Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹8,800
Closing Date
4 Aug 2022, 2:00 pmClosed
BENO P KURIANS
GENERAL MANAGER (MECH/CIVIL/PROJECTS/CLRP)
MAINTENANCE OF HEAT EXCHANGERS AND COLUMNS IN PHENOL PLANT
2022_HOCL_700764_1
MEC30331
Limited
Miscellaneous Services
Works
4 days
HOCL, AMBALAMUGAL
AS PER TENDER DOCUMENT
2 documents required · 2 mandatory
₹0
₹8,800
Yes
12 Aug 2022
14 Jul 2022
5 Aug 2022
14 Jul 2022
4 Aug 2022
14 Jul 2022
14 Jul 2022 - 3 Aug 2022
Amount
101 E-002 (C-001 OVERHEAD CONDENSER) [FIXED HEAD STRAIGHT TUBE EXCHANGER] - MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK
E-2004 (DEPROPANISER OVERHEAD CONDENSER) [FLOATING HEAD STRAIGHT TUBE EXCHANGER]-MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK
E-2006 (RECYCLE COLUMN REBOILER)[FLOATING HEAD STRAIGHT TUBE EXCHANGER]-MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK
E-2501 (COMPRESSOR AFTER COOLER) [FLOATING HEAD STRAIGHT TUBE EXCHANGER] - MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK
E-3501 A - CLEANING (CLEAVAGE REACTOR COOLER)[FIXED HEAD U-TUBE EXCHANGER] - MAINTENANCE & HYDROTESTING. (AS PER THE SCOPE OF WORK)
E-3501 B - CLEANING (CLEAVAGE REACTOR COOLER)[FIXED HEAD U-TUBE EXCHANGER] - MAINTENANCE & HYDROTESTING. AS PER THE SCOPE OF WORK)
E4502 - (C.A.C OVERHEAD CONDENSER) ISOLATION,BLINDING,AND DOPPING THE EXCHANGER TO FLOUR,OPENNING CHANAL HEAD COVER,SHELL COVER,FLOATING HEAD OVER,ASSEMBLE AFTER CLEANING AND HYDRO TEST IN SEQUENCE OF ASSEMBLE (AS PER SCOPE OF WORK).
E-4509 (TAR COLUMN RE-BOILER) [FIXED HEAD U-TUBE EXCHANGER]-MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK
E-4513 (PTR PRE-HEATER) [FIXED HEAD U-TUBE EXCHANGER]-MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK
E-4516 (PHENOL COLUMN REBOILER) [FIXED HEAD U-TUBE EXCHANGER]-MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK.
E-4517(PHENOL COLUMN OVERHEAD CONDENSER) [FLOATING HEAD STRAIGHT TUBE EXCHANGER] - MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK
E-4519 (PRC OVERHEAD CONDENSER) [FIXED HEAD U-TUBE EXCHANGER]-MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK.
E-4520 (PRC VENT CONDENSER) [FIXED HEAD FIN U-TUBE EXCHANGER]- MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK
E-4521 A (PHENOL PRODUCT COOLER) [FIXED HEAD U-TUBE EXCHANGER]-MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK.
E-4521 B (PHENOL PRODUCT COOLER) [FIXED HEAD U-TUBE EXCHANGER]-MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK.
E-5002 (HYDROGENATION CHARGE HEATER) [FIXED HEAD U-TUBE EXCHANGER] – MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK
E5003 - (HYDROGENATION PRODUCT CONDENSER) [FIXED HEAD U-TUBE EXCHANGER] - MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK
E-5502 (RERUN COLUMN OVER HEAD CONDENSER) [FLOATING HEAD STRAIGHT TUBE EXCHANGER]- ISOLATION, BLINDING AND DROPPING THE EXCHANGER TO FLOOR, OPENING CHANNEL HEAD COVER, SHELL COVER, FLOATING HEAD COVER, ASSEMBLE AFTER CLEANING AND HYDRO TEST IN SEQUENCE OF ASSEMBLE AS PER SCOPE OF WORK.
E-5503 (RERUN COLUMN BOTTOM COOLER) [FIXED HEAD FIN U-TUBE EXCHANGER] - MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK.
E-5506 (STRIPPER COLUMN BOTTOM COOLER) [FIXED HEAD FIN U-TUBE EXCHANGER] - MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK
E-5507 (TAR CRACKING HEATER) [FIXED HEAD U-TUBE EXCHANGER] - MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK
J-3001A (EJECTOR COOLER EVAPORATOR-I) [U-TUBE EXCHANGERS] - MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK
J-3001B (EJECTOR COOLER EVAPORATOR-II) [U-TUBE EXCHANGERS] - MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK
J-3001C (EJECTOR COOLER EVAPORATOR-III) [U-TUBE EXCHANGERS] - MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK
J-4501A (EJECTOR COOLER FRACTIONATION-I) - MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK
J-4501B (EJECTOR COOLER FRACTIONATION-II) - MAINTENANCE & HYDROTESTING AS PER THE SCOPE OF WORK
C-5501 (RE-RUN COLUMN) MAINTENANCE AS PER THE SCOPE OF WORK
C-4505 (PHENOL COLUMN) MAINTENANCE AS PER THE SCOPE OF WORK
BPASS ENGINEERING & CONSTRUCTIONS
TECH STEEL ENGINEERING CONTRACTORS
Prayaga Engineering Constructors
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .