Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 LAccepted-AOC 284 VEENA NAGAR CAMP DISTT JAGADHARI YAMUNA NAGAR 135001 HARYANA | YAMUNANAGAR | HARYANA | 135001 | ₹4.9 L | L1 | Accepted-AOC ok |
| 2 | L2₹5.1 LRejected-Finance GATE NO 1 PARAS PURAM COLONY BEHAT ROAD SAHARANPUR | SAHARANPUR | ₹5.1 L | L2 | Rejected-Finance ok |
| 3 | L3₹5.4 LRejected-Finance 308 WARD NO 1 KRISHNA NAGAR HAMIRPUR H P | ₹5.4 L | L3 | Rejected-Finance ok |
Tender Value
Refer Docs
EMD Value
₹4,928
Closing Date
30 Mar 2026, 1:00 pmClosed
Resident Engineer
RE LPHD Thalout
Tender for complete dismantling and repair of nozzle mouthpiece and associated components of 3x1.5MW Thirot power House Sub-Division HPSEBL Thirot L S under the Resident Engineer, Larji PH Division, Thalout.
2026_HPSEB_132268_1
HPSEBL/RELPHD/DB-10/ 2025-26-38
Open Tender
Repair and Maintenance Services
30 days
Thalout
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
₹4,928
6 Apr 2026
24 Mar 2026
30 Mar 2026
24 Mar 2026
30 Mar 2026
24 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Complete scope of work includes: a) Complete dismantling of the runner and its associated components from the shaft, thereafter dismantling upper and lower nozzle mouth assemblies of Unit No. 3 at Thirot Powerhouse. The dismantled assemblies are to be carefully packed and safely transported to the contractor’s workshop for further repairs. b) Repair/ fabrication of upper and lower nozzle mouth assemblies by TIG ( Tungsten Inert Gas) welding with SS grade rods. c) Heat treatment (Annealing / Normalizing) for relieving of stresses arises due to welding and then machining of profile as per drawing. d) All chevron packing, S.S. spacer rings, must be replaced. e) Repair and fabrication of both mouth base circular rings. by means of welding and machining as per profile , f) All components shall be transported back to Thirot Powerhouse for commissioning of the aforementioned fabricated, repaired, and replaced parts in Unit No.3. g) Installation of the runner and associated components, ensuring all safety measures are followed. h) Any fasteners found to be damaged should be replaced. i) Thereafter, complete parallel and angular alignment of the shaft using a dial indicator and standard procedures with respect to thrust and guide bearings at both the drive end (DE) and non-drive end (NDE) of the shaft. j) The final step involves testing all commissioned components and repair/fabricated parts to meet the standard requirements as per design, ensuring they are fully operational and meet all performance measures, thereby completing the job in all respects. | |||||
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.95 MB
BOQ_195597.xls
BOQ • 0.28 MB
Tenderdoc2.pdf
Tender Documents • 0.50 MB
Download all tender documents and submit your bid