Divisional Forest Officer
Divisional Forest Officer Divisional Forest Office Kothamangalam
Final Thinning operations in 1982 Teak Plantation, Ponganthodu, under Veloor Forest Station in Thodupuzha Range
2026_FD_829640_1
KFDDO/28891/2025/DFOKGLM L2
Open Tender
Agricultural or Forestry
Percentage
120 days
Veloor, Thodupuzha
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,500
₹50,000
21 Jan 2026
21 Jan 2026
21 Feb 2026
21 Jan 2026
18 Feb 2026
21 Jan 2026
Clearing the boundary line of the plantation as well as Dumping Depot to a width of 5.2M and Fire tracing cleared boundary of the plantation as well as Dumping Depot by scraping 1.8M on either side and burning centre belt (5 km in plantation and 1 km in dumping depot)
Contractors profit @ 10%
Felling, conversion, classification including dressing drag holding wherever necessary for 1/2 Cum & below for hard wood (teak poles excluded)
Contractors profit @ 10%
Felling, conversion, classification including dressing drag holding wherever necessary for 1/2 Cum & above for hard wood
Contractors profit @ 10%
Cross cutting timber with saw below 125cm in girth
Contractors profit @ 10%
Cross cutting with saw 125cm to 150cm in girth
Contractors profit @ 10%
Cross cutting with saw above 150cm in girth
Contractors profit @ 10%
Providing axe man for felling poles
Contractors profit @ 10%
Conversion and classification of 2nd class teak poles
Contractors profit @ 10%
Conversion and classification of 3rd class teak poles
Contractors profit @ 10%
Conversion and classification of 4th class teak poles
Contractors profit @ 10%
Conversion and classification of 5th class teak poles
Contractors profit @ 10%
Chisel numbering of timber logs, inferior timber logs, teak poles
Contractors profit @ 10%
Surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m. Detailed 3000 m x 3 m = 9000 m2 Rate 21.15/m2 with 41.53% cost index ie 29.93 / m2
Contractors profit @ 10%
Rough stone dry packing for chappaths, gutters & slushy portion of road
Contractors profit @ 10%
Construction of drag path
Contractors profit @ 10%
Haulage of III nd class poles up to an average lead of 400m
Contractors profit @ 10%
Haulage of IV th class poles up to an average lead of 400m
Contractors profit @ 10%
Haulage of V th class poles up to an average lead of 400m
Contractors profit @ 10%
Mechanical Dragging of timber and II nd class poles from stump site for an initial lead of 200m
Contractors profit @ 10%
Mechanical Dragging of timber and II nd class poles from stump site for an additional lead of 200m
Contractors profit @ 10%
Loading timber and poles from plantation staked within 20m radius into the vehicle and tying with ropes
Contractors profit @ 10%
Transport of timber in Lorries to Thalakode Depot ( lead- 3 km coupe road, 7 km Metal Road and 23 Km normal road, Total- 33 km) For first 10 km (Coup road 3 km -39.87 @ 33% enhancement 13.15 (39.87+ 13.15=53.02 +7 km normal rate) ie 53.02+93.03=146.05/-, next 15 km @8.78 = 131.70/- next 8 km @ 7.10=69.68 Total - 146.05+131.70+69.68=347.43/m3/km
Contractors profit @ 10%
Transport of teak poles in lorry to dumping depot at1992 TP (Minimum Lead, 3 km coupe road ) First 4 km 33.33 % enhancement = 70.88 /km/m3
Contractors profit @ 10%
Unloading timber at Govt.Depot and poles at dumping depot
Contractors profit @ 10%
Clearing stacking site including dumping site.
Contractors profit @ 10%
Stacking teak poles at dumping depots
Contractors profit @ 10%
Billeting and stacking at site for teak/hardwood firewood and teak billets excluding felling
Contractors profit @ 10%
Transport of teak billets and teak/hardwood firewood by headload 20m up to 200m
Contractors profit @ 10%
Loading teak firewood and teak billets in lorries
Contractors profit @ 10%
Transport of Teak firewood , billets in lorries to 1992 TP dumping depot (Minimum Lead, 3 km coupe road ) First 3 km 33.33 % enhancement = 70.88/m3
Contractors profit @ 10%
Unloading and stacking of teak firewood , billets and misc. firewood pachilla Dumping Depot
Contractors profit @ 10%
Knife weeding in moderate weed growth area during Aug-Sept- Allowed subjedt to site inspection by CCF
Contractors profit @ 10%
Construction of temporary shed with jungle wood post and thuching with grass to accommodate staff,labours and watchers and keeping implements etc.
Contractors profit @ 10%
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.46 MB
tender1982.pdf
Tender Documents • 0.44 MB
PrelimAgr.pdf
Tender Documents • 0.06 MB
EPAYMENT.pdf
Other Document • 0.01 MB
BOQ_1393326.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .