Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.3 CrAccepted-AOC AT KHARIAR PO KHARLAR DIST NUAPADA | ₹9.3 Cr | L1 | Accepted-AOC Accepted as stood L1 |
| 2 | L2₹9.6 CrRejected-AOC AT PO KHARIAR DIST NUAPADA | KHARIAR | NUAPADA | ODISHA | ₹9.6 Cr | L2 | Rejected-AOC Rejected as stood L2 |
| 3 | L3₹9.7 CrRejected-Finance AT PO BABEBIR DIST NUAPADA PIN NO 766118 | NUAPADA | NUAPADA | ODISHA | 766118 | ₹9.7 Cr | L3 | Rejected-Finance Stood L3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical Non-Responsive |
| 5 | Rejected-Technical | - | - | Rejected-Technical Non-Responsive |
Tender Value
₹11.6 Cr
EMD Value
₹11.6 L
Closing Date
20 Mar 2026, 3:00 pmClosed
Engineer-in-Chief (PH), Odisha, Bhubaneswar
Office of the Engineer-in-Chief (PH), Odisha, 1st Floor, Unnati Bhawan, Satyanagar, Bhubaneswar-751007, Phone (0674) 2575309.
Construction of RCC ESR, RCC UGR, Sunken Pump House, CC Road, Boundary Wall, Laying of CWRM, Distribution Pipeline, Pumping Arrangement, External and Internal Electrification, Automation Works
2026_PHEO_126515_1
EICPH-07/2025-26 Dt.20.02.2026
National Competitive Bid
Civil Works - Water Works
Percentage
270 days
Nuapada
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
Yes
₹11.6 L
Yes
5 Jun 2026
27 Feb 2026
20 Mar 2026
27 Feb 2026
20 Mar 2026
27 Feb 2026
27 Feb 2026 - 6 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of RCC ESR & RCC UGR
Supplying all materials, labour, T&P and design, construction, testing & commisioning of R.C.C Reservoir/ R.C.C ESR and piping arrangement upto 5.0 Running meter from external face, Raft/Pile Foundation & Shaft/Column Staging including all work such as soil investigation, earth work in excavation, back filling & disposal of earth, RCC & PCC of required grade, centering and shuttering, brick work, painting, finishing, connection pipes valves fitting, expansion joint, mechanical level indicator etc with lead of all materials to site. | - | - | - | - |
| 2 | Proposed ESR Zone-2 (250 KL). (30 mtr. Ht.) | 1 | Job | 87,60,000 | ₹87,60,000 |
| 3 | Proposed UGR Zone-2 (150 KL). | 1 | Job | 10,32,000 | ₹10,32,000 |
| 4 | Proposed ESR Zone-5 (600 KL). (25 mtr. Ht.) | 1 | Job | 1,87,68,000 | ₹1,87,68,000 |
| 5 | Proposed UGR Zone-5 (300 KL). | 1 | Job | 18,75,000 | ₹18,75,000 |
| 6 | Supplying all materials, labour,T&P and filling sand in foundation and plinth, well watered and rammed with lead of all materials to site. | 160 | Cum | 685.73 | ₹1,09,716.8 |
| 7 | Supplying all materials, labour, T&P for fitting and fixing, testing and commissioning 3 Tonne Capacity EOT Crane at Zone-2, Zone-3 and Zone-5 Pump House Site, Approx span :12 m, Type – Suspended, Worm / Spur gear , Range of lifting – 0 to 8 m, Load Chain – Alloy steel for single Girder with support as per IS 3109 / 6216, Hand Chain – IS 2429 / BS 6405 including installation, testing & commissioning with lead of all materials to site. | 3 | Set | 3,70,000 | ₹11,10,000 |
| 8 | Supplying all materials, labour, T&P and design, Construction & Commisioning of Sunken Pump House size (6.0 m x 5.0 m x 4.0 m Height) at Zone-2, Zone-3 and Zone-5 Site with R.C.C pillar, R.C.C Beam, Lintel, Chajja, roof slab, Fly ash brick work in C.M( 1:6), Cement plaster & painting works with lead of all materials to site. (The height of roof slab should not be less than 4mtr from plinth level).
3 X 30Sqm | 90 | Sqm | 24,119.69 | ₹21,70,772.1 |
| 9 | Laying of CWRM
Cutting asphalt or bituminous road of flexible pavments and disposal of dismantalled materials up a lead of 1000 mtr stacking servicable and unservicable materials separately including cost of all labour, T&P etc. all complete as per the direction of Engineer-in-Charge. | 186.76 | Cum | 998.4 | ₹1,86,461.18 |
| 10 | Cutting concrete road of granular course of flexible pavments and disposal of dismantled materials up a lead of 1000 mtr stacking servicable and unservicable materials separately including cost of all labour, T&P etc. all complete as per the direction of Engineer-in-Charge. | 93.32 | Cum | 1,738 | ₹1,62,190.16 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.33 MB
NUAPADATOWN.pdf
Additional Documents • 25.48 MB
DTCN.pdf
Tender Documents • 1.76 MB
BOQ_582594.xls
BOQ • 0.65 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].