Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹326.3 CrAccepted-AOC CRYSTAL TOWER 4TH FLOOR TELIBANDHA RAIPUR | RAIPUR | RAIPUR | CHHATTISGARH | L1 | Accepted-AOC 1ST LOWEST | |
| 2 | L2₹326.3 Cr+₹3.5 L (0.01%)Rejected-AOC 1148 E SYKES EXTENSION KOLHAPUR 416001 | KOLHAPUR | KOLHAPUR | MAHARASHTRA | 416001 | L2 | Rejected-AOC L2 | |
| 3 | L2₹326.3 Cr+₹3.5 L (0.01%)Rejected-AOC AHEMDABAD B WING 15TH FLOOR PRIVILON BUILDING VIKRAM NAGAR AMBALI BOPAL ROAD BEHIND ISCONTAMPLE AHEMDABAD 380058 GUJRAT INDIA | AHMADABAD | GUJARAT | 380058 | L2 | Rejected-AOC L2 | |
| 4 | L3₹326.6 Cr+₹37.6 L (0.12%)Rejected-AOC 12 106 LAXMINAGAR GOPALAPATNAM GOPALAPATNAM VISAKHAPATNAM ANDHRA PRADESH 530027 | VISAKHAPATANAM | ANDHRA PRADESH | 530027 | L3 | Rejected-AOC L3 | |
| 5 | L4₹414.7 Cr+₹88.5 Cr (27.1%)Rejected-AOC BLOCK NO 758 EAGLE NEST BEHIND CHOPRA COURT ULHASNAGAR 421003 DIST THANE | 421003 | L4 | Rejected-AOC L4 |
| Sl No | Description | Qty | Unit | MEGHA ENGINEERING AND INFRASTRUCTURES LIMITED L3 | Laxmi Civil Engineering Services Pvt Ltd L2 | LARSEN AND TOUBRO LIMITED L1 | EAGLE INFRA INDIA LTD L4 | LCC Projects Limited L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Execution of canal distribution network including Command Area Development (CAD) works up to 1 hectare chak for Salandi Left Main Canal from RD 45.570 km to 49.810 km of Anandapur Barrage Project through Under Ground Pipe Line System (Gravity Flow) for CCA of 12155.80 Ha on "EPC - Turn Key" basis to provide irrigation facility including Survey, investigation, planning, Designing, procurement of all material etc complete as per the relevant clauses of Technical Bid Document, guidelines of CWC, Govt. of India and IS standards. | 1 | Nos | 2,73,95,73,798 ₹2,73,95,73,798 Lowest | 3,01,33,31,400 ₹3,01,33,31,400 | 3,00,41,95,909 ₹3,00,41,95,909 | 3,58,53,24,900.52 ₹3,58,53,24,900.52 | 3,04,52,09,043.31 ₹3,04,52,09,043.31 |
| 2.00 | Execution of Micro Irrigation System for 1216 Ha beyond the CCA of 12155.80 Ha of Salandi Left Main Canal from RD 45.570 km to 49.810 km of Anandapur Barrage Project through Under Ground Pipe Line System on "EPC - Turn Key" basis to provide irrigation facility including Survey, investigation, planning, Designing, procurement of all material etc complete as per the relevant clauses of Technical Bid Document and guidelines of CWC, Govt. of Indiaand IS standards. | 1 | Nos | 37,11,59,691 ₹37,11,59,691 | 9,12,00,000 ₹9,12,00,000 | 10,00,00,000 ₹10,00,00,000 | 35,86,56,368.87 ₹35,86,56,368.87 | 6,08,00,000 ₹6,08,00,000 Lowest |
| 3.00 | Operation & Maintenance for Distribution Network including CAD works for 12155.80 Ha CCA of Salandi Left Main Canal from RD 45.570 km to 49.810 km of Anandapur Barrage Project through Under Ground Pipe Line System on "EPC - Turn Key" basis to provide successful irrigation for five years or five Khariff / five Rabi crop season whichever is later after commissioning of UGPL irrigation system as per the relevant clauses of Technical Bid Document and guidelines of CWC, Govt.of India. | 1 | Nos | 13,69,78,690 ₹13,69,78,690 Lowest | 15,36,79,900 ₹15,36,79,900 | 15,32,13,991 ₹15,32,13,991 | 18,46,44,232.27 ₹18,46,44,232.27 | 15,37,83,056.69 ₹15,37,83,056.69 |
| 4.00 | Operation & Maintenance for micro irrigation system network for 1216 Ha beyond the CCA of 12155.80 Ha of Salandi Left Main Canal from RD 45.570 km to 49.810 km of Anandapur Barrage Project through Under Ground Pipe Line System on "EPC - Turn Key" basis to provide successful irrigation for five years or five Khariff / five Rabi crop season whichever is later after commissioning of UGPL irrigation system as per the relevant clauses of Technical Bid Document and guidelines of CWC, Govt. of India. | 1 | Nos | 1,85,57,985 ₹1,85,57,985 | 46,51,200 ₹46,51,200 | 51,00,000 ₹51,00,000 | 1,84,70,802.95 ₹1,84,70,802.95 | 30,70,400 ₹30,70,400 Lowest |
Tender Value
Refer Docs
EMD Value
₹3.6 Cr
Closing Date
22 May 2025, 5:00 pmClosed
CCE,ABP,SALAPADA
CCE,ABP,SALAPADA
Construction of Distribution system for 12155.80 Ha. of CCA including Command Area Development (CAD) of Salandi Left Main Canal from RD 45.570 km to 49.810 km through Under Ground Pipe Line Irrigation system (Gravity Flow) of Anandapur Barrage Projec
2025_CCEAB_112676_1
CCEABP-02 OF 2025-26
National Competitive Bid
Civil Works - Others
Turn-key
810 days
Salapada
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹3.6 Cr
Yes
CCE,ABP,SALAPADA
12 Feb 2026
22 Apr 2025
23 May 2025
22 Apr 2025
22 May 2025
22 Apr 2025
22 Apr 2025 - 3 May 2025
6 May 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Execution of canal distribution network including Command Area Development (CAD) works up to 1 hectare chak for Salandi Left Main Canal from RD 45.570 km to 49.810 km of Anandapur Barrage Project through Under Ground Pipe Line System (Gravity Flow) for CCA of 12155.80 Ha on "EPC - Turn Key" basis to provide irrigation facility including Survey, investigation, planning, Designing, procurement of all material etc complete as per the relevant clauses of Technical Bid Document, guidelines of CWC, Govt. of India and IS standards. | - | Nos | 1 | - |
| 2 | Execution of Micro Irrigation System for 1216 Ha beyond the CCA of 12155.80 Ha of Salandi Left Main Canal from RD 45.570 km to 49.810 km of Anandapur Barrage Project through Under Ground Pipe Line System on "EPC - Turn Key" basis to provide irrigation facility including Survey, investigation, planning, Designing, procurement of all material etc complete as per the relevant clauses of Technical Bid Document and guidelines of CWC, Govt. of Indiaand IS standards. | - | Nos | 1 | - |
| 3 | Operation & Maintenance for Distribution Network including CAD works for 12155.80 Ha CCA of Salandi Left Main Canal from RD 45.570 km to 49.810 km of Anandapur Barrage Project through Under Ground Pipe Line System on "EPC - Turn Key" basis to provide successful irrigation for five years or five Khariff / five Rabi crop season whichever is later after commissioning of UGPL irrigation system as per the relevant clauses of Technical Bid Document and guidelines of CWC, Govt.of India. | - | Nos | 1 | - |
| 4 | Operation & Maintenance for micro irrigation system network for 1216 Ha beyond the CCA of 12155.80 Ha of Salandi Left Main Canal from RD 45.570 km to 49.810 km of Anandapur Barrage Project through Under Ground Pipe Line System on "EPC - Turn Key" basis to provide successful irrigation for five years or five Khariff / five Rabi crop season whichever is later after commissioning of UGPL irrigation system as per the relevant clauses of Technical Bid Document and guidelines of CWC, Govt. of India. | - | Nos | 1 | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
168829048.xls
BOQ Document • 0.26 MB
168711061.html
Tender Document • 0.05 MB
168829049.pdf
Tender Document • 0.61 MB
DTCN.pdf
Tender Document • 8.14 MB
map.pdf
Tender Document • 3.22 MB
170815948.pdf
Tender Document • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .