Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance JAKHANADEVI DISTRICT ALMORA UTTARAKHAND | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
20 Dec 2021, 5:00 pmClosed
Executive Engineer
Office Of The Executive Engineer Uttarakhand Jal Sansthan Almora
Shifting of 300 mm dia and 8.4 mm thickness MS ERW Rising Main pipe line from Medical College Campus, Almora under Almora water supply scheme
2021_UKJS_39606_1
3686/Nivida/1493 dated 4.12.2021
Open Tender
Civil Works - Water Works
Item Wise
180 days
Almora
Please refer Tender documents.
3 documents required · 3 mandatory
₹7,420
Executive Engineer, UJS
Exempted
Almora
10 Jan 2022
6 Dec 2021
22 Dec 2021
6 Dec 2021
20 Dec 2021
6 Dec 2021
13 Dec 2021
Rates for Shifting of 300 mm dia and 8.4 mm thickness MS ERW Rising Main pipe line from Medical College Campus,Almora under Almora water supply scheme
Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately as per Technical Specification Clause 202.By Manual Means Bituminous Courses.
Dismantling of cement concrete pavements by mechanical means using pneumatic tools breaking to pieces not exceeding 0.02 Cum in volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000 m, stacking serviceable and unserviceable materials separately.
Excavation in Pipe lineTrenches Excavation in soil mixed with single bouldres etc. requireing the use of specials T&P, if any, for pipe line trenches including lift up to 1.5M and lead up to 30M with back filling, watering, ramming of excavated earth in the trenches.
Providing of all materials, Carting from site store to site of work, Lowering into trenches with true to alignment, Laying of MS ERW Pipes grade Yst 210, Jointing by electric welding process with proper grade of eletrodes suitable for jointing of water supply pipe lines (Ador, L&T or equivalent electrodes) by cutting of pipes and making required bends by welding, completion of work with testing of pipe line etc complete.
Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Nominal mix 1:2:4 (Hand mixed).
Supply and fixing of non return valve 300 mm dia double flanges Kirlosker/ WJ make or equivalent ISI marked including cartage of material etc complete for complition of work.
Making TEE 300 mm x 200 mm with end flange of 200 mm etc complete for proper complition of work including cartage of material etc complete for proper complition of work.
Stone masonary work in Coursed Rubble masonry for crossing of pipe line across the nala In 1:4 cement mortar.
Dismantling of existing MSERW pipe of 300 mm dia 8.4 mm thick with electric welding and carting to pumping station by truck at matela or as directed including excavation etc work for removing of pipe line etc complete.
SSCC CONSTRUCTIONS PRIVATE LIMITED
Shivraj Banola
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .