having CBR Value-30, after dismantling and removing the existing damaged portion, including wearing course, base, sub -base, earth upto the required depth, laying of graded base material, spreding evenly in uniform layers, compacting with suitable capacity vibratory/ power rollers to achieve the desired density, to neat lines and levels and the matching template of existing road and disposing the surplus materials within the company premises etc. complete. as per the instruction of engineer in charge.
P T KRISHNAN ENGINEERING CONTRACTOR
Shiju P V
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .