Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹26.0 L
EMD Value
₹52,020
Closing Date
11 Dec 2023, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER
IIM CALCUTTA, ENGINEERING DIVISION, JOKA, D.H Road, Kolkata 700104
Supply, Installation, Testing and Commissioning of 5 nos. UPS unit complete with individual battery set (45 mins backup), 1 yr Comprehensive maintenance of the same including replacement of their batteries in IIMC campus.
2023_IIMCT_781740_1
ED/IIMC/NIT/1/23-24/97A
Open Tender
Miscellaneous Services
Item Rate
365 days
IIM Calcutta, Joka, D.H Road, Kolkata
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,500
IIMC CONSTRUCTION WORKS ACCOUNTS
₹52,020
Yes
IIM CALCUTTA, ENGINEERING DIVISION, JOKA
27 Dec 2023
20 Nov 2023
12 Dec 2023
20 Nov 2023
11 Dec 2023
20 Nov 2023
30 Nov 2023
Amount
Supply,Installation,Testing & Commissioning of the following UPS units (Make = Numeric / Emerson (Vertiv) / APC / Eton / Riello / Gutor/Orion) :-
(a) 30 KVA UPS
(b) 30 KVA UPS
(c) 30 KVA UPS
(d) 15 KVA UPS
(e) 10 KVA UPS
Note:- UPS Warranty = 2 years from date of successful Installation (For technical details refer - Technical data sheet).
(Less) Buy back of following UPS
(a) 30 KVA UPS
(b) 30 KVA UPS
(c) 30 KVA UPS
(d) 15 KVA UPS
(e) 10 KVA UPS
Full Comprehensive AMC of the following UPS (as under SL No - 1.1) of 1 year duration after successful completion of 2 years warranty period.
(a) 30 KVA UPS
(b) 30 KVA UPS
(c) 30 KVA UPS
(d) 15 KVA UPS
(e) 10 KVA UPS
Supply & Installation of following SMF type Battery bank (Make - Exide) for minimum 45 Minutes back up along with interconnecting cables (battery to battery connection), cable from UPS to Battery Bank with battery stand. The Batteries shall have a 2 years warranty from date of installation. Job includes net cost after buyback of old batteries :-
(a) Full Set battery for 30 KVA UPS
(b) Full Set battery for 30 KVA UPS
(c) Full Set battery for 30 KVA UPS
(d) Full Set battery for 15 KVA UPS
(e) Full Set battery for 10 KVA UPS
First lot replacement of battery.
Supply & Installation of following SMF type Battery bank (Make - Exide)for minimum 45 Minutes back up along with interconnecting cables (battery to battery connection), cable from UPS to Battery Bank (If applicable). The Batteries shall have a 2 years warranty from date of installation. Job includes net cost after buyback of old batteries :-
(a) Full Set battery for 30 KVA UPS
(b) Full Set battery for 30 KVA UPS
(c) Full Set battery for 30 KVA UPS
(d) Full Set battery for 15 KVA UPS
(e) Full Set battery for 10 KVA UPS
HIPOTRONICS ENGINEERS
RAJALAKSHMI ENTERPRISE
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .