Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.3 LAccepted-AOC | ₹6.3 L | L1 | Accepted-AOC L1 |
| 2 | L2₹6.5 LRejected-AOC | ₹6.5 L | L2 | Rejected-AOC L2 |
| 3 | L3₹6.5 LRejected-AOC | ₹6.5 L | L3 | Rejected-AOC L3 |
| 4 | L4₹6.8 LRejected-AOC | ₹6.8 L | L4 | Rejected-AOC L4 |
| 5 | L5₹7.0 LRejected-AOC 0 0 PIPRAICH GORAKHPUR GORAKHPUR UTTAR PRADESH 273152 | GORAKHPUR | UTTAR PRADESH | 273152 | ₹7.0 L | L5 | Rejected-AOC L5 |
| Sl No | Description | Qty | Unit | YASH CONSTRUCTION COMPANY L5 | M/S VIJAY GOYAL CONTRACTOR L2 | M/s JAI BHAWANI ENTERPRISES L6 | M/S ROHIT RANJAN L1 | M/s Kanak Enterprises L4 | M/S Lalit Trading Company L3 |
|---|---|---|---|---|---|---|---|---|---|
| 1.01 | Dismantlingof existingstructures likeculverts, bridges, retainingwallsandother
structurescomprisingofbrickmasonry, includingdisposalofunserviceablematerial
and stacking the serviceablematerial with all lift and lead of 1000mas per
Technical Specification Clause 202. | 116.24 | cum | 90 ₹10,461.60 | 150 ₹17,436 | 392 ₹45,566.08 | 336.2 ₹39,079.89 | 365.02 ₹42,429.92 | 348.18 ₹40,472.44 |
| 1.02 | Concrete with cement, coarse sand and 40 mm gauge stone ballast in proportion 1:4:8 in foundations and floors including supply of all material,labour and T&P etc. required for proper completion of the work. as per drawings and technical specifications Clause 802, 803, 1202 & 1203. SOR - 2-2 | 77.5 | cum | 2,300 ₹1.8 L | 2,835 ₹2.2 L | 3,734 ₹2.9 L | 3,199.74 ₹2.5 L | 3,474.08 ₹2.7 L | 3,313.82 ₹2.6 L |
| 1.03 | Brick masonry work in cement mortar in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 600, 1202 & 1203 Brick masonry in 1:4 cement mortar. SOR - 11-5-2 | 11.43 | cum | 3,200 ₹36,576 | 3,000 ₹34,290 | 4,652 ₹53,172.36 | 3,484.75 ₹39,830.69 | 3,783.53 ₹43,245.75 | 3,609 ₹41,250.87 |
| 1.04 | Plastering with cement mortar (1:4),15 mm thick on brickwork in substructure asper technical specification Clauses 613.4 & 1204. SOR - 12-3 | 65.32 | Sqm | 90 ₹5,878.80 | 135 ₹8,818.20 | 150 ₹9,798 | 123.51 ₹8,067.67 | 134.1 ₹8,759.41 | 127.91 ₹8,355.08 |
| 1.05 | Interlocking Concrete Block Pavement Providing and Laying of Interlocking Concrete Block (M-35) Pavements having thickness 80 mm as per drawings and Technical Specification Clause 1504. Sqm | 664.14 | Sqm | 670 ₹4.4 L | 511 ₹3.4 L | 465 ₹3.1 L | 398.39 ₹2.6 L | 432.55 ₹2.9 L | 412.6 ₹2.7 L |
| 1.06 | Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 (For height upto 5 m) P.C.C. grade M 20
12-5-2-2 Nominal mix (1:2:4) | 6.18 | cum | 3,500 ₹21,630 | 3,500 ₹21,630 | 4,500 ₹27,810 | 3,844.46 ₹23,758.76 | 4,174.08 ₹25,795.81 | 3,981.53 ₹24,605.86 |
| 1.07 | S/F of stone all cost complete work. | 1 | No. | 2,500 ₹2,500 | 4,000 ₹4,000 | 5,000 ₹5,000 | 2,945 ₹2,945 | 3,197.5 ₹3,197.50 | 3,050 ₹3,050 |
Tender Value
₹12.5 L
EMD Value
₹37,620
Closing Date
6 Feb 2026, 5:00 pmClosed
Municipal Commissioner NNR
nagar nigam roorkee
Construction of road and drain from Hydel Office towards SD College in Ward No. 32
2026_MCNNR_91312_2
776/NNR/2025-26
Open Tender
Civil Works
90 days
Nagar nigam roorkee
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,770
Municipal Commissioner Nagar Nigam
₹37,620
2 Apr 2026
27 Jan 2026
7 Feb 2026
27 Jan 2026
6 Feb 2026
28 Jan 2026
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.60 MB
termcondition35.pdf
Tender Documents • 2.97 MB
BOQ_108164.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid