Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance 502 31 45 15 41 JAYANTHI JACINTH APARTMENT PHASE 2 PRASANTHI NAGAR KURAMANNAPALEM VISAKHAPATNAM ANDHRA PRADESH 530046 UDYAM AP 10 0014243 | VISAKHAPATANAM | ANDHRA PRADESH | 530046 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
Closing Date
8 Nov 2021, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Arnab Dey
GE(P) navy Kalinga
Repair /Maintenance to window/splt air Conditioners, water cooler, refrigerator and connected works at INS Kalinga, INS Karna and NAD Bheemunipatnam
2021_MES_483577_1
GE(P)/N/K/JOB/19 of 2021-22
Limited
Miscellaneous Services
Item Rate
30 days
GE(P) Navy Kalinga
Repair /Maintenance to window/splt air Conditioners, water cooler, refrigerator and connected works at INS Kalinga, INS Karna and NAD Bheemunipatnam
1 document required · 1 mandatory
₹0
Exempted
9 Nov 2021
23 Oct 2021
9 Nov 2021
25 Oct 2021
8 Nov 2021
25 Oct 2021
30 days
Amount
M&L for taking down the defective split type AC unit 1.5 TR capacity, shifting to work shop, taking out the defective unserviceable hermetically sealed compressor from the unit, replacing the compressor with new compressor of the same capacity, fixing to the unit, interconnecting the refrigerating lines, flushing out the cooling coil & condenser, removal the coil & carbon thoroughly, cleaning with CTC, leak testing, pressure testing with Nitrogen gas, dehydrating, vaccumising, charging of oil/refrigerant gas, testing at work shop, shifting to the location for reinstalling the same in its original position, connecting up all electrical connections and testing complete all as specified and as directed by the Engineer-in-Charge.Make: KIRLOSKAR/TECUMESH/EMERSON/BLUE STAR Note: Rate quoted is deemed to be inclusive of cutting, welding, brazing, sealing the refrigerant tubing, replacement of strainer, CTC, Nitrogen gas, Refrigerant gas, to and fro transportation and handling complete.
All as per item No.1 above but split type AC unit 2 TR capacity.
M&L for taking down the damaged condenser fan blade of 1.5/2 TR capacity split type AC and supply & fixing suitable new fan blade and testing & commissioning the unit complete all as specified as directed by the Engineer-in-Charge.Make: CARRIER/BLUE STAR/LG/LLOYD
M&L for taking down the damaged blower unit of any make 1.5/2 TR capacity split type AC and supply & fixing of new blower unit of suitable type and testing & commissioning the unit complete all as specified as directed by the Engineer-in-Charge. Make: CARRIER/BLUE STAR/VOLTAS/LG/LLOYD
M&L for taking down the unserviceable temperature sensor probes and supply & fixing new sensor probe of existing make and capacity for split type AC unit and testing & commissioning complete all as specified as directed by the Engineer-in-Charge. Make: Siemens/Blue star/Carrier/LG or any make as approved by the GE.
M&L for taking down the defective unserviceable printed circuit board and supply & fixing of new printed circuit board of existing make and capacity for split type AC unit complete all as specified and as directed by the Engineer-in-Charge. Make: Siemens/Blue star/Carrier/ABB or any make as approved by the GE.
M&L for taking down the defective unserviceable sealed Outdoor fan motor and supply & fix new sealed fan motor of existing make and capacity for 1.5/2 TR capacity split type AC complete all as specified and as directed by the Engineer-in-Charge. Make: AUE/FREE FLOW
M&L for taking down the defective unserviceable sealed Indoor fan motor and supply & fix new sealed fan motor of existing make and capacity for 1.5/2 TR capacity split type AC complete all as specified and as directed by the Engineer-in-Charge. Make: AUE/FREE FLOW
M&L for taking down the damaged air filter set and supply & fixing new air filter set of existing make and capacity for 1.5/2 TR capacity split type ACs complete all as specified and as directed by the Engineer-in-Charge. Make: Siemens/Blue Star/Carrier/LG or any make as approved by the GE.
M&L for taking down the defective unserviceable running capacitor and supply & fixing new 36/45 MFD running capacitor, +5% SH, 440 Volts, AC 50/60HZ and testing complete all as specified and as directed by the Engineer-in-Charge. Make: Sarada/Unistar
M&L for taking down the defective unserviceable running capacitors of combination 45/2.5/45/4 MFD, +5% SH, 440 Volts, AC 50 Hz suitable for compressor, out door unit fan motor of the split unit 1.5/2 TR capacity and testing complete all as specified and as directed by the Engineer-in-Charge. Make: Sarada/Unistar
M&L for taking down the defective unserviceable starting capacitor 80/100 MFD, 230 Volts, 50Hz and supply & fixing the new starting capacitor of the same capacity to split/window type ACs and testing complete all as specified and as directed by the Engineer-in-Charge. Make: Sarada/Unistar
M&L for taking down defective unserviceable running capacitor for out door unit/window type ACs and supply & fixing new capacitor of 4/6 MFD, 440 Volts, AC 50 Hz and testing complete all as specified and as directed by the Engineer-in-Charge. Make: Sarada/Unistar
M&L for taking down the defective unserviceable starting relay and supply & fixing new relay suitable for 1.5/2TR window/split type ACs and testing complete all as specified and as directed by the Engineer-in-Charge. Make: ARAVIND/SHRIRAM
M&L for taking down the defective unserviceable thermostatic switch and supply & fixing new thermostatic switch suitable for window type ACs and testing complete all as specified and as directed by the Engineer-in-Charge. Make: Ranco/Danfoss/Honeywell/Indfoss
M&L for taking down the damaged drain pipe and supply & fixing of new insulated drain pipe suitable for split type ACs complete all as specified and as directed by the Engineer-in-Charge. Make: Siemens/Blue star/Carrier/LG or any make as approved by the GE.
M&L for taking down the burnt outdoor unit fan motor, rewinding, overhauling, renewal of worn out shaft & bushes and fixing to the unit of 1.5/2 TR capacity split units complete all as specified and as directed by the Engineer-in-Charge. Make: Siemens/Blue star/Carrier/LG or any make as approved by the GE.
M&L for taking down the defective unserviceable sealed indoor fan motor rewinding, overhauling, renewal of worn out shaft & bushesof unit of any make split unit of 1.5/2 TR capacity and suitable for split type ACs complete all as specified and as directed by the Engineer-in-Charge. Make: Siemens/Blue Star/Carrier/LG or any make as approved by the GE.
M&L for taking down the burned wiring kit and supply & fixing and testing of new wiring kit suitable for 1.5/2 TR capacity split and window type AC units complete all as specified and as directed by the Engineer-in-Charge. Make: Siemens/Blue Star/Carrier/LG or any make as approved by the GE.
M&L for taking down the defective sealed compressor of refrigerator 180/230 Ltrs. capacity and replacing with new sealed compressor, flushing out the cooling coil, condenser brazing the refrigerant lines, leak testing, pressure testing, purging, vaccumissing, charging of gas, testing & commissioning includig to and fro transportation to workshop and fixing back in location complete all as specified and as directed by the Engineer-in-Charge. Make: LG/HITACHI/INDFOSS
M&L for taking down the corroded air cooled condenser and supply & fixing of new air cooled condenser suitable for 1.5 TR capacity split AC complete all as specified and as directed by the Engineer-in-Charge.
Supply & filling refrigerant gas R-22 /R32/R410 A for charging of 1 TR to 2 TR capacity split, window type AC and any Capacity of referigerator, Deep Frezeer and water cooler all as specified and directed by Engineer-in-charge.
Dismantling of Split type Air conditioner of any make 1.5/2 TR capacity and refixing in new location complete all as specified and as directed. Note- The above quoted rate includes filling of referigerant gas and fixing of new stand and all tools and acessories required during the installation.
Attending the complaints as directed by the Engineer-in Charge for carrying any nature defects complete of Window type AC , Split, , Water cooler, Refrigerator and Deep freeze , specified and as directed. Note : (i) Supplying of new accessories/components required for the system shall be measured & paid separately. (ii) Old serviceable accessories / components obtained from dismantling shall be refixed as directed by Engineer -in - Charge. (iii) Completion of job will be considered only after complete rectification of defect upto satisfaction of Engineer -in - Charge (iv) Complaint shall be attended on the same day of obtaining complaints from User end & intimate to JE incharge by evening. If not done penalty of 300 will be Imposed . (v) Rate for necessary stationary for complaint register & complaint slips shall be deemed to include in quoted rate.
ROHANPUSAN AUTO POWER LINE
SRI SAI BABA AGENCIES
G S ASSOCIATES
LAVANYA ENTERPRISES
Grace Info Systems
stage.html
html • 0.03 MB
finance_539624.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .