Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.1 CrAccepted-AOC GROUND FLOOR SSK ENCLAVE SSK ENCLAVE DEEVAR ROAD PERUMANOOR KOCHI KERALA 682015 | ERNAKULAM | KERALA | 682015 | ₹3.1 Cr Quoted ₹3.3 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹3.3 Cr+₹3.3 L (0.98%)Rejected-Finance | ₹3.3 Cr+₹3.3 L (0.98%) | L2 | Rejected-Finance REJECTED |
| 3 | L3₹3.4 Cr+₹3.9 L (1.17%)Rejected-AOC | ₹3.4 Cr+₹3.9 L (1.17%) | L3 | Rejected-AOC REJECTED |
Tender Value
Refer Docs
EMD Value
₹1 L
Closing Date
6 Dec 2019, 4:00 pmClosed
DGMM
TELK ANGAMALY
Biennial Contract for House Keeping of TELK Campus
2019_TEKL_322652_1
TELK/C AND M/FSC/HK/228/2019
Open Tender
Housekeeping/ Cleaning
Item Wise
730 days
TELK ANGAMALY
Please refer Tender documents.
8 documents required · 8 mandatory
₹7,500
Yes
online
₹1 L
Yes
4 Feb 2020
19 Nov 2019
9 Dec 2019
19 Nov 2019
6 Dec 2019
19 Nov 2019
PART A Complete upkeeping of offices, residential building and toilets in TELK by Sweeping, wet cloth moping, cleaning of sanitary fittings, floor and wall tiles, cleaning of premises of toilets etc. as detailed below by deploying a minimum of 8 trained women labourers and 1 supervisor/day on a full time basis including cost of labour and material. Please refer 'Detailed Specification of Work under BOQ Part A ie., Annexure - A of BOQ attached. (Lump Sum rate per day for undertaking the above scope of work shall be quoted here).
Supply of special labour for closing leakages of roof of factory buildings, office & residential buildings using tar felt, roofing compound & leak proofing materials including changing of hook bolts & washers, asbestos & polycarbonate sheets and repairing & painting of gutters & down water pipes with Al.sheets & MS plates etc. complete as and when required. Necessary materials supplied by the company free of cost. (Rate per man day shall be quoted here)
FACTORY AND FACTORY OFFICE CLEANING, SHOP ARRANGEMENT, LOADING AND UNLOADING OF MATERIALS, MOVEMENT OF MATERIALS TO DIFFERENT LOCATIONS ETC. BY DEPLOYING A MINIMUM OF 10 MEN IN FIRST SHIFT, 3 MEN IN SECOND SHIFT ON A FULL TIME BASIS as a lump sum work :- Lunpsum rate for undertaking the above work by deploying a minimum of 10 trained persons on 1st shift. (Lumpsum rate per day for deploying minimum 10 persons in Ist shift shall be quoted here)
FACTORY AND FACTORY OFFICE CLEANING, SHOP ARRANGEMENT, LOADING AND UNLOADING OF MATERIALS, MOVEMENT OF MATERIALS TO DIFFERENT LOCATIONS ETC. BY DEPLOYING A MINIMUM OF 10 MEN IN FIRST SHIFT, 3 MEN IN SECOND SHIFT ON A FULL TIME BASIS as a lump sum work :- Lumpsum rate for undertaking the above work by deploying a minimum of 3 trained persons on 2nd shift. (Lumpsum rate per day for deploying minimum 3 persons in 2nd shift shall be quoted here)
PART B Labour Charges in the case of additional labourers to be supplied in order to meet urgent works and that not covered under 1.0, 2.0, 3.1 & 3.2. The bidders shall quote only the rate of labour on daily wage rate and overtime rate, shift allowance etc. against 4.1(a), 4.2 (b), 4.3 (c), 4.4 (d), 5.1 (a), 5.2 (b), 5.3 (c), 6.1(a), 6.2(b), 6.3(c), 7.1(a), 7.2(b), 7.3(c), 7.4(d), 8.1(a), 8.2(b), 8.3(c), 8.4(d), 9.1(a), 9.2(b), 9.3(c), 9.4(d), 10.1(a), 10.2(b), 10.3(c), 10.4(d), 11.1(a), 11.2(b), 12.1(a), 12.2(b), 13.1(a), 13.2(b), 13.3(c), 14.1(a), 14.2(b), 14.3(c). Charges for Man labourers a) During day shift (rate for man labour per day shall be quoted here)
b) During night shift (rate for man labour per day shall be quoted here)
c) Overtime after Duty shift on working days (rate for man labour per hour shall be quoted here)
d) Overtime on Sundays and other Holidays (rate for man labour per hour shall be quoted here)
Women labourers a) During day shift (rate for woman labour per day shall be quoted here)
b) Overtime after Duty shift on working days (woman labour rate per hour shall be quoted here)
c) Overtime on Sundays and other Holidays (woman labour rate per hour shall be quoted here)
Women Special labourers a) During day shift (rate for woman labour per day shall be quoted here)
b) Overtime after Duty shift on working days (rate for woman labour per hour shall be quoted here)
c) Overtime on Sundays and other Holidays (rate for woman labour per hour shall be quoted here)
Painter labourer (work at below 4 m height) a) During day shift (rate per man day shall be quoted here)
b) During night shift (rate per man day shall be quoted here)
c) Overtime after Duty shift on working days (rate per man hour shall be quoted here)
d) Overtime on Sundays and other Holidays (rate per man hour shall be quoted here)
Special men labourer/Painter (Work at 4m height to 6m height) a) During day shift (rate per man day shall be quoted here)
b) During night shift (rate per man day shall be quoted here)
c) Overtime after Duty shift on working days (rate per man hour shall be quoted here)
d) Overtime on Sundays and other Holidays (rate per man hour shall be quoted here)
Painter (work at above 6 m height) a) During day shift (rate per man day shall be quoted here)
b) During night shift (rate per man day shall be quoted here)
c) Overtime after Duty shift on working days (rate per man hour shall be quoted here)
d) Overtime on Sundays and other Holidays (rate per man hour shall be quoted here)
Mason/carpenter a) During day shift (rate per man day shall be quoted here)
b) During night shift (rate per man day shall be quoted here)
c) Overtime after Duty shift on working days (rate per man hour shall be quoted here)
d) Overtime on Sundays and other Holidays (rate per man hour shall be quoted here)
Gardener a) During day shift (rate per man day shall be quoted here)
b) Overtime on Sundays and other Holidays (rate per man hour shall be quoted here)
Labour for closing leakages a) Overtime after Duty shift on working days (rate per man hour shall be quoted here)
b) Overtime on Sundays and other Holidays (rate per man hour shall be quoted here)
Labour for Cob web removal from plant ceiling a) During Day shift (rate per man day shall be quoted here)
b) Overtime after Duty shift on working days (rate per man hour shall be quoted here)
c) Overtime on Sundays and other Holidays (rate per man hour shall be quoted here)
Labour for Cob web removal above 6m height a) During day shift (rate per man day shall be quoted here)
b) Overtime after Duty shift on working days (rate per man hour shall be quoted here)
c) Overtime on Sundays and other Holidays (rate per man hour shall be quoted here)
Addon Integrated Facility Solution
TK Jose
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .