Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAdmitted-Finance | ₹1.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.6 Cr+₹1.4 Cr (119.3%)Admitted-Finance PLOT NO 4B SURVEY NO 237 3P INDUSTRIAL PARK VAKALAPUDI KAKINADA EAST GODAVARI ANDHRA PRADESH 533005 | KAKINADA | ANDHRA PRADESH | 533005 | ₹2.6 Cr+₹1.4 Cr (119.3%) | L2 | Admitted-Finance |
| 3 | L3₹3.0 Cr+₹1.8 Cr (149.1%)Admitted-Finance NO 12 HARIKRISHNAPURAM SAWYERPURAM TUTICORIN THOOTHUKUDI TAMIL NADU 628251 | TUTICORIN | TAMIL NADU | 628251 | ₹3.0 Cr+₹1.8 Cr (149.1%) | L3 | Admitted-Finance |
| 4 | L4₹3.4 Cr+₹2.2 Cr (185.5%)Admitted-Finance NO 5 1ST FLOOR CITY PLAZA DABA GARDEN DABA GARDEN VISAKHAPATNAM ANDHRA PRADESH 530020 | VISAKHAPATANAM | ANDHRA PRADESH | 530020 | ₹3.4 Cr+₹2.2 Cr (185.5%) | L4 | Admitted-Finance |
| 5 | L5₹3.6 Cr+₹2.4 Cr (205.1%)Admitted-Finance | ₹3.6 Cr+₹2.4 Cr (205.1%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | VOYAGER MARINE SERVICES INDIA PRIVATE LIMITED L3 | SIRICON ENGINEERS AND CONTRACTORS L6 | avisan engineering enterprises L1 | KALATHIL BROTHERS CONSTRUCTION CO. PVT. LTD. L7 | SYAMALA ENTERPRISES L5 | Patel Engineering Works Vizag L4 | SRISAI OILFIELD EQUIPMENTS AND MARINE SERVICES PVT LTD L2 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00TOP SIDE AREA | ||||||||||
| 1.10 | To Carry out grit blasting standard of SA 2.5 to prepare for Top Side Area for Hull survey. | 1,000 | Sqmtr | 1,075 ₹10,75,000 | 900 ₹9,00,000 Lowest | - | 4,000 ₹40,00,000 | 1,450 ₹14,50,000 | 1,100 ₹11,00,000 | 910 ₹9,10,000 |
| 1.20 | To Carry out grit blasting standard of SA 1.0 to prepare for Top Side Area for Hull survey. | 500 | Sqmtr | 960 ₹4,80,000 | 600 ₹3,00,000 Lowest | - | 3,800 ₹19,00,000 | 1,150 ₹5,75,000 | 660 ₹3,30,000 | 655.2 ₹3,27,600 |
| 1.30 | To Carry out Copper Slag blasting standard of SA 2.5 to prepare for Top Side Area for Hull survey. | 1,000 | Sqmtr | 685 ₹6,85,000 | 850 ₹8,50,000 | 750 ₹7,50,000 | 2,000 ₹20,00,000 | 950 ₹9,50,000 | 880 ₹8,80,000 | 650 ₹6,50,000 Lowest |
| 1.40 | To Carry out Copper Slag sweep blasting standard of SA 1.0 to prepare for Top Side Area for Hull survey. | 500 | Sqmtr | 595 ₹2,97,500 | 550 ₹2,75,000 | 750 ₹3,75,000 | 1,800 ₹9,00,000 | 800 ₹4,00,000 | 528 ₹2,64,000 | 468 ₹2,34,000 Lowest |
| 1.50 | Apply one coat of primer immediately after blasting (Contractor has to quote one Coat of Primer) | 1,500 | Sqmtr | 35 ₹52,500 | 177 ₹2,65,500 | 50 ₹75,000 | 200 ₹3,00,000 | 45 ₹67,500 | 30 ₹45,000 Lowest | 35 ₹52,500 |
| 1.60 | Apply Full Coat Paint Scheme (Contractor has to quote per Coat of Paint Scheme). | 1,500 | Sqmtr | 45 ₹67,500 Lowest | 776 ₹11,64,000 | 50 ₹75,000 | 200 ₹3,00,000 | 45 ₹67,500 Lowest | 60 ₹90,000 | 135 ₹2,02,500 |
| 1.70Paint Scheme: 2x125 Mic. DFT EPOXY PRIME; 1x 100 Mic DFT FULL COAT PURE EPOXY MASTIC TOP SIDE FINISH BLACK; | ||||||||||
| 2.00VERTICAL BOTTOM AREA | ||||||||||
| 2.10 | To Carry out grit blasting standard of SA 2.5 to prepare for Vertical Bottom Area for Hull survey. | 2,000 | Sqmtr | 1,075 ₹21,50,000 | 900 ₹18,00,000 Lowest | - | 4,000 ₹80,00,000 | 1,450 ₹29,00,000 | 1,320 ₹26,40,000 | 910 ₹18,20,000 |
Tender Value
Refer Docs
EMD Value
₹1 L
Closing Date
19 Feb 2021, 11:00 amClosed
DGM (SRC-Com)
SR Complex Hindustan Shipyard Limited Gandhigram Visakhapatnam 530 005
Blasting and Painting works on SCI SWARNA SERIES VESSELS
2021_HSL_84909_1
20 / SCI SWARNA SERIES VESSELS / 086 / 2020-21
Open Tender
Miscellaneous Services
Service
22 days
HSL Visakhapatnam
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,180
Yes
Hindustan Shipyard Limited
₹1 L
Yes
SRC-Hindustan Shipyard limited, Visakhapatnam
31 May 2021
30 Jan 2021
19 Feb 2021
30 Jan 2021
19 Feb 2021
5 Feb 2021
30 Jan 2021 - 4 Feb 2021
4 Feb 2021
Amount
TOP SIDE AREA
To Carry out grit blasting standard of SA 2.5 to prepare for Top Side Area for Hull survey.
To Carry out grit blasting standard of SA 1.0 to prepare for Top Side Area for Hull survey.
To Carry out Copper Slag blasting standard of SA 2.5 to prepare for Top Side Area for Hull survey.
To Carry out Copper Slag sweep blasting standard of SA 1.0 to prepare for Top Side Area for Hull survey.
Apply one coat of primer immediately after blasting (Contractor has to quote one Coat of Primer)
Apply Full Coat Paint Scheme (Contractor has to quote per Coat of Paint Scheme).
Paint Scheme: 2x125 Mic. DFT EPOXY PRIME; 1x 100 Mic DFT FULL COAT PURE EPOXY MASTIC TOP SIDE FINISH BLACK;
VERTICAL BOTTOM AREA
To Carry out grit blasting standard of SA 2.5 to prepare for Vertical Bottom Area for Hull survey.
To Carry out grit blasting standard of SA 1.0 to prepare for Vertical Bottom Area for Hull survey.
To Carry out Copper Slag blasting standard of SA 2.5 to prepare for Vertical Bottom Area for Hull survey.
To Carry out Copper Slag Sweep blasting standard of SA 1.0 to prepare for Vertical Bottom Area for Hull survey.
Apply one coat of primer immediately after blasting (Contractor has to quote one Coat of Primer)
Apply Full Coat Paint Scheme (Contractor has to quote per Coat of Paint Scheme).
Paint Scheme: 2 X 125 100 Mic DFT PURE EPOXY PRIMER; 1 X 125 2ND COAT 100 Mic DFT EPOXY TIE COAT; 2 FULL COAT TBT FREE SPC ANTIFOULING A/F - 150 Mic DFT;
FLAT BOTTOM AREA
To Carry out grit blasting standard of SA 2.5 to prepare for Flat Bottom Area for Hull survey.
To Carry out grit blasting standard of SA 1.0 to prepare for Flat Bottom Area for Hull survey.
To Carry out Copper Slag blasting standard of SA 2.5 to prepare for Flat Bottom Area for Hull survey.
To Carry out Copper Slag sweep blasting standard of SA 1.0 to prepare for Flat Bottom Area for Hull survey.
Apply one coat of primer immediately after blasting (Contractor has to quote one Coat of Primer)
Apply Full Coat Paint Scheme (Contractor has to quote per Coat of Paint Scheme).
Paint Scheme: 2 X 125 100 Mic DFT PURE EPOXY PRIMER; 1 X 125 2ND COAT 100 Mic DFT EPOXY TIE COAT; 2 FULL COAT TBT FREE SPC ANTIFOULING A/F - 150 Mic DFT;
GRIT BLASTING AND PAINTING OF MAIN DECKS (INCLUDING LONGITUDINALS, TRANVERSES, PIPE SUPPORTS, STRUCTURES, ETC.ON DECK)
To Carry out grit blasting standard of SA 2.5 to prepare for Main Decks for survey (INCLUDING LONGITUDINALS, TRANVERSES, PIPE SUPPORTS, STRUCTURES, ETC.ON DECK).
To Carry out grit blasting standard of SA 1.0 to prepare for Main Decks for survey (INCLUDING LONGITUDINALS, TRANVERSES, PIPE SUPPORTS, STRUCTURES, ETC.ON DECK).
To Carry out Copper Slag blasting standard of SA 2.5 to prepare for Main Decks for survey (INCLUDING LONGITUDINALS, TRANVERSES, PIPE SUPPORTS, STRUCTURES, ETC.ON DECK).
To Carry out Copper Slag sweep blasting standard of SA 1.0 to prepare for Main Decks for survey (INCLUDING LONGITUDINALS, TRANVERSES, PIPE SUPPORTS, STRUCTURES, ETC.ON DECK).
Apply one coat of primer immediately after blasting (Contractor has to quote one Coat of Primer)
Apply Full Coat Paint Scheme (Contractor has to quote per Coat of Paint Scheme).
Paint Scheme: 1ST COAT EPOXY PRIMER 75 m DFT; 2ND COAT EPOXY GREEN 100 m DFT; 3RD COAT FULL COAT POLYURETHANE DECK GREEN 75 m DFT;
ACCOMODATION SUPERSTRUCTURE(SUPERSTRUCTURE//UNDER DECK AREAS / FUNNEL )
To Carry out grit blasting standard of SA 2.5 to prepare for Main Decks for survey (SUPERSTRUCTURE//UNDER DECK AREAS / FUNNEL ).
To Carry out grit blasting standard of SA 1.0 to prepare for Main Decks for survey (SUPERSTRUCTURE//UNDER DECK AREAS / FUNNEL ).
To Carry out Copper Slag blasting standard of SA 2.5 to prepare for Main Decks for survey (SUPERSTRUCTURE//UNDER DECK AREAS / FUNNEL ).
To Carry out Copper Slag sweep blasting standard of SA 1.0 to prepare for Main Decks for survey (SUPERSTRUCTURE//UNDER DECK AREAS / FUNNEL ).
Apply one coat of primer immediately after blasting (Contractor has to quote one Coat of Primer)
Apply Full Coat Paint Scheme (Contractor has to quote per Coat of Paint Scheme).
Paint Scheme: 1 COAT OF EPOXY PRIMER 75 DFT; 1 COAT OF EPOXY PRIMER 75 DFT; 1 COAT OF TOUCH UP POLYURETHANE FINISH WHITE 75 m DFT;
DECK PIPE LINES SURFACE PREPARATION AND PAINTING
ALL PIPE LINES ON MAIN DECK PRICE INCLUDING MAIN CARGO; CRUDE OIL WASHING; INERT GAS; FIRE, FOAM, HO; DO; CABLE DUCT; AIR LINE, HYDRAULIC LINE, FRESH WATER LINE, CABLE TRAY ETC. RUSTED AREAS ARE TO BE GRIT BLASTED TO SA 2.0 STD. AND CLEANED.
ALL PIPE LINES ON MAIN DECK PRICE INCLUDING MAIN CARGO; CRUDE OIL WASHING; INERT GAS; FIRE, FOAM, HO; DO; CABLE DUCT; AIR LINE, HYDRAULIC LINE, FRESH WATER LINE, CABLE TRAY ETC. RUSTED AREAS ARE TO BE COPPER SLAG HARD SWEEP BLASTED TO SA 2.0 STD. AND CLEANED.
Apply one coat of primer immediately after blasting (Contractor has to quote one Coat of Primer)
Apply Full Coat Paint Scheme (Contractor has to quote per Coat of Paint Scheme).
Paint Scheme: 2 COATS OF EPOXY PRIMER 75 µ; ONE FULL COAT OF POLYURETHANE FINISH PAINT (GREEN) 100 µ DFT TO BE APPLIED ON COMPLETE PIPE LINES AND SUPPORTS ETC.
SRISAI OILFIELD EQUIPMENTS AND MARINE SERVICES PVT LTD
VOYAGER MARINE SERVICES INDIA PRIVATE LIMITED
Patel Engineering Works Vizag
SYAMALA ENTERPRISES
SIRICON ENGINEERS AND CONTRACTORS
KALATHIL BROTHERS CONSTRUCTION CO. PVT. LTD.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .