| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.8 LAccepted-AOC BHIKYASEN ALMORA | ₹29.8 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹32.9 L+₹3.0 L (10.2%)Rejected-Finance PARVATI COLONEY BITHORIA I BISHTDHARA HALDWANI NAINITAL | ₹32.9 L+₹3.0 L (10.2%) | L2 | Rejected-Finance Reject |
| 3 | L3₹32.9 L+₹3.1 L (10.3%)Rejected-Finance NARSINGH MALLA NEAR FCI GODAM KAMALUAGANJA ROAD HALDWANI NAINITAL | NAINITAL | UTTARAKHAND | 244713 | ₹32.9 L+₹3.1 L (10.3%) | L3 | Rejected-Finance reject |
Tender Value
₹30.3 L
EMD Value
₹75,000
Closing Date
29 Aug 2022, 3:00 pmClosed
Superintending Engineer
Superintending Engineer Electricity Distribution Circle Ranikhet
Annual Maintanance work of 33/11 KV Sub-station Masi under EDD Bhikiyasain
2022_UPCL9_47736_1
EDD(R)-14/2022-23
Open Tender
Repair and Maintenance Services
Item Wise
365 days
Bhikiyasain
As per tender document
2 documents required · 2 mandatory
₹2,360
Executive Engineer
₹75,000
23 Sept 2023
8 Aug 2022
30 Aug 2022
8 Aug 2022
29 Aug 2022
8 Aug 2022
Amount
Maintenance and preventive maintenance of 33/11 KV S/s, 33 KV, 11KV, LT/HT line and ditribution T/f's Replacement of damaged/rotten or erection of midspan poles (HT/LT) including cartage from S/s Masi/ESC Masi, Replacement of IDF/Mechanical meters 50 per month as per JE/SDO instructions. (18 Km 33KV, 265 Km 11KV, 660 Km LT line and 175 Nos. distribution T/f's including timely release of new service connections & disconnection work as per JE/SDO instructions and consumers complaints handling as per UERC supply code 2020 (NOTE-Amount calculated on per day basis will be deducted from total amount for the month if any one or more Skilled/Unskilled persons made available for work/duty, found absent as per JE/SDO Report). (09 Nos. Skilled/Unskilled Lineman)
Description of Work / Item(s)
Amount
Replacement of damaged/rotten or erection of midspan poles (HT/LT) including cartage from S/s Masi/ESC Masi (NOTE- Amount per pole will be paid as per this rate but amount equal to double the cost of replacement of pole will be deducted from the bill of the month in which complaint of such damaged/rotton pole, recieved)
Meter reading and billing with bill distribution at consumer's home as per schedule monthly/bimonthly basis including SBM & accessories-cartage etc.
R&R of damaged transformer 5% of 175 = 9. Excess damaged transformers will be replaced free of cost by the contractor.
L and T Electrical and Works
G R ENTERPRISES
L and T Electrical and Works
G R ENTERPRISES
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .