Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹73.8 LAdmitted-Finance VILLAGE SARKANDA P O GONA TEHRI GARHWAL | TEHRI GARHWAL | UTTARAKHAND | 248008 | ₹73.8 L | L1 | Admitted-Finance |
| 2 | L2₹74.3 LAdmitted-Finance TEHRI G | DEHRADUN | UTTARAKHAND | 248008 | ₹74.3 L | L2 | Admitted-Finance |
| 3 | L3₹77.6 LAdmitted-Finance | ₹77.6 L | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | DHARAM SINGH KATHAIT L1 | Semwal Electrical Engineering Company L3 | Sunil Joshi Electrical Contractor L2 |
|---|---|---|---|---|---|---|
| 1.00Electrical Items : | ||||||
| 2.00 | Holding Clamp J-I hook for AB cable | 320 | NOS | 81,280 ₹81,280 | 96,000 ₹96,000 | 84,800 ₹84,800 |
| 3.00 | STAY CLAMP FOR SP-21 WITH NUT & BOLT | 5 | NOS | 1,245 ₹1,245 | 1,500 ₹1,500 | 1,325 ₹1,325 |
| 4.00 | STAY CLAMP FOR SP-23 WITH NUT & BOLT | 50 | NOS | 12,450 ₹12,450 | 13,750 ₹13,750 | 13,250 ₹13,250 |
| 5.00 | STAY CLAMP FOR SP-10 WITH NUT & BOLT | 40 | NOS | 10,000 ₹10,000 | 11,000 ₹11,000 | 10,600 ₹10,600 |
| 6.00 | EARTH WIRE CLAMP FOR SP-23 WITH
N/B | 49 | NOS | 12,250 ₹12,250 | 13,475 ₹13,475 | 12,985 ₹12,985 |
| 7.00 | DEAD END CLAMPS WITH I HOOK AND N/B INS | 195 | NOS | 87,750 ₹87,750 | 87,750 ₹87,750 | 88,725 ₹88,725 |
| 8.00 | PP & CLAMP WITH N&B ST POLE SP-23 | 68 | NOS | 27,200 ₹27,200 | 27,200 ₹27,200 | 28,560 ₹28,560 |
| 9.00 | Susp. Clamp With I Hook (Ins.),Clamp,N&B | 320 | NOS | 1,44,000 ₹1.4 L | 1,44,000 ₹1.4 L | 1,45,600 ₹1.5 L |
| 10.00 | BRACING CLAMP TOP FOR SP-23 WITH
N/B | 20 | NOS | 7,000 ₹7,000 | 7,000 ₹7,000 | 7,100 ₹7,100 |
Tender Value
Refer Docs
EMD Value
₹1.5 L
Closing Date
21 Jan 2026, 2:00 pmClosed
SE
EDC TEHRI
Increasing capacity of different DTRs (16KVA to 25KVA and 25KVA to 63KVA) and line strengthening work of 11 KV and LT line in different villages of Chamiyala Section under Electricity Distribution Division Tehri
2026_UPCL4_90734_1
59/EDCT/2025-26
Open Tender
Miscellaneous Services
90 days
Chamiyala
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,900
Yes
EE TEST
₹1.5 L
Yes
18 Feb 2026
7 Jan 2026
22 Jan 2026
7 Jan 2026
21 Jan 2026
7 Jan 2026
Holding Clamp J-I hook for AB cable
STAY CLAMP FOR SP-21 WITH NUT & BOLT
STAY CLAMP FOR SP-23 WITH NUT & BOLT
STAY CLAMP FOR SP-10 WITH NUT & BOLT
EARTH WIRE CLAMP FOR SP-23 WITH N/B
DEAD END CLAMPS WITH I HOOK AND N/B INS
PP & CLAMP WITH N&B ST POLE SP-23
Susp. Clamp With I Hook (Ins.),Clamp,N&B
BRACING CLAMP TOP FOR SP-23 WITH N/B
BRACING CLAMP BOTTOM FOR SP-23 WITH N/B
Connecting Cable AB Cable to DB 1x25sqmm
Head shrink type end caps for LT ABC
Piercing Connector 70 Sq.mm-70Sq.mm
Piercing Connector 35 Sq.mm-35Sq.mm
INSULATED PIERCING CONNECTOR 50-50 SQ.MM
LT XLPE Cable 1x35 sqmm
LT XLPE AB CABLE 3X95+1X50 SQ.MM.
LT AB Cable 3x70+1x50 sqmm
LT AB Cable 3x35+1x25 sqmm
LT XLPE AB CABLE 1CX16+25 SQ.MM.
LT AB CABLE 3CX50+1X35 SQ.MM
LT DISTRIBUTION BOX 1 PHASE
LT DISTRUBITON BOX 3 PHASE
AL CRIMPING TYPE LUGS 25 SQ.mm
LABOUR (SERVICES)
CHEMICAL EARTHING
ERECTION OF EARTHING ROD
FABRICATION OF STEEL
EXCAVATION OF PIT FOR STAY SET
ERECTION OF LT STAY SET
ERECTION OF 11 KV STAY SET
GROUTING OF STAY SET
EXCAVATION OF PIT FOR POLE
ERECTION OF SINGLE SP-10 POLE
ERECTION OF SINGLE SP-21 POLE
ERECTION OF SINGLE SP-23 POLE
ERECTION OF SP-23 DOUBLE POLE
GROUTING OF POLE
MUFFING OF POLE
DISMANTLING OF SP-10 SINGLE POLE
DISMANTLING OF SP-21/SP-23 SINGLE POLE
DISMANTLING OF 11 KV LINE(RABBIT)
DISMANTLING OF LT LINE 1 P 2 W(WEASEL)
DISMANTLING OF LT LINE 3 P 4 W(WEASEL)
DISMANTLING OF 16 KVA DTR
DISMANTLING OF 25 KVA DTR
INST. OF 63 KVA DTR ON POLE STRUCTURE
INST. OF 25 KVA DTR ON POLE STRUCTURE
FIXING OF TPMO
FIXING OF LIGHTNING ARRESTOR
LAYING OF RABBIT CONDUCTOR IN HT LINE
LOPPING & CHOPPINGOF TREE BRANCHES
CARTAGE SP-10 POLE, 151-200KM
CARTAGE SP-21/23 POLE, 151-200KM
CARTAGE OF PETTY MATERIAL,151-200KM
CARTAGE OF 16/25 KVA DTR, 151-200KM
CARTAGE OF 63 KVA DTR, 151-200KM
HEADLOAD CARTAGE SP-10 POLE(0-1 KM)
HEADLOAD CARTAGE SP-10 POLE(1-3 KM)
HEADLOAD CARTAGE SP-21/23 POLE(0-1 KM)
HEADLOAD CARTAGE SP-21/23 POLE(1-3 KM)
HEADLOAD CARTAGE OF MATERIAL(0-1 KM)
HEADLOAD CARTAGE OF MATERIAL(1-3 KM)
HEADLOAD CARTAGE OF 16 KVA DTR(0-1 KM)
HEADLOAD CARTAGE OF 25 KVA DTR(0-1 KM)
HEADLOAD CARTAGE OF 63 KVA DTR(0-1 KM)
DISCONNECTION & RECONNECTION OF CONsumer
LAYING OF LT AB CABLE 3X70+1X50 SQMM
LAYING OF LT AB CABLE 3X35+1X25 SQMM
INSTALLATION OF LT DB 1 PH FOR LT AB
INSTALLATION OF LT DB 3 PH FOR LT AB CAB
LAYING OF AB CABLE 1X16+25 MM
Fixing of heat Shrink Cap for AB Cable
BACK CARTAGE OF PETTY MATERIAL,151-200KM
Laying and fixing of 1x35sqmm XLPE Cable
BACK HEAD LOAD CART. OF PETTY MAT. 0-1KM
BACK HEAD LOAD CART. OF PETTY MAT. 1-3KM
DISMANTLING OF LT XLPE CABLE 1CX16+25
LAYING OF LT AB CABLE 3CX50+1X35
LAYING OF LT XLPE ABC 3X95+1X70+16 SQ.MM
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.41 MB
59PQR.xls
Other Document • 0.03 MB
s.pdf
Tender Documents • 1.44 MB
BOQ_107521.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid