Loading…
Loading…
Tender Value
₹12.4 L
EMD Value
₹24,900
Closing Date
6 Aug 2026, 4:00 pm
Office of The Executive Engineer RnB Division Patt
Office of The Executive Engineer RnB Division Pattan
Construction of one Roomed ACR for BMS Goom Ahmadpora Zone Singpora Pattan.
2026_PWDJK_316874_2
NIT 37 of RnB Pattan 2026-27
Open Tender
Civil Works
Percentage
180 days
Office of The Executive Engineer RnB Division Patt
Please refer Tender documents.
5 documents required · 5 mandatory
₹600
Office of The Executive Engineer RnB Division Patt
₹24,900
20 Jul 2026
20 Jul 2026
7 Aug 2026
21 Jul 2026
6 Aug 2026
21 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means in foundation trenches or drains (not exceeding 1.5 m in width as well as 10 Sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed. | 9.11 | Cum | 256.85 | ₹2,339.9 |
| 2 | P/L of dry stone soling duly hand packed including all carriages loading unloading complete job before laying of mud mate in trenches incl. all carriages of material involved & head load. | 22.6 | Cum | 1,000 | ₹22,600 |
| 3 | P/L in position cement concrete of specified grade excl. the cost of centering and shuttering: 1:4:8 (1 cement 4: coarse sand 8 graded stone crushed agg.40mm nominal size) Incl Carriage | 5.22 | Cum | 5,667.9 | ₹29,586.44 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) including all carriages. | 5.83 | Cum | 8,253.4 | ₹48,117.32 |
| 5 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in Cement mortar 1:6 ( 1 cement : 6 coarse sand ) including all carriages. | 16.52 | Cum | 9,492.2 | ₹1,56,811.14 |
| 6 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 16.5 | Cum | 7,056.25 | ₹1,16,428.13 |
| 7 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto floor five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) including all carriages. | 5.93 | Cum | 10,286.85 | ₹61,001.02 |
| 8 | P/ Fixing in position reinforcement for RCC works incl Straighening cutting bending binding , placing in position TMT bars incl. all carriages complete job | 1,764.5 | Kg | 123.2 | ₹2,17,386.4 |
| 9 | Centering and shuttering including strutting propping etc. and removal of form for foundation, footings basses of columns etc . including all carriages. | 13.28 | Sqm | 577.25 | ₹7,665.88 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for: Suspended floors, roofs, landings, balconies and access platforms. | 27.14 | Sqm | 718.2 | ₹19,491.95 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.89 MB
BOQ_1035864.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].