Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 LAccepted-Finance | L1 | Accepted-Finance Being L1 | |
| 2 | L2₹1.6 L+₹10,650 (7.33%)Rejected-Finance | L2 | Rejected-Finance Being not L1 | |
| 3 | L3₹1.6 L+₹15,650 (10.8%)Rejected-Finance | L3 | Rejected-Finance Being not L1 | |
| 4 | L4₹1.6 L+₹16,150 (11.1%)Rejected-Finance | L4 | Rejected-Finance Being not L1 | |
| 5 | L5₹1.7 L+₹24,050 (16.5%)Rejected-Finance | L5 | Rejected-Finance Being not L1 |
Tender Value
Refer Docs
Closing Date
22 Mar 2022, 9:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Nitesh Kumar Singh
AGE I R D VIZAG
Repairs to vehicle motor cycle Hero Honda Veh BA No-15A068469L Tata Xenon BA No 20C108749M and Repairs to vehicle Eicher 10 75 B A No 14D 193979K
2022_MES_513643_1
301/AGE(I)R/D/VIZ/JOB/ 01 OF 2021-22
Limited
Miscellaneous Services
Item Rate
30 days
AGE I R D VIZAG
Repairs to vehicle motor cycle Hero Honda Veh BA No-15A068469L Tata Xenon BA No 20C108749M and Repairs to vehicle Eicher 10 75 B A No 14D 193979K
1 document required · 1 mandatory
₹0
Exempted
24 Mar 2022
15 Mar 2022
23 Mar 2022
16 Mar 2022
22 Mar 2022
16 Mar 2022
30 days
Amount
Opening of the unserviceable parts of motor cycle and carry out repair and servicing, oiling, greasing of moving parts at OEM authorised service centre with replacement of the following new parts BA No-15A 068469L
(i) Piton with piston rings Set-1
(ii) Valve set Set-1
(iii) Valve Seal No-1
(iv) Head gas kit No-1
(v) Clutch plate assembly Set-1
(vi) Gear shaft with bearing Set-1
(vii) Crank assembly no-1
(viii) Crank Bearing No-1
(ix) Indicator Set-1
(x) Seat cover No-1
(xi) Accelator cable No-1
(xii) Tail Panel No-1
(xiii) Air Filter No1
(xiv) Engine oil Ltr-0.9
(xv) Khard work Job-1
(xvi) Clutch center No-1
(xvii) Sparking plug No-1
(xviii) Chain with front and rear spigot/gear Set-1
(xix) Brake shoe (front and rear) Set-2
(xx) Kick spring with washer No-1
(xxi) Back light assembly NO-1
(xxii) Head light Assembly complete n No-1
Water Servicing of Motor Cycle .Job-1
Mechanical Labour LS-1
Taking out self starter assembly and replace the unserviceable parts i.e. carbon bush, armature rewinding, solenoid switch and refixing the same after testing. Veh BA No -20C 108749M
(i) Fuel Filter Element make- mico Set-1
(ii) Oil Filter make- mico Set-1
(iii) Engine oil Ltr -7.5
(iv) Air Filter element make- mico No-1
(v) Accelerator cable No-1
(vi) V belt as per existing size No-1
(vii) Fuel hose pipe No-1
(viii) Water pump No-1
Supply and fixing the following new parts
(a) Foot rest of both side Set-1
(b) Steering cover No-1
Dismantling clutch assembly and replacement the following parts/items
(i) Servicing of Clutch & pressure plate assembly complete Job-1
(ii) Clutch release bearing No-1
(iii) Clutch cylinder Lower No1
(iv) Clutch cylinder Upper No-1
(v) Transmission Oil Ltr-1
Opening the front wheels of vehicle by replaced the damage brake pads and rotors and reassamble the same with following parts :-
(i) Disc Pad (front left and right) Set-1
(ii) Disc rotor ( front left and right) Set-1
Taking out self starter assembly and replace the unserviceable parts i.e. carbon bush, armature rewinding, solenoid switch and refixing the same after testing. Job-1
Repair to the alternator and replace the defective part i.e. Cut out switch, Seal, Rotor, Rectifier Plate, Bearing etc and reassemble Job-1
(a) Taking out the complete seats and repair the same by replacement of seat cushion and supply and fix of rexine seat covers complete with seat cushion fixed with proper elastic sticking and pockets with dust resistance washable material, stretchable and wrinkle free etc Job-1
(b) Supply and fix foot mat good quality. No-4
Dismantling the unserviceable Wiper assembly including wiper blade, conecting rod refix the same with new one. Set-1
Computerized Balancing and alignment of the wheels Job-1
M & L for complete Servicing of vehicle replacement of Engine oil, tunning to Engine including washing using soap solution, cleaning internally using vacuum cleaner and externally with water spray jets, greasing, polishing the complete vehicle with superior quality of polish etc. Job-1
Mechanical Labour LS_1
Dismentling and taking out unserviceable spare parts/Items and supply, replacement of parts/Items as under:-14D 193979K
(i) Fuel Filter Element Set-1
(ii) Oil Filter Set-1
(iii) Engine oil Ltr-12.5
(iv) Air cleaner Rubber hose No-1
(v) Air Filter element No-1
(vi) Bypass Filter No-1
(vii) Accelerator cable No-1
(viii) V belt No-1
(ix) Fuel hose pipe No-1
Opening the 6 wheels, taking out worn out bearings, lubricating the wheel hub by superior grade of grease, refixing with replacement of following parts/items:-
(i) Front wheel bearing small No-4
(ii) Front wheel bearing Big No-4
(iii) Rear wheel bearing inner No-2
(iv) Rear wheel bearing outer No-2
(v) Oil Seal No-4
(vi) Wheel cylinder No-2
(vii) Grease Kg-1.5
Dismentling the rear axle and opening of the differential of the vehicle , reassemble the same with replacement of following parts/items:-
(i) Differential differential gear Nos-2
(ii) Differential pinion yoke No-1
Repair to brake system with replacement of following parts/items:-
(i) Rear brake cylinder (left and right) No-2
(iii) Brake fluid Ltr-0.5
(iv) Brake hose pipe No-4
Taking out self starter assy and replacing of the u/s parts i.e carbon brush, rewinding of armature and refixing the same after testing. Job-1
Opening of steering assembly, taking out the unserviceable parts, refix and replace the following parts:-
(a) Steering Cross No-1
(b) Steering Arm No-1
Replace the following parts:-
(i) Door handle Right side No-1
(ii) Door handle left side No-1
(iii) Wiper assembly including wiper blade, motor and connecting Rod Set1
(a) Taking out the complete seats and repair the same by replacement of seat cushion and supply and fix of rexine seat covers complete with seat cushion fixed with proper elastic sticking and pockets with dust resistance washable material, stretchable and wrinkle free etc JOB-1
(b) Supply and fix foot mat good quality. No-2
Disconnecting of complete radiatior assembly, cleaning and descaling of chocked tubes of radiator, cleaning the fins of the radiator with acid water including brazing of worn out copper tube and replacement of the worn out minor spares such plain washer, spring washer, screw nut bolt joint rubber and filling of coolant. Job-1
Computerized Balancing and alignment of the wheels Job-1
Servicing of vehicle including washing using soap solution, cleaning internally using vacuum cleaner and externally with water spray jets, greasing of complete vehicle, polishing the complete vehicle with superior quality of polish including washing of mats. Job-1
Mechanical Labour Ls-1
SRI SAI BABA AGENCIES
G S ASSOCIATES
ROHANPUSAN AUTO POWER LINE
SRI SAI KRISHNA ENGINEERING WORKS
SRIVALLI ENGINEERS
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
finance_574157.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .