Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.5 CrAccepted-Finance 108 3 CHANDAR NAGAR DEHRADUN | DEHRADUN | UTTARAKHAND | 248001 | ₹2.5 Cr | 1 | Accepted-Finance Rate are approve |
| 2 | Rejected-Technical | - | - | Rejected-Technical Not Qulified in Bid Documents |
Tender Value
₹2.4 Cr
EMD Value
₹4.7 L
Closing Date
14 Feb 2023, 3:30 pmClosed
SE UJS Pauri office
SE UJS Pauri office
Simalana Water Supply Dugadda Block Under Kotdwar Division
2023_UKJS_54361_9
369/JJM/E-tender/dated25.01.23
Open Tender
Civil Works - Water Works
Item Wise
180 days
Simalana Water Supply Dugadda BLOCK
As per ten doc
2 documents required · 2 mandatory
₹5,900
EE UJS KOTDWAR
₹4.7 L
Yes
SE UJS Pauri office
21 Apr 2023
27 Jan 2023
15 Feb 2023
27 Jan 2023
14 Feb 2023
27 Jan 2023
1 Feb 2023
SITC of Pump, Motor Spare Parts and Supplying ,carting , laying and jointing of G.I pipe (M) , Source work ,Reservoir& qualitative drinking water for each house hold and all other appurtenant works etc complete SIMALNA water Supply scheme Under DUGADDA blocks in District Pauri. All rates shall be included all types of taxes and G.S.T. It is necessary the contractor will start the work from source to Distribution System. If any dispute in the source than other work will not done by the contractor
Diversion of Gadhera., including supply of all materials, labour, T&P etc. required for proper completion of work foundation trenches or into the plinth and disposal of surplus earth upto a distance of 50m from the centre of foundation.
Construction of Boulded Filled Gallery 4m wide, including Inlet chamber and supply of all materials, labour, T&P etc. required for proper completion of work (as per type design)
Construction of Extra Cross wall . including supply of all materials, labour, T&P etc. required for proper completion of work (as per type design)
Construction of Stone Masonry SCC/RR (1.00mx1.00m) in size including Supply of labour material T&P etc. Complete. (as per type design)
Excavation for foundation in Soil mixed with boulders
PCC 1:2:4 including supply of all materials, labour, T&P etc. Complete
Providing of all materials,Carting from site store to site of work,Laying & jointing of GI (M) screwed pipes(including supply of all jointing materials, white lead, hemp and oil etc) in trenches with its cutting, threading and testing of pipe line etc complete. From BFG to MPS. GI(M) Pipe 65 mm Dia
Supply of all materials, labour and T & P etc. and construction of R.C.C. Sump / Clear Water Reservoir of following Capacity in K.L. as per design and drawing including fixing of pipes and fittings including cartage of materials etc. complete Clear Water Sump 125.0 KL Capacity at Top CWR
Clear Water Sump 80.0 KL Capacity at MPS
Clear Water Sump 20.0 KL Capacity at IPS
RCC CWR 1.0 KL
RCC CWR 2.0 KL
RCC CWR 3.0 KL
RCC CWR 4.0 KL
RCC CWR 5.0 KL
RCC CWR 7.5 KL
Supply and fixing of PVC tank type chlorinator of 50 Liter capacity at top of all service raservoirs.
Providing of all materials, Carting from site store to site of work, Lowering into trenches with true to alignment, Laying of MS ERW YST 210, Jointing by electric welding process with proper grade of eletrodes suitable for jointing of water supply pipe lines (Ador, L&T or equivalent electrodes) by cutting of pipes and making required bends by welding, completion of work with testing of pipe line etc complete in repair From MPS to TOP CWR MSERW Pipe 80 mm Dia, 4.8 mm Thickness
Providing of all materials, Carting from site store to site of work, Laying & Jointing of G.I. medium screwed pipes (including supply of all jointing materials like specials, white lead, hemp and oil etc) in trenches with its cutting, threading and testing of pipe line etc complete. 15 mm dia (For FHTC)
20 mm dia
25 mm dia
32 mm dia
40 mm dia
Excavation of earth for pipeline trenches 0.60m wide & 0.60 M deep in following strata lift upto 1.5 m lead upto 30 m including refilling, watering, ramming of excavated earth into the trenches and removal of surplus earth upto a distance of 60 m from trenches including supply of labour, T & P etc.all complete assuming that 90% pipe line is laid in trenches, it is estimated that 95% excavation will be in soil mixed with shingle, bajari and boulders and rest 5% will be in medium rock Soil mixed with boulder (SMB)
Medium Rock
Supply & fixing of following sizes of valves including carting the same up to side of work and fixing the same in water supply lines including cost of valves, specials, labour and T&P complete in all respect C.I. Air valve (Double Acting) 50mm
Supply of all materials, labour, T & P etc. and Construction of following size Sluice Valve / Reflex Valve / Scour Valve/Air valve Chamber as per type design complete (1.2x1.2x1.2)
Supply of all materials, labour, T & P etc. and Construction of R.C.C Anchor Block as per type design complete (0.75 x 0.75 x 0.75)
Making 2 M wide Briddle path for rising main including hill side cutting and coolie walling of all materials, labour, T & P etc.
Painting of MSERW Pipes with 2 coats of approved quality. (Anti-Corrosive paint over one coat of Primer) (Dia of pipe in mm) 65 mm dia
Supply and fixing of the following fittings including cartage of materials, labour, T&P etc. complete Gate/Wheel Valve ( Brass )/G.M.Valve 15 mm dia
20 mm dia
25 mm dia
32 mm dia
40 mm dia
65 mm dia
Supply of all materials, labour, T&P etc. and construction of 0.9 m x 0.9 m x 0.9 m size Gate Valve chamber with FPS bricks
Providing and laying of wire crates 3.00x1.50x1.50 in size with GI wireconforming to IS: 280 & IS:4826 in 150mm x 150mm mesh laid with stone boulders. as per direction of Engineer-in- charge. (As per PWDUttarakhand specifications)
Providing and fixing brass bib cock of approved quality : 15 mm nominal bore
Providing and fixing brass ferrule with C.I. mouth cover including boring and tapping the main 15 mm nominal bore
C.I.Mouth, brass ferrule 15 mm dia
Providing G.I.Tee (equal)
Providing G.I.Union(15 mm dia)
C.P.Brass extension Nipple
Providing G.I.elbow (15 mm dia)
Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in breast walls, retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P etc. complete in Intake work, along the Rising main, Supply/feeder main, distribution system, storage reservior etc
Random Rubble Stone Masonry laid Dry, in breast walls, retaining walls, etc. including supply of all material, labour, T&P etc. complete in Intake work, along the Rising main, Supply/feeder main, distribution system, storage reservior etc
Cartage of Material from foot hill Kotdwar to Site Store at Road head by truck in Pucca & Kachcha Road & also including by head load & stacking of materials (as per annexure)
Repair of existing pump house 6mx5m in size at IPS including supply of all materials, labour and T & P etc. (as per annexure)
SITC of electric driven multi-stage horizontalclear water centrifugal pumps with bronze impellers, stainless steel shaftcapable to deliverclear water 330 LPM discharge at 300 Mt. head 2900 r.p.m. at MPS
SITC of electric driven multi-stage horizontalclear water centrifugal pumps with bronze impellers, stainless steel shaftcapable to deliverclear water 330 LPM discharge at 320 Mt. head 2900 r.p.m. at IPS
SITC of horizontal shaft TEFC electric motors suitable to run on 415 +-10% volts, 3 phase, 50 Hz A.C supply and suitable motor for above pump, 2900 r.p.m. at MPS
SITC of horizontal shaft TEFC electric motors suitable to run on 415 +-10% volts, 3 phase, 50 Hz A.C supply and suitable motor for above pump, 2900 r.p.m. at IPS
Supply & fixing of fully automatic auto transformer type starter suitable for above motors having airbreak contactors, electroni timer, thermal over load relay, adequate size Aluminum bus bars, copper wound auto transformer and dulywired by copper leads/ wire, lugs, ON/OFF andreset switches and indicators etc. complete in all respects at MPS & IPS
Supply & fixing of M.S fabricated base plate and coupling for above pumps and motors. at MPS & IPS
Supply & fixing of power wiring material such as 25 sq.m.m 3 Core copper conductor cable XLPE insulated cable for power wiring between the control panel and starter to motor. (FOR TWO RUNS) at MPS & IPS
Supply & fixing of power wiring material such as 70 sq.mm. 3 and half Core aluminum onductor cable XLPE insulated , cable for power wiring between power transformer and contrl panel at MPS & IPS
Jointing material for wiring connection including lugs, thimble , insulation tapes, nutt bolts etc. at MPS & IPS
Double loop earthing of all electrical equipments with supply of material such as G.I earth strip, earth plate, GI funnel, charcoal, Salt watering pipe etc. including digging of pits and refilling complete at MPS & IPS
Supply of main piping spair and valves comprising for MPS(As Per Annexure)
Supply of a set of pressure gauges (0-56) kg/cm^2 complete with control cocks and nipples including all necessary fitting etc. at MPS & IPS
Supply of Tools (As per Annexure)
Rubber insulation sheet 2.0mx0.1mx25mm thick at MPS & IPS
Installation, commissioning and testing work of entire equipment including pumps, motors, control panel, starter, and power wiring etc, at MPS & IPS
Provision of Sign Board
Provision of Material Testing
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .