Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 LAccepted-AOC HIMACHAL PRADESH HP | UNA | HIMACHAL PRADESH | 177202 | ₹2.1 L Quoted ₹2.2 L | L1 | Accepted-AOC L1 |
| 2 | L2₹2.2 LRejected-Finance NEAR OLD PWD REST HOUSE KULLU DISTT KULLU HP | KULLU | HIMACHAL PRADESH | 172001 | ₹2.2 L | L2 | Rejected-Finance L2 |
| 3 | L3₹2.3 LRejected-Finance ED HPSEBL THALOUT | MANDI | HIMACHAL PRADESH | 175001 | ₹2.3 L | L3 | Rejected-Finance L3 |
Tender Value
₹2.1 L
EMD Value
₹2,074
Closing Date
12 Mar 2026, 2:00 pmClosed
SR EX EN ED THALOUT
O/O SR EX EN ED THALOUT
Tender for providing LT line extension for electrification of left out houses from various DTRs 25KVA 11/0.4 KV Sub-station Aisha 63 KVA Upper Hawai 50 KVA Shiah2 25KVA Porshudhar and 63KVA Rauli in E Section Garsa UESD HPSEBL Nagwain
2026_HPSEB_129299_1
HPSEBL/TED/NIT-218/2025-26
Open Tender
Supply and Erection
30 days
THALOUT
TENDER COST EMD TECHNO COMMERCIAL QUALIFYING DOCUMENTS
4 documents required · 4 mandatory
₹590
₹2,074
19 Mar 2026
5 Mar 2026
13 Mar 2026
5 Mar 2026
12 Mar 2026
5 Mar 2026
Supply Part of LT Line
Supply of RCC pipe (Muff) ISI marked suitable for different sizes of steel poles. 2000 mm in length and 25 mm thick with 250 mm internal dia duly fabricated by using un-galvanized MS wires of 12 SWG rings and 6 mm MS round in vertical direction conforming to ISI 458-1988 or latest version if any.
Supply of shackle insulator.
Supply of D-Iron (U-Clamps)
Supply of LT stay set (i/c stay clamp)
Supply of Stay Wire (7/3.15 mm) (7.0 Kg per stay set)
Supply of Egg. Insulator
Supply of Nuts & Bolts @25 KG Per Km.
Supply of Aluminium paint.
Erection Part:- LT Line
Erection of steel tubular pole 8.00 & 900 mtr long (Single pole) digging of pit, Erection of pole, Drilling of holes in X-arm, , Fixing of insulator X-arm knee-bracing set top clamp, Fixing of barbed wire danger plate, Concreting of RCC Muff with c:c 1:3:6 (1 cement :3 sand :6 aggregate 20 mm nomial size with curing complete etc.) , Filling of pit+ramming, painting of pole and all steel items (Punching of the poles is stricitly not allowed)
Laying, stringing , sagging & binding with Insulator of AAAC rabbit conductor of size 7/3.15 mm2 (55mm2) & GI wire including jumpering etc. complete.
Erection of Stay Set LT (Digging of pit, fixing of stay rod, filling of pit , nozzeling & tighting)
MANUAL CARRIAGE OF MATERIAL FOR LT LINE CONSIDERING AVERAGE DISTANCE FROM ROAD HEAD TO SITE OF WORK AVERAGE LEAD=0.500 KM
LT Steel Poles 8.00 & 900 mtr. Long and RCC Muff
Manual carriage of LT Line its associate material (accept ST poles) like wise cross arm, bracing set, insulators, stay set, stay wire, Conductor & GI wire.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.62 MB
biddocnit218.pdf
Tender Documents • 1.08 MB
BOQ_191171.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid