Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance GRAM WA POST HANSKOTI VIKASKHAND NARAYANBAGAR JILA CHAMOLI | NARAYANBAGAR | CHAMOLI | UTTARAKHAND | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance GRAM BHANGOTA NARAYANBAGAD DISTRICT CHAMOLI | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹34.8 L
EMD Value
₹75,000
Closing Date
9 Dec 2022, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
EE JAL SANSTHAN KARANPRAYAG
Supply, Laying and Jointing of G.I. Pipe line (m), and other appurtenant works of Phase II Niwadi Water supply scheme in block Karanprayag of District chamoli under Jal jeewan mission FY 2022-23
2022_UKJS_52062_5
2598/e-tender notice/2022-23 date 22-11-2022
Open Tender
Civil Works - Water Works
Item Wise
120 days
Karanprayag
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
Yes
Executive Engineer UJS
₹75,000
Yes
Karanprayag
12 Dec 2022
26 Nov 2022
12 Dec 2022
26 Nov 2022
9 Dec 2022
28 Nov 2022
28 Nov 2022
Supply, Laying & Jointing of G.I. Pipe line (m), and other appurtenant works of Phase II Niwari Water supply scheme in block Karanprayag of District chamoli under Jal jeewan mission FY 2022-23. All rates shall be included all types of taxes and G.S.T.
Construction of Boulder filled gallery including Supply of all material labour T&P etc required for proper completion of work as per type design and drawing completion of work as per type design and dwawing complete BFG with 6 m width
Supply of all materials, labour, T&P and construction of stone masnary SCC cum Roughenig filter as per type design and drawing
Supply of all materials, labour, T&P and construction of semi cercular drain as per Type design and drawing
Providing of all materials, carting from site store to site of work, laying & jointing of G.I. Medium screwed pipes (including supply of all jointing materials like specials, white lead, hemp and oil etc.) in trenches with its cutting, threading and testing of pipe line etc complete. (GI medium quality (As per marked G.I. Pipe conforming to is 1239)) 20mm dia
25 mm dia
Excavation of earth for pipe line in following strata lift upto 1.5m. Lead upto 30m. Including refilling,watering,ramming of excavated earth into the trenches and removal of surplus earth upto (a) Soil mixed with boulder and bajri
Medium rock/soft rock
Supply and fixing of the following fitting including cartage of material,labours T&P etc complete Gate valves (class-1) as per I S 788/1997 20 mm dia
25mm dia
Supply of all material labours T&P etc. and construct Wheel valve chamber as per type design complete
Supply of all materials, labour, T&P etc and construction of R.C.C. CWR of following capacities (KL) with M.S. ladder outside & inside of the tank, M.S.M.H. cover with locking arrangement, supply and fixing of chlorinator, cowl,outlet, over flow and wash out pipes with necessary sluice valves, pipe pieces (including cost of materials) flooring 0.60 M wide apron, painting with approved water proofing (apex) / enamal paint, testing, filling water for testing purpose etc. including supply of vertical pipes and specials, assuming bearing capacity as 8MT/M2 . 5.00 KL
Supply and fixing of Bucket type chlorinator of 25 litre capacity at top of service reservir
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering -All work upto plinth level 1:4:8 (1 Cement :4 coarse sand: 8 graded stone aggregate 40 mm nominal size)
RR Stone Masonary with 1;6 cement and sand mortar nearby sources and along the pipe line for proper completion of work
RR Stone Masonary laid in dry for proper completion of work along the pipe line
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering -All work upto plinth level 1:2:4 (1 Cement :4 coarse sand: 8 graded stone
Cartage of Material for pipe
Cartage of Material for cwr cement
Cartage of Material for cwr sand
Cartage of Material for cwr stone balast
Cartage of Material for cwr steel
RAJENDRA PRASAD BARMOLA
Puran Singh Negi
MAHESHA NAND CHAMDOL
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .