Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance OFFICE NO 507 ELLORA FIESTA PLOT NO 08 SANPADA SECTOR 11 NAVI MUMBAI MAHARASHTRA 400705 | THANE | MAHARASHTRA | 400705 | Admitted-Finance |
| 2 | GHR Marine Training & Certification Services Pvt. Ltd. Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance 102 JASMINE PLOT N0 15 SECTOR 44 SEAWOODS WEST 400706 THANE MAHARASHTRA 400706 | THANE | MAHARASHTRA | 400706 | Admitted-Finance |
| 4 | Admitted-Finance 22 1 48 1 CHENGALARAOPETA BEACH ROAD VISAKHAPATNAM ANDHRA PRADESH 530001 | VISAKHAPATANAM | ANDHRA PRADESH | 530001 | Admitted-Finance |
| 5 | Admitted-Finance NO 12 HARIKRISHNAPURAM SAWYERPURAM TUTICORIN THOOTHUKUDI TAMIL NADU 628251 | TUTICORIN | TAMIL NADU | 628251 | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
26 Mar 2024, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Manager SRC-OS
Hindustan Shipyard Limited Gandhigram SR Complex Visakhapatnam 530 005
Main Engine Routines on TCI PRABHU
2024_HSL_94596_1
20 / 22023 / 108 / ME / 2023-24
Open Limited
Miscellaneous Services
Service
7 days
HSL Visakhapatnam
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
Exempted
2 Apr 2024
21 Mar 2024
26 Mar 2024
21 Mar 2024
26 Mar 2024
21 Mar 2024
Amount
Main Engine routines, MAKE : MAK 6M25 & JOB NO : 1051,1108,1109 Crank web deflection to be taken prior (hot codition) and after docking. Record to be submitted. Main Engine two unit Decarboininzation to be carried out, Same two unit main bearing and bottom end bearing to be removed and presented to the class surveyor. Then all must be boxed back. Spares ship supply
DISCONNECT AND REMOVE ALL CYLINDER HEAD MOUNTINGS. DISMANTLE CYLINDER HEADS AND SEPARATE THEM FROM COOLING JACKETS. THROUGHLY CLEAN CYLINDER HEADS AND COOLING JACKET SURFACES. RENEW ALL “O”RINGS AND ASSEMBLE CYLINDER HEADS AND COOLING JACKETS. CYLINDER HEAD COOLING SURFACES TO BE PRESSURE TESTED TO 06 KGS / CM2 AND SHOWN TO 2EO & CEO.ALL CYLINDER HEAD MOUNTINGS POCKETS AND SEATS TO BE THOROUGHLY CLEANED AND SEATS TO BE LAPPED. CYLINDER AIR STARTING V/VS RELIEF V/VS FUEL V/VS AND INDICATOR VALVES TO BE O’HAULED AND TESTED TO PROVE SATISFACTORY OPERATION AND SHOWN TO 2EO / CEO. CYLINDER HEAD RELIEF V/VS TO BE PRESSURE TESTED TO CORRECT OPENING PRESSURE & SHOWN TO 2E/O & CEO. INDICATOR V/VS LEAK TEST TO BE SHOWN TO 2EO / CEO. AFTER THE APPROVAL OF SURVEYORS & SUPTD ALL THE MOUNTINGS TO BE ASSEMBLED & FITTED BACK IN PLACE AS THE ORIGINAL.
LINER WITHDRAWAL & REFITTING PER UNIT. ALL LINER SURFACES & SCAVENGE PORTS TO BE THROUGHLY CLEANED. L.O.QUILL PASSAGES TO BE THROUGHLY BLOWN THROUGH WITH COMPRESSED AIR & CLEARED. LINERS TO BE CALIBRATED AND READINGS TO BE RECORDED. CARRY OUT DYE CHECK ON ALL CYLINDER LINERS IN WAY OF TOP AND BOTTOM L.O.GROOVES FOR DETECTING CRACKS & SHOWN TO SURVEYORS & SUPDT. LINER PORT EDGES TO BE SMOOTHENED .
CHECK AND RECORD Main BEARING CLEARANCES AND BRIDGE GAUGE READINGS BEFORE AND AFTER INSPECTIONDISMANTLE BEARING AS PER MAKER INSTRUCTIONALL PARTS TO CLEAN AND SHOW IT TO SURVEYORJOURNAL TO POLISH PRIOR BOXING UPDYE PNETRANT TEST TO BE CARRIED OUT FOR CHECKING ANY CRACKAFTER SUCCESSFUL COMPLETION OF SURVEY BEARINGS TO BE BOXED BACK WITH OLD/NEW SHELLSATISFACTORY RUNNING TRIAL TO GIVEBRG TEMP TO BE MONITORED AND RECORDED DURING RUNNING TRIAL.
PISTON HOLDING NUTS TO BE OPENED. PISTON RING GROOVES TO BE THOROUGHLY CLEANED. GROOVES & PISTON RINGS TO BE CALIBRATED & READINGS TO BE RECORDED. PISTON TO BE DISMANTLEDPARTS TO BE CLEANED AND EXAMINED.DP TEST TO BE CARRIED OUT ON PISTON CROWN AND PSTON SKIRT AND CHECKED FOR FRETTING AND CRACKS AS PER MAKER INSTRUCTION.PARTS TO BE PRESENTED FOR SURVE AND AFTER APPROVAL ASSEMBLE ALL PISTON AS PER MAKER'S INSTRUCTION. ALL PISTONS TO BE PRESSURE TESTED WITH OIL TO 10 BARS IN PRESENCE OF SURVEYORS & SUPTD/CEO. PISTON ROD TO BE GAUGED. PISTONS TO BE ASSEMBLED WITH NEW PISTON RINGS.
Connecting rod to be dismantled, big end and gudgeon pin bearings to be replaced.Calibration to be carried out between big end bearing and crank pin and to be recorded.
Main Einge Turbocharger to be removed and refitted
VOYAGER MARINE SERVICES INDIA PRIVATE LIMITED
Fuji Technical Services Pvt Ltd
SRI SRINIVASA ENGINEERING WORKS
NASS Engineering Services Pvt Ltd
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Restricted Tender
This is a Open Limited tender. Documents are accessible only to bidders authorized by the issuing authority on the government portal.
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .