| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 LAccepted-AOC | L1 | Accepted-AOC L1 bidder | |
| 2 | L2₹1.7 L+₹3,400 (2.00%)Rejected-Finance | L2 | Rejected-Finance Not L1bidder | |
| 3 | L3₹1.8 L+₹10,400 (6.13%)Rejected-Finance | L3 | Rejected-Finance Not L1bidder |
Tender Value
₹2.2 L
EMD Value
₹4,353
Closing Date
15 Jun 2020, 3:00 pmClosed
The GM,STPS
1st floor of Administrative Building, STPS.
Cleaning of various pits, sumps etc. with minor housekeeping jobs inside and outside of power house and adjacent areas in connection with overhauling of Unit-6 at STPS(2020).
2020_WBPDC_283410_1
WBPDCL/STPS/NIT/E2063/20-21
Open Tender
Housekeeping/ Cleaning
Item Rate
45 days
STPS, WBPDCL
AS GIVEN IN NIT
3 documents required · 3 mandatory
₹0
₹4,353
1st floor of Administrative Building, STPS.
23 Apr 2021
1 Jun 2020
18 Jun 2020
2 Jun 2020
15 Jun 2020
9 Jun 2020
8 Jun 2020
Amount
Engagement of worker for special/emergency housekeeping jobs to remove of accumulated dust, ash, coal dust, debris, scraps etc at different locations inside and outside of Power House area during and after overhauling period of Unit #6 at STPS as per direction of E.I.C.
Dewatering of water from pits, trenches etc by engagement of adequate nos. of pumps as and when required including cost of fuels, oil, operators, tools, tackles and other incidental charges as per direction of E.I.C. [Payment will be made on basis of actual working hours at site only].
Engagement of workers for cleaning of Mill Rejection Pit, Condenser Pit, CEP Pits, BOATP sump, vacuum pump house & drain sump, bottom ashing area, slurry common trough, sump & drain sump, slurry pump house, Boiler Blow down Sump, Silo Drain Sump, SWDS pits, Ash water sump etc. in connection with overhauling of Unit #6 at STPS.
Transportation of mixed earth, garbage and all types of wastes of STPS including loading into trucks/tractors at lifting points and unloading at disposal yards or other areas of inside plant premises of STPS as directed including carriage by head load up to 30mtr at both points, including cost of making road, if required, for plying trucks/tractors etc. at yard with contractor’s own cost (payments to be made on the basis of stack measurement of materials).
M/S A.P. ENTERPRISE
POWER LINE ENGINEERING
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .