Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 34 SANJAY BUILDING NO 6 ANDHERI KURLA ROAD ANDHERI EAST MUMBAI MAHARASHTRA 400059 | MUMBAI SUBURBAN | MAHARASHTRA | 400059 | Admitted-Finance |
| 2 | Admitted-Finance NO 5 1ST FLOOR CITY PLAZA DABA GARDEN DABA GARDEN VISAKHAPATNAM ANDHRA PRADESH 530020 | VISAKHAPATANAM | ANDHRA PRADESH | 530020 | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance 55 A HANUMAN BLDG 3RD FLOOR 308 PERIN NARIMAN STREET FORT MUMBAI MAHARASHTRA 400001 UDYAM MH 19 0022488 27AFCPS6977F1ZX R M MSME STATUS AS VERIFIED | MUMBAI | MAHARASHTRA | 400001 | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹68,000
Closing Date
15 Oct 2020, 10:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
ASD
NAVAL DOCKYARD VISAKHAPATNAM
Installation of TTL System
2020_NAVY_380920_1
COM/OFF/WEA/20-21/68
Limited
Marine Services
Turn-key
180 days
NAVAL DOCKYARD VISAKHAPATNAM
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹68,000
Yes
NAVAL DOCKYARD VISAKHAPATNAM
18 Jan 2021
1 Oct 2020
16 Oct 2020
1 Oct 2020
15 Oct 2020
8 Oct 2020
1 Oct 2020 - 15 Oct 2020
5 Oct 2020
180 days
Fitment of following Units: (a) Ship Borne Presetter (SPS) in Ops Room (b) Portable Presetter (PPS) & associated cable assembly in AMCO Compartment (c) Level Controllers (JBs) in SCR/ AMCO & Gymnasium (d) Trans rectifier in SCR (e) Battery Charger in AMCO (f) Torpedo Loading Trolley in AMCO (g) Torpedo Simulator in AMCO (h) Air bottles and charging facility in AMCO & Gymnasium.Activities involved towards fitment and installation (including securing arrangements) of the units listed at Sl 1 at locations mentioned against each of them. This includes degutting, regutting activities and fabrication of appropriate foundations and there fitment and there necessary securing arrangements.
Cabling/Connectorisation of following of Units : (a) Ship Borne Presetter (SPS) in Ops Room (b) Portable Presetter (PPS) & associated cable assembly in AMCO Compartment (c) Level Controllers (Junction boxes) in SCR / AMCO & Gymnasium (d) Trans rectifier in SCR (e) Battery Charger inAMCO (f) Torpedo Loading Trolley in AMCO (g) Torpedo Simulator in AMCO (h) Air bottles and charging facility in AMCO & Gymnasium.Cabling and connectorisation of associated assemblies as per System Wiring Diagram. This includes proper securing of the cabling throughout the route on appropriate cable trays.
TTL mountings.Shifting of both TTL mountings inside TTL compartments (AMCO and Gymnasium) through the newly created recess on both port and starboard ship sides. The activity involves fabrication and fitment of a recess, approximately (2 X 1.5) meters, in the Ship’s side Transverse bulkhead to facilitate firing of Torpedoes
TTL MOUNTINGS.Manufacture of the appropriate base foundation for both the mountings as per Installation Diagram. Fitment of both TTL mountings on the foundation in AMCO and Gymnasium Compartments.
HP Air System.Installation and commissioning of HP air system including fitment of 02 in no HP air cylinders of capacity 258 Liters, 280 Bar and associated Reducers, non-return valves, pipelines and Bulkhead Glands.
Cable Tallies.Metal cable tallies are to be provided at each end of the cable. Requisite booting of cables to be undertaken post successful trials of the system
Magazine Modification.The storage capacity of Magazine to be enhanced from 12 to 16 Torpedoes by fabricating two additional stowage arrangements on both sides of the existing racks (Securing brackets including Rollers and Securing Pins) as per fabrication details covered in Installation Drawing
Helo Starting Convertor.Shifting of Helo Starting Convertor from AMCO Compartment to the newly created ‘Aircraft Equipment’ Room inside AMCO. Check wire/STW/Proving of Helo starting converter.
LAN Zonal Switch.Shifting of LAN Zonal Switch from AMCO to regulating office. Check wire/STW/Proving of LAN Zonal switch
Conversion of Gymnasium and A/C equipment room to Port TTL Compartment..The following activities are required to be undertaken: (a) Blanking of existing door of A/C ER (Photo work shop) with a WT door or BHD section. (b) Removal of Bulkhead between Gymnasium and Aircraft equipment room for merging the compartments. (c) WT door from Hanger to Gymnasium to be blanked and provide new recess in order to facilitate shipping of TTL equipment and loading of Tubes. (d) Pre – wetting line in the A/C equipment room to be re-routed within the compartment to pass through clear of TTL. (e) The deck covering of the compartment to be changed from Macrotech scheme to whether deck scheme. (f) Ventilation trunking to these compartments to be blanked at the citadel boundary. (g) The AVCAT pipe running at deck level of the A/C ER room is to be re-routed along the BHD of the Gymnasium compartment. (h) Provision of Pneumatic charging point for Air bottles in AMCO compartment for both TTL. (i) Strengthening of deck to cater for the blast load imposed due to thrust in addition to weight of the TTL. (j) Provision of water drainage for both TTL compartments view exposure of the compartments to weather post proposed modifications. (k) 02 in Nos. new cable glands to be used for passing the TTL cable in Gymnasium. (l) Removal and Fitment of Lagging in Mess 5 and Mess Lobby, ATM-3, CO2 compartment (m) Deck Head Paneling in Mess 5 and Mess Lobby, ATM-3, CO2 compartment. The activity involves manufacture and fitment of supporting frames at the deck heads of associated compartments followed by fitment of paneling. (n) The existing Scupper pipelines in both GYM compartment are to be routed along the Bulkhead.
Conversion of AMCO compartment to Starboard TTL compartment.The following activities are required to be undertaken: (a) Blanking of existing door of AMCO with a WT door or BHD section. (b) Provision of a WT recess / door to facilitate access and loading of Torpedoes to Starboard TTL from the Hanger. (c) LAN Zonal switch along with UPS to be shifted along with cabling to the store office. (d) The deck covering of the compartment to be changed from Macrotech scheme to whether deck scheme. (e) Ventilation trunking to these compartments to be blanked at the citadel boundary. (f) Shifting of Helo Starting Converter and its control panel towards the fwd section of the compartment. (g) Relocation of electrical junction boxes of HTS (mounted on the bulkhead shared with helo hangar) to the starboard ship side within the hangar. (h) Provision of Pneumatic charging point for Air bottles in Gymnasium compartment for both TTL (i) Strengthening of deck to cater for the blast load imposed due to thrust in addition to weight of the TTL. (j) Provision of water drainage for both TTL compartments view exposure of the compartments to weather post proposed modifications. (k) BHDS to be fabricated to make new compartment for A/C ER in AMCO compartment. Removal of water tight bulkhead at frame station 61 and manufacture/fitment of loading rails to facilitate loading and unloading of Torpedoes from magazine to TTLs. (l) The Rotary converter in the AMCO compartment is to be relocated to the newly created Aircraft Equipment’ Room. (m) 02 in Nos. new cable glands to be used for passing the TTL cable in AMCO. (n) Fitment of Lagging in Mess 5 and Mess Lobby, ATM-3, CO2 compartment (o) Deck Head Paneling in Mess 5 and Mess Lobby, ATM-3, CO2 compartment. The activity involves manufacture and fitment of supporting frames at the deck heads of associated compartments followed by fitment of paneling. (p) The existing Scupper pipelines in both AMCO compartment are to be routed along the Bulkhead.
Removal of water tight bulkhead at frame station 61 and manufacture/fitment of loading rails to facilitate loading and unloading of Torpedoes from magazine to TTLs..As per details in BPs and WLDs
Fitment of microphone boxes with loud speakers along with associated cabling in the concerned compartments (Ops Room, both TTL’s and Torpedo Magazine) as per WLD’s..As per details in BPs and WLDs
Relocation of AMCO compartment to Regulating office..As per details in BPs and WLDs
Fitment of non-watertight doors on both hangars.The work involves fitment of 02 in no watertight doors of dimensions (1.7 x 2)m at the opening from Hangar to TTL compartment
Positioning of deck strengthening bars in CO2 compartment.The work involves shifting of CO2 bottles out from CO2 compartment by SS and SAX to facilitate clearance of work to FAB. Post shifting of bottles associated pipelines to be secured by SAX. Thereafter, positioning of angular bars in longitudinal and transverse axis as per WLDs by FAB. Post completion of deck strengthening work, positioning of bottles inside CO2 compartment and proving of the system
YEOMAN MARINE SERVICES PVT. LTD.
SAGAR SHIP REPAIRERS AND MARINE SERVICES
POSITIVE CONTROLS
H and H Precision Private Limited
Patel Engineering Works Vizag
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .