Tender Value
₹62.5 L
EMD Value
₹62,500
Closing Date
8 Oct 2026, 6:00 pm
Superintending engineer P.H. Circle -Anjar , GWSSB
Providing, Supplying, Lowering, Laying & Jointing of 140 mm 6kg/cm2 PVC pipeline from Vidi SHW to Devaliya Village and 200 mm 6kg/cm2 PVC pipeline From Devaliya to Mathak Village, Tal. Anjar under WSS-6 General Program.
348379
08/2026-27
Open
Civil Works - Water Works
Works
Kutch
8 documents required · 8 mandatory
₹2,400
The Executive Engineer, P H Works Division, GWSSB, Anjar – Kutch
₹62,500
24 Sept 2026
24 Sept 2026
24 Sept 2026
8 Oct 2026
24 Sept 2026
Estimated Cost: Rs. 62,45,258.31/-
Executive Engineer
P.H. WORKS division
Gujarat Water Supply & Sewerage Board
GWSSB Volume-III, PRICE BID
SCHEDULE-A .......................................................... Error! Bookmark not defined.
VOL 3 PRICE BID
GWSSB Volume-III, PRICE BID
(1) Name of Work:- “Providing, Supplying, Lowering, Laying & Jointing of 140 mm 6kg/cm2
PVC pipeline from Vidi SHW to Devaliya Village and 200 mm 6kg/cm2 PVC pipeline From
Devaliya to Mathak Village, Tal. Anjar under WSS-6 General Program.”
(2) The bidder shall quote his firm and fixed price for the entire work under this Contract,
defined in more details in various sections of this bid document.
(3) The rates and prices shall be submitted in the electronic formats given by n-procure which
is called Schedule-B. Rates and prices received in any other formats will be rejected and
the Bids will be disqualified.
(4) It will be entirely at the discretion of the Employer to accept or reject the bidder’s
proposal, without giving any reasons whatsoever and the bidder shall not be permitted to
withdraw his bid on this account.
supplied from the by client.
(6) In Schedule-B the Bidder shall quote prices for the items on lump sum / unit rate as called
for against the BOQ item.
Schedule-B only will be considered for price evaluation & shall form a part of the
Contract Agreement.
Schedule-B and shall be carried forward to Schedule-B for comparison and evaluation.
(9) The Bidder shall quote his prices for Operation & Maintenance in Schedule-C. Bidder
shall give year wise break up of cost for 5 years O&M in Schedule-C/1 to Schedule-C/5
separately for Schedule-C. The total shall be in line to the price quoted in Schedule-C.
The total shall be carried forward to Schedule-B for comparison and evaluation.
(10) Wherever for a particular item the quantities have been specified payment shall be on unit
rate basis and unit variation in quantity will be paid with pro rata basis.
(11) Each item is to be individually priced online and the amounts shall be added up to arrive
blank except where the item description requires the item to be priced on "as applicable”
basis. The item shall not be priced if it is “not applicable” to the bidder’s design, in which
case the bidder shall add the words “NOT APPLICABLE”. The wording in the item
description is for subject matter guidance only; clause references are indicative only and
all other relevant clauses shall also be referred to. The prices shall allow for all the works
covered under the bid and all liabilities and contractual obligations whether separately
specified or not. Items against which no prices are quoted shall not be separately paid for
and the bidder shall be deemed to have covered the cost of execution of such items
(according to the requirements of the bid document) in the prices quoted for other items.
satisfactory working/safety of the system as specified, will not be separately paid for by
the Employer when executed and shall be deemed to be already covered by other items
and rates listed in the price sheets No extra payment shall be given for any item which is
required to complete and perform the project.
VOL 3 PRICE BID
GWSSB Volume-III, PRICE BID
Schedule B will be considered and binding on the Contractor. The prices in Price
Schedule B and Schedule-C of the successful bidder shall be corrected accordingly. Only
for financial evaluation of the bid.
(14) Schedule ‘D gives the basis of interim payment for construction of works.
(15) The bidder shall be deemed to have allowed in his price for provision, maintenance and
final removal of all temporary works of whatsoever nature required for construction
including temporary bunds, diverting water, pumping, de-watering etc. for the proper
execution of works. The rates shall also be deemed to include any works and setting out
that may be required to be carried out for laying out of all the works involved.
(16) Prices shall be filled online only.
Specifications and other sections of these bid documents and these documents are to be
taken as mutually explanatory of one another.
(18) The bidder shall interpret the data furnished and carry out any additional survey work, or
investigation work required at his own cost.
(19) The prices quoted shall also include the cost of materials utilized for testing.
(20) The bidder should acquaint himself with the site conditions including the access to Work
site. The successful bidder shall have to make suitable access to work sites at his own
cost. These accesses will be used by the other contractors working for GWSSB.
shall include all the equipments / materials / accessories and services required as per the
(22) The amount to be quoted for O & M / year shall be as per Volume-IB, General Conditions
of Contract, Clause No. 1, Security Deposit.
(23) 1% of the value of work will be deducted from the Running bill against labour cess which
is non-refundable.
(24) Third Party Inspection / CSC agency will be deployed by GWSSB and charges of the
same will be borne by GWSSB.
(25) Any expenditure incurred by inspection/ CSC agency for the work misinformed by the
contractor and charges of inspection/ CSC agency without any work due to
misinformation shall be recovered from the contractor.
(26) The prices shall be quoted inclusive of all taxes, royalties and duties prevailing at the time
of submission of the bids. Statutory variation if any during the currency of contract shall
have to borne by the agency which shall be not reimbursed by the GWSSB.
(27) The rates should be quoted Exclusive of GST and all other taxes as per Volume-I (B),
General Conditions of Contract, Clause No.
(28) The rates quoted shall be inclusive of all other taxes but excluding GST, duties which
shall not be paid extra. The TDS shall be deducted at source as per provision of IT rules
and GWSSB policy.
(29) The Bidders shall have to quote the rates in this tender Excluding GST. The Complete
responsibility of taxes, duties, levies rests with the Contractor/Agency only.
(30) The process requires that the bidder shall quote his price for the work components
during the entire period of performance of the contract except price variation allowed for
supply of MS/DI/PVC/GI pipe as per Volume-IB Clause No. 59, General Conditions of
VOL 3 PRICE BID
GWSSB Volume-III, PRICE BID
(31) Payment shall be made for the components for which lump sump prices are quoted, as
per the schedule of payment. Total cost will be worked out on the basis of work done of
individual items and rates quoted against those particular items only.
(32) Royalties: The contractor shall be liable to pay the royalty of the quarried materials/
minerals used in the construction of works at the rates specified in the Narmada Water
Resources, Water Supply & Kalpsar Dept. Resolution No. GEN-2010-595- (6)- M.I.Cell
( K-1) Dt. 29-4-2011 ( Gujarati Version Copy enclosed) and shall be recovered from the
running bills of the work from time to time and remaining amount if any shall be
recovered from the final bill before releasing the security deposit of the work. The
contractor shall furnish the statement showing the quantity of quarried materials /
minerals from whom purchased (with full address of the seller) and copies of the bills for
purchase to the Executive Engineer of the in charge of the work. The contractor shall also
furnish such additional information as regards royalty payment to the competent
(33) Agency shall have to take Insurance policy and intimate to GWSSB along with the
evidence within time limit. In case of noncompliance entire responsibility shall be rest
with the agency and required amount shall be recovered from any due amount of the
(34) GWSSB can recover penalty amount from the agency for not taking the insurance.
Though the penalty amount is recovered, responsibility of the agency for taking insurance
shall be continued and will not be escaped from the responsibility.
(35) The contractor shall apply fair means of stock maintenance and shall adopt accounting
standard as may be prescribed under GST Act as applicable in the state of Gujarat. For
arriving at the difference in procurement prices due to introduction of GST it will be open
for the Board to ask for original invoices, lorry receipt, weigh bridge slips, payment
details and such other documents as may be required for the purpose.
(36) The claim of contractor regarding GST shall have to be backed by documentary evidence
substantiating the actual payment of tax duly certified by the competent tax authority. The
final decision regarding the quantum of claim amount to be recovered or reimbursed shall
be of the competent authority of the GWSSB and shall be binding on the contractor.
Signature of contractor Executive Engineer
VOL 3 PRICE BID
GWSSB Volume-III, PRICE BID
Bidders are required to fill up all the blank spaces in this Bid Form.
THE EXECUTIVE ENGINEER,
PUBLIC HEALTH WORKS DIVISION,
SUB: “Providing, Supplying, Lowering, Laying & Jointing of 140 mm 6kg/cm2 PVC pipeline from Vidi
SHW to Devaliya Village and 200 mm 6kg/cm2 PVC pipeline From Devaliya to Mathak Village, Tal.
Anjar under WSS-6 General Program.” The bidder shall quote his firm and fixed price for the entire
work under this Contract, defined in more details in various sections of this bid document.
1. Having visited the site and examined the Bid Documents, Drawings, Conditions of Contract,
Addenda/Amendments to the above, for the execution of the above Contract, we the undersigned
offer to design, Engineer, procure, construct, complete, commission, operate and maintain the
whole of the said works for 5 years from the date of commissioning including defects liability
period as given in Conditions of Contract and in conformity with the drawings, conditions of
Addenda Nos.__________ (insert numbers) for Lump sum fixed price of
Construction including free trial run for three months or such other sum as may be ascertained in
accordance with the conditions.
2. I/We agree that
a) if we fail to provide required facilities to the Employer’s representative or any other
person/Agency by the Employer to perform on his behalf for carrying out the inspection and
testing of materials and workmanship.
b) if we incorporate into the Works, materials before they are tested and approved by the Engineer’s
representative.
c) if we fail to deliver pure water of required quantity according to the conditions/stipulations
of the Contract, the Engineer will be at liberty to take any action including termination of Contract
and impose at his absolute discretion any penalties, and/or reject the work.
3. We undertake, if our Bid is accepted, to complete and deliver the works in accordance with the
Contract within _________ months, inclusive of monsoons, from the date or receipt of Letter of
Acceptance issued to us by you.
4. We agree to abide by this Bid for a period of 180 days from the Last date of submission of the bill
and it shall remain binding upon us and may be accepted at any time before the expiry of that
5. In the event of our Bid being accepted, we agree to enter into a formal Contract Agreement with
you incorporating the conditions of Contract there to annex but until such agreement is prepared
VOL 3 PRICE BID
GWSSB Volume-III, PRICE BID
this Bid together with your written acceptance thereof shall constitute a binding Contract between
6. We agree, if our Bid is accepted, to furnish performance /Security in the forms and of value
specified in the Clause 1 of Volume-IB, “General Conditions of Contract”.
7. We have independently considered the amounts of liquidated damages shown in Appendix to Bid
and agree that they represent a fair estimate of the damages likely to be suffered by you in the
event of the work not being completed by us in time.
8. We understand that you are not bound to accept the lowest or any Bid you may receive.
(Name of the Person)
Company Seal _____________________
Duly authorized to sign Bid for and on behalf of (fill in block capitals)
Witness Signature ___________________________
VOL 3 PRICE BID
GWSSB Volume-III, PRICE BID
NAME OF SCHEME –
“Providing, Supplying, Lowering, Laying & Jointing of 140 mm 6kg/cm2 PVC pipeline from
Vidi SHW to Devaliya Village and 200 mm 6kg/cm2 PVC pipeline From Devaliya to Mathak
Village, Tal. Anjar under WSS-6 General Program.” The bidder shall quote his firm and fixed price
for the entire work under this Contract, defined in more details in various sections of this bid document.
Sr Particular of Material Quantity Rate Unit Place of
1 The contractore submmitting the tender should see that rates in schedule 'A' are filled in by the
Engineer in charge at the time of issue of tender
2 Store to be supplied free of cost to the contractor for the work mentioned in schedule 'A'
3 Other pipe jointing materials such as twishted hemp yarn bolts,nuts,washer & veriouse size
rubber packing zink white at his own cost. This shall be of the quality got previously approved
by Engineer- in - Charge.
4 Contractor shall provided own his arrangment at his own cost for loading, unloading &
transporting safely to the site of work the materials mentionad in schedule 'A'
5 Any materials required for item other than tender items mentioned above & materials in not
included in schedule 'A' if such materials are available with departmant will be issued on
request from the contractor ( for use on work under this contract only)
6 ClauseNo. 12-A of B-1 form shall be applicable in case of materials mentioned above to be
issued free of cost the contractor for use in the work. The issue rates for non return of surplus
materials the recovery shall be a made at double the issued rate.
EXECUTIVE NGINEER
P. H. WORKS DIVISION (GWSSB)
Contractor's Signature ANJAR- KACHCHH
VOL 3 PRICE BID
GWSSB Volume-III, PRICE BID
SUMMARY (SCHEDULE-B)
“Providing, Supplying, Lowering, Laying & Jointing of 140 mm 6kg/cm2 PVC pipeline from Vidi
SHW to Devaliya Village and 200 mm 6kg/cm2 PVC pipeline From Devaliya to Mathak Village,
Tal. Anjar under WSS-6 General Program.”
Sr No. Name of Work Amount Rs.
SCHEDULE - B 62,45,258.31/-
Total Amount (1) 62,45,258.31/-
Total Amount (1) 62,45,258.31/-
Rebate on above tender (if any)…………%
Net Considering Rebate (3-4)
GUJARAT WATER SUPPLY & SEWERAGE BOARD
Public Health Sanitary Sub-Divison
NAME OF WORK:- “Providing, Supplying, Lowering, Laying & Jointing of 140 mm 6kg/cm2 PVC pipeline from Vidi
SHW to Devaliya Village and 200 mm 6kg/cm2 PVC pipeline From Devaliya to Mathak Village, Tal. Anjar under WSS-6
General Program.”
SR DESCRIPTION QTY UNIT RATE AMOUNT
Providing and supplying in standard length ISI mark rigid unplasticised
PVC pipes suitable for potable water with ringfit joint including cost of
rings, as per IS specification no. 4985/1988 including all local and central
taxes, transportation, freight charge, octroi, inspection charge,
unloading,conveyance to the department storemand including cost of
jointing material etc. Complete
200 mm dia PVC 6 kg/cm2 Pipe 3906.00 RMT 665.00
140 mm dia PVC 6 kg/cm2 Pipe 5292.00 RMT 326.00
Providing specials such as tees, bends, reducers, etc, complete.
200 mm dia PVC 6 kg/cm2 Pipe
PVC Bend 90 Degree 200 mm 6 kg/cm2 (fabricated) 4.00 No. 3244.00
PVC Couplers 200 mm 6 kg/cm2 (fabricated) 4.00 No. 678.00
C.I.D. Joints Class -15 Short Collar with ISI Mark 200 mm 4.00 No. 581.00
140 mm dia PVC 6 kg/cm2 Pipe
PVC Bend 90 Degree 140 mm 6 kg/cm2 (fabricated) 4.00 No. 1037.00
PVC tail piece with P.V.C flange 140 mm ISI Heavy Duty (moulded) 4.00 No. 604.00
PVC Couplers 140 mm 6 Kg (Fabricated) 4.00 No. 295.00
VOL 3 PRICE BID
GWSSB Volume-III, PRICE BID
Excavation for pipe line trenches incl. all safety provisions using site rails
and stacking excavated stuff up to a lead of 90 mts. cleaning the site etc.
complete for lifts up to 1.5m depth and strata as specified.
a) In all sorts of soil and soft murrum 2252.16 CU.M 89.00
b)In hard murrum, boulders incl. macadam road. 1689.12 CU.M 135.00
c) In soft rock and/or masonry in CM or L M or Lime Concrete. 1126.08 CU.M 163.00
d) In hard rock and/or in C. C. 1:2:4 or RCC with blasting, breaking, 563.04 CU.M 372.00
chiseling, or by chiseling/breaking only.
Lowering, laying and jointing PVC pipes and specials of following class and
diameter including cost of conveyance from stores to site of works including
cost of labour, material, except cement solvent, giving satisfactory hydraulic
testing as per ISI code
200mm dia PVC 6kg/cm2 pipe 3720.00 RMT 37.00
140 mm dia PVC 6 kg/cm2 Pipe 5040.00 RMT 23.00
Providing and supplying ISI mark CI D/F Sluice Valves , Butterfly Valves
& Reflux Valves of following class and diameter including all taxes,
insurance, transportation, freight charges, octroi, inspection charges,
loading, unloading, conveyance to departmental stores, stacking etc.
a) Sluice valves 200 mm dia with ISI mark PN-1 4.00 NO. 9813.00
b) Sluice valves 150 mm dia with ISI mark PN-1 4.00 NO. 5848.00
Lowering, laying and jointing in position following C. I. / D/F Reflux
valves, Butterfly valves, Sluice valves and Air valves including cost of all
labour, jointing material, including nut bolts and giving satisfactory
hydraulic testing, etc. complete
Sluice valve 200mm 4.00 NO. 742.00
Sluice valve 150mm 4.00 NO. 585.00
Construction of valves chambers in brick or bela stone masonary, locally
available in C. M. 1:6.Foundation concrete 150 mm thick in C. C. 1:4:8 of
trap metal size 25 mm to 40 mm thick, inside cement plaster in C. M. 1:3
and cement pointing outside in C. M.1:3 and top cover of precast RCC slab
100mm thick(with key hole in two parts, each with handles or MS bar etc.
complete as given size) up to 1mt depth from GL to pipe invertlevel
incl.complete civil work excl. cost of excavation & refilling.with cast in situ
RCC slab in one single piece with fixing of CI-Mh frame and cover with
23mm thich brick masonary wall in CM. 1:6
200mm dia PVC 6kg/cm2 pipe
with single piece 10cm with fixing M.H.cover
size of chamber 0.90X0.90X1 mtr 4.00 NO. 7343.00
140mm dia PVC 6kg/cm2 pipe
with single piece 10cm with fixing M.H.cover
VOL 3 PRICE BID
GWSSB Volume-III, PRICE BID
size of chamber 0.60X0.60X1 mtr 4.00 NO. 5138.00
Providing and supplying C. I. Temper proof Air valves with SS 304 Float
gun metal- nozzle of approved make & quality of following class and
diameter including all taxes, insurance, transportation, freight charges,
octroi, inspection charges, loading, unloading, conveyance to departmental
stores, stacking etc. complete.
Air valve 50mm dia without isolating air valve PN 1. 19.00 NO. 5499.00
Lowering, laying and jointing in position following C. I. / D/F Reflux
valves, Butterfly valves, Sluice valves and Air valves including cost of all
labour, jointing material, including nut bolts and giving satisfactory
hydraulic testing, etc. complete
Air valve 50 mm dia 19.00 NO. 379.00
Erection of air valve riser by installing new m.s. Pipe of 6 mm thick and
mt length with necessary fitting such as flange of appropriate size, nut bolts
and emnedded the pipe in RCC M 15 with offset of 10 cm around pipe with
necessary steel etc complete complete.
50 mm dia. air valve & MS pipe 19.00 NO. 3112.00
Refilling the pipeline trenches incl. ramming, watering, consolidating 5430.00 CU.M 22.00
desposal of surplus stuff as directed within a radius of 3 km.
Providing C.C.M : 100 for encasing pipe using trap metal size 12mm to
50mm including formwork curing consolidation etc. complete for various
location on pipe line
using trap metal 20mm nominal size 7.46 CU.M 4113.80
Drilling of Horizontal borehole for watermain pipeline under the
Railway/Road tracks in all srata with required length incl fixing of M.S. (or
as specified by Railway/Road Authority) casing pipe of suitable size and
thickness, rate includes the cost of drilling of bore hole, casing pipe &
welding pushing etc complete but excluding the cost of watermain, valves
and other items, entire work should be as per approved drawing and as per
instructions of Railway/Road Authority for following dia of borehole for
Horizontal Drilling-300: & MS Casing Pipe-250 thick:5 150.00 Mtr 2553.00
VOL 3 PRICE BID
GWSSB Volume-III, PRICE BID
I / We am / are willing to carry out at -------------- % above / below
................................... ( Percent should be written in figures and words )
Estimated amount Rs. 6245258.31 Estimated amount Rs.
Tender Amount in Rs. :- ………………………… Tender Amount in Rs. :-…………..
In words Rs. :- ……………………….. In words Rs. :- …………………
Contractor Signature Deputy Executive Engineer
P H Works Division
VOL 3 PRICE BID
GWSSB Volume-III, PRICE BID
1. As mentioned in the Conditions of contract, the Contract being a lump sum type turnkey Contract
on EPC basis, the provision of measurement will be applicable only for the assessment of value of
work done for inclusion in any interim certificate for part payment to the Contractor.
2. The Schedule specifies the procedure for all such assessment of the items specified in Schedule B.
3. Each item of Schedule-B has been divided into broad components. The Employer's Representative
shall assess the value of each component as indicated in paragraph 6 herein below.
4. Percentages are indicated against each component of each items specified in Schedule B, based on
the Employer's best appreciation of the value of the component as related to the total costs of the
concerned item as whole. A head titled (any other item(s)) is included in each breakdown of
schedule and the tenderer shall at the time of tendering indicate any additional items which he
considers necessary but cannot be covered by any of the heads indicated in the breakup.
5. The percentage breakup as indicated in the Schedule may differ from that corresponding to the
tenderer’s scheme and design and he should take this into account while quoting his lump sum
prices for the items specified in Schedule-B.
6. The contractor shall, after approval of his detailed designs and drawings furnish to the Employer's
Representative an initial bill of quantities to all major items, to be reviewed and updated
periodically with the Employer's Representative. This bill of quantities will be used for assessment
of percentage progress of the component at any stage. By measurement jointly taken by the
Employer's Representative and the Contractor, mutually agreed and entered in the measurement
books in the form and by the method approved by the Employer's Representative, and signed jointly
by both the parties.
7. Before carrying out the work by the contractor in this tender, the actual survey-based pipeline
hydraulics for the pipeline network has to be approved at the competent level, and the quantity of
pipes has to be obtained accordingly. Payment will not be made for the quantity of additional pipes
other than the approved quantity i.e., Excess pipes that do not have to be laid.
8. Agency Have to provide Samsung Androide 55” Smart 4K LED TV free of cost
9. Agency Have to Provide 185 L 5 Star Godreg Fridge
VOL 3 PRICE BID
GWSSB Volume-III, PRICE BID
BREAK UP FOR INTERIM PAYMENTS
(CIVIL, MECHANICAL, INSTRUMENTATION & ELECTRICALWORKS)
Item Description of Items Percentage Payment to
a On receipt of materials at project site 65 % of Quoted rate
b On Excavation, Lowering, laying and Jointing 20 % of Quoted rate
c On Hydraulic testing 5 % of Quoted rate
d On refilling and disposal of surplus stuff 5 % of Quoted rate
e After commissioning 5 % of Quoted rate
g On receipt of materials on site 70 % of Quoted rate
h On erection 20 % of Quoted rate
i On Hydraulic testing 5 % of Quoted rate
j After commissioning 5 % of Quoted rate
3 STAFF QUARTERS / PUMP ROOM
a. On approval of Designs 2.0 % of Quoted rate
b. On completion of Excavation & base slab 18.0 % of Quoted rate
c. On completion of vertical wall up to plinth 20.0 % of Quoted rate
d. Full supporting structure incl. ring beam and top slab 15.0 % of Quoted rate
e. On completion of pump house incl. fixing doors 10.0 % of Quoted rate
f. Plastering inside & outside with epoxy paint etc 10.0 % of Quoted rate
(completed with all respects)
g. Painting of letters, MS ladder pipe, railing and all 15 % of Quoted rate
miscellaneous items such as snowcem paints in three
coats etc. (completed with all respects)
h. After Completion 10 % of Quoted rate
4 GROUND (UNDERGROUND) LEVEL
RESERVOIRS/SUMPS
a. On approval of designs 2 % of Quoted rate
b. On completion of excavation and base slab 18 % of Quoted rate
c. On completion of vertical wall and braces 20 % of Quoted rate
d. Full supporting structure including column, ring beam 15 % of Quoted rate
and completion of top slab / dome
e. Plastering inside & outside with epoxy etc. complete 10 % of Quoted rate
f. Procurement and fixing of inlet, outlet, washout, 15 % of Quoted rate
overflow pipes, valves, specials, chambers, lighting
arrester conductor and specials at site
g. Water level indictor, painting of letters, M.S ladder, 10 % of Quoted rate
pipes, railing and all miscellaneous items such as
VOL 3 PRICE BID
GWSSB Volume-III, PRICE BID
snowcem paint in three coats etc (Completed with all
respect) including water tightness test
h. On hydraulic testing 10 % of Quoted rate
5 All Electro-mechanical works and
Instrumentation
a. On supply of material at work site in good condition 65% of Quoted rate
b. On erection of Equipment 25% of Quoted rate
c. On completion of Testing & Commissioning of 5% of Quoted rate
d. Satisfactory running of system. 5% of Quoted rate
6 WATER TREATMENT
PLANT(CONVENTIONAL )
(I) Site survey and subsoil investigations 1% of Quoted rate
Completion of field surveys and subsoil 25%
investigations and de-mobilization from site of survey
Submission of surveys and soil investigation reports 75%
and acceptance by the Engineer
(II) Detailed designs and construction documents 2% of Quoted rate
Substantial completion, submission and approval by 60%
the Engineer of the designs, drawings and
documents for all major items of work
Submission and approval by the Engineer of the final 40%
designs and construction documents for all remaining
and miscellaneous construction details and working
(III) Inlet chamber 4% of Quoted rate
Excavation 5.0%
Works up to Ground Level 10.0%
RCC works up to top including all supply and fixing 60%
related materials
Finishing all surfaces including painting 15.0%
Hydraulic test 5.0%
Commissioning 5.0%
(IV) Raw water channel from inlet chamber To 2%
1 Excavation for supporting structure 5.0%
Works up to G.L. 15.0%
All RCC works including all supply and fixing of 30.0%
related materials upto floor level
VOL 3 PRICE BID
GWSSB Volume-III, PRICE BID
Completion of all civil works including all supply and 35.0%
fixing of related materials
Hydraulic test 10.0%
Commissioning 5.0%
V) Flash Mixer 4 % Quoted rate
Excavation 5.0%
Works up to Ground Level 10.0%
R.C.C. works up to top including all supply and fixing 60.0%
of related materials
Finishing all surfaces including painting 15.0%
Hydraulic test 5.0%
Commissioning 5.0%
VI) Clariflocculator Works 2 0 % Quoted rate
RCC wall upto flooring including all supply and 30%
fixing of related materials
RCC wall upto 1st lift (50% of the design height) 5%
RCC wall lupto 2nd lift (100% of the design height) 10%
RCC wall upto top including all supply and fixing of 20%
related materials
Remaining all works including all supply and fixing 15%
of related materials
Hydraulic testing of water retaining structures 5%
Finishing of all surfaces and painting coating etc. 5%
Commissioning 5%
VII) RCC Channel from Clariflocculator to Filter Bed 5% Quoted rate
RCC Works for floor slab including all supply and 40%
fixing of related materials
Completion of all works and finishing all surfaces 50.0%
including painting, supply and fixing of related
Hydraulic test 5.0%
Commissioning 5.0%
VIII ) Filtration Works 40% Quoted rate
RCC wall upto filter floor level including pure water 10%
channel floor slab
Up to operating platform 15%
RCC wall upto top slab including all laboratory and 30%
Completion of all the remaining works including back 30%
wash tank and related arrangements; all supply and
fixing of related materials
VOL 3 PRICE BID
GWSSB Volume-III, PRICE BID
Hydraulic testing/liquid retaining structures 5%
Commissioning 5%
IV ) Chemical Works 15%Quotedrate
Excavation 5.0%
RCC/Masonry work below plinth 15%
RCC work upto 1st floor 30%
RCC works upto roof slab 20.0%
Completion of the remaining works including 30%
painting, finishing; supply and fixing of related
X Miscellaneous Works
THESE WORKS INCLUDES
By pass CI pipeline from Inlet chamber to clear water
CI pipeline from flash mixer to clariflocculator.
Pure water CI pipeline from filter beds to clear water
sump. 5% Quoted rate
Bye pass CI pipeline from clariflocculator to clear
CI wash water pipeline from proposed wash water
tank to filter beds.
Wash water CI pipeline from filtration bed to Natural
XI All other related and required works as directed 2% of Quoted rate
Submission of As built drawings and training to staff
10 Valve chambers
A On completion works as per approved drawings 95% of Quoted rate
B After commission of system 5% of Quoted rate
11 Miscellaneous work
A All other items such as encasing, columns support for 80% of quoted rate on
culvert, pipe bridges for Canal /Drain/Khadi crossing, completion of works
internal roads, railway/highway crossing, Anchor/thrust
blocks, steel bridge for pipe crossing, Construction of
Compound Wall & Repairing and Renovation work etc.
B On commissioning of the system 20% of quoted rate
12 Operation and Maintenance
A Every month in equal instalment based on quoted prices
of O & M will be paid
Note: Any Changes to be made in all above Payment Schedule can be decided by
Chief Engineer, Zone-4, Kachchh and it shall be binding to the contractor
VOL 3 PRICE BID
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
01 Vol 1 A Tech Bid.pdf
02 Vol 1B 2-GCC_compressed_compressed 2.pdf
03 Vol 3A Extent of work.pdf
04 Vol 2B Tech specification.pdf
Vol 3 Price Bid.pdf
Vol 4 Drawings.pdf
Shedule A.pdf
Shedule B.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .